Epstein Files

EFTA01108081.pdf

dataset_9 pdf 309.7 KB Feb 3, 2026 1 pages
C.G.C.G. TILE & MARBLE DISTRIBUTORS 1715 North Dixie Highway Lake Worth, Florida 33460 i ncos roa .s r to (561) 547-8771 Page No of t_ Pages 3766 JOB NAME/NO. Fax (561) 547-0742 Epstein Residence LOCATION To: leffrey_Epstein Same 3_58_El Brill° Way PHONE DOT: Palm Beach, FL 33480 12/13/2013 Attention: Janusz We hereby submit specifications and estimates for: 1) ExcavatIon/UndergroundlSlabwork: Remove existing grass, soil: prepare sub base. Remove existing concrete slab & marble. Install new 4" concrete slab wIfiber. Cut expansion joints at concrete slab. Supply & install new sprinkler pipes to each palm tree planter. Connect 3 gutters with 3" PVC pipes and install to outside of wall. Core drill holes through wall for gutter and drain pipes. Supply & install PVC channel drain 5"x5"x97' and connect to 3" pipes to outside wall. Supply and install 3/4" plywood on top of driveway and steps for protection. Provide engineer's plan for permit. $ 56,820.00 2) Material: Supply 3600sf of 36"x36" Filled & Honed Italian Veincut Travertine - special ordered from factory (approx. 60-90 day lead time). $ 106,200.00 3) Installation: Supply and install heavy rubberized membrane at cold joints in slab = 675.00 Mud-set marble in all white setting bed to pitch away from house towards PVC drainage system. Includes creating 28 palm tree planters 5'x5' with flat, honed edges. Includes 20" wall planter perimeters at East and South walls: 3150sf = $ 40,792.50 Impregnating sealer = $ 2,047.50 4) FreighUDelivery: Estimated freight and delivery = 850.00 5) Permit/Processing: Permit, NOC, and processing fees TBD & to be added to proposal. TBD CONDEFMNS (;oNERAING f HIS PROPOSAL: 1. CGCG stall nor be responsible (or crating or shade. cow and uniformity vacations. as thme ekerrents art intrinsic in commies and marble. L:nlest nptetwy agreed. all ...ink is ro he done doing rtpilar Foxiness Fouts 3. CGCG shall not be responsible for danxages to =Moat caused by other trait:men ;din. sera:chick bailor. famish. cz.). 4. COCO shall rim be responsible for settling cruets on cement slabs. S. If mechanical equipment is requited to renow holing Poor sudaccs. CCCG will take reasonable ptetaatioas. but dull nor be rcsponslbk for dot andlor damages caused by the removal Kitten. 6. is the event true CGCG has to make et:penance for eolkoicm of money doe under this contract. the oiler party shall be Stec for such expend/cues incurted. T. CGCG shall nix: be responsible for delays inrxintd due to rause. heywl rlw control of COCCI S. Owner InpuniatriC for inspecting beak. Final payment con,lnitC5 full acceptance. 9. Any alietation at devotion from the above specifications SEIIII becorne a c to charge ewes and above this proposal. JO. The ab-oc ekraes shalt rake powedcree nse, alt) conflicting provisions contained in any plans. specifications, a paws contact detunicros. C Two-hundred and seven thousao hundred eighty-five and 0W100** dollars (S 207 385.00 ) Payable as follows: 5.01YO_Qf Items 1 & 2, plus permit/processing due of Item 2 upon (Wdhout Permit. etc.) upon.anivalamaterial;_balance_oLltem 1 due thereafter Authorized Signature.- NOTE: This proposal may be withdrawn by us if not accepted within 20 days. ACCEPTANCE OF PROPOSAL The prices, specifications and condif s satisfactory and are hereby accepted. You are authorized to do the \ above work as specified. Payment wi e made as outlined above. Signature: Date: 1 WHITE COPY - COCCI • YELLOW COPY - CUSTOMER EFTA01108081

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
fba3fe10-6163-4c3c-9015-e47576f4ac83
Storage Key
dataset_9/EFTA01108081.pdf
Content Hash
5e40c078d57ff428738a63923a5b4862
Created
Feb 3, 2026