EFTA02359067.pdf
dataset_11 pdf 136.3 KB • Feb 3, 2026 • 2 pages
From: Larry Visoski
Sent: Tuesday, May 16, 2017 11:05 PM
To: Je vacation
Subject: Claire
Jeffrey,
Just to confirm,
Is this the emai= you want sent to Bob?
Thx
Larry =/div>
=ote:
=div>
Dear Darren,
Our=leadership has instructed me to send you our final offer as follows;=/font>
1.&nb=p; =The purchase price to remain at 17.5 M
<=pan style="font-size: 19px; background-color: rgba(255, 255, 255, 0);">2.=nbsp; &n=sp;The high time
engine will be replaced with the original engine
3. The two additional aux fuel tanks which=were recently located will be included in the loose equipment
list4=ont>
4. The pre-buy inspection and the delivery to b= at Abu Dhabi International (Etihad Engineering) which is an
MRO approved b= both GCAA and FAA, or within UAE as long as it is an FAA/GCAA approved fac=lity audited by Royal
Jet.
5. &n=sp; Royal let=will be responsible for any discrepancies with the agreed cap of 500,000 ab=ve which
Royal Jet can either elect to pay for the discrepancies or to refu=d the pre-buy inspection costs
6. &nbs=; Pleas= note that Royal Jet will only address airworthy items and any cosmetic ite=s shall not be
considered as a discrepancy; as such there will be no touch u= work on the interior wood work done, and the condition
of the woodwork sho=ld not be a reason for rejecting the aircraft
=span style='font-size: 19px; background-color: rgba(255, 255, 255, 0);">W= do agree to include in the delivery
condition that there shall be issued b= the GCAA, in form and in substance satisfactory to the FAA, as determined b= a
duly authorized designated airworthiness representative of the FAA selec=ed by Purchaser in its discretion, an export
certificate of airworthiness.<=span>
=div>
With regards to your request about items and m=tters that require correction in order for the aircraft to be
qualified for=issuance of a U.S. Certificate of Airworthiness; we fully realize that the i=tention is to register the aircraft in
the USA, however, we would appreciat= your understanding that we cannot expose ourselves by committing to fulfil=ing
requirements that are unknown to us. Therefore, and since the DAR would=in any case be involved with the issuance of
the export certificate, we req=est that this item remains deleted as suggested in the last draft purchase a=reement
which was sent through (unless there would be a way to know beforeh=nd what such requirements would entail).
This=offer is of course subject to agreeing and signing a binding purchase agree=ent between the parties and if
the buyer is willing to proceed, then we wou=d request that the text of such purchase agreement is agreed upon no
EFTA_R1_01347049
EFTA02359067
later t=an Thursday, 27th October, 2016 (preferably before), and for the pre•buy inspection to sta=t as soon as possible
thereafter.
We look for=ard to hearing from you soon.
Best Regard=
<image001.png>
Claire Brugirard
Sales Manager
=/div>
Sent from my iPad
=
2
EFTA_R1_01347050
EFTA02359068
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- f0413267-841b-46b8-a379-39ad176d6f9c
- Storage Key
- dataset_11/EFTA02359067.pdf
- Content Hash
- 16236e478ebf2005933068776acdce44
- Created
- Feb 3, 2026