EFTA01837906.pdf
dataset_10 PDF 215.0 KB • Feb 4, 2026 • 5 pages
To: Warwick Wic
Cc: Gary Kerney Tom Sze
jeeyacation@gmail.coreeyacation©gmail.com]
From: Gary Kerney
Sent: Wed 2/23/2011 7:35:33 PM
Subject: Re: flagpole pool
I was in physical therapy when you called ,any time tomorrow ok
Sent from my iPhone
On Feb 23, 2011, at 3:10 PM, "Warwick Wicksman" ‹ > wrote:
Gary,
Please let me know when we can speak about this more. I am
concerned about just drawing something up, and having it built, with
no real "design". I do not recommend building the pool house with no
relationship to the design of the adjacent cabana structures. This will
be pretty visible from above when Jeffrey flies in, and from the sea,
and it needs to look right.
I am available today until 12 LA time, or 2-4. Also tomorrow after
10am LA time.
Thanks,
Warwick
Warwick Wicksman, AIA
Princi al
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
Into://www.Genslencom
Click here to view Genslees 2010 Annual Report
EFTA_R1_00219692
EFTA01837906
From: Warwick Wicksman
Sen • W n F r 2 11 7:22 AM
To: • Tom Sze
Cc: leevacationOgmail.cornI;
Subject: Re: flagpole pool
I'll get you a proposal for plans sections and elevations today.
Thanks,
Warwick Wicksman
Principal
Sent from my BlackBerry Device.
From: Gary Kerney ‹ >
To: Warwick Wicksman; Tom Sze
Cc: Jeffrey Epstein <ieevacationeomail.com>; William Rowles
Sent: Wed Feb 23 07:20:27 2011
Subject: RE: flagpole pool
Warwick
It is a very simple building,and I gave you the design outline,) will do structuals here and we are
using trusses,' would think you can get me a set of drawings in a couple days.
Please call me
Gary
From: Warwick Wicksman [mailto
Sent: Tue 2/22/2011 8:13 PM
To: Gary Kerney; Tom Sze
Cc: Jeffrey Epstein; William Rowles;
Subject: RE: flagpole pool
Gary,
EFTA_R1_00219693
EFTA01837907
I got the sketches you sent, and attached is an updated plan sketch based on the new comments.
But I am confused about what you arc asking us to provide. Our proposal was for
conceptual design. It sounds like you are jumping from that to permit drawings in one
week. Is that what you now need? And who is engineering the building, including the slab
and foundations?
Thanks,
Warwick
Warwick Wicksman, AIA
Princi al
Gensler
2500 Broadway
Suite 300
Santa Monica. California 90404
USA
htio;liwuw.Genski.com
Click here to view Genslees 2010 Annual Report.
From: Gary Kerney [mailso
Sent: Saturday, February 19, 2011 7:09 AM
To: Warwick Wicksman; Tom Szc
Cc: Jeffrey Epstein: William Rowles-
Subject: flagpole pool
Wawick
Specifications for construction development drawings.) need a quick turn around ,can form slab next
week.
Revised bath and kitchen programs attached
Revised site plan attached
BUILDING
EFTA_R1_00219694
EFTA01837908
block structure
10' ceiling
plaster finish in and out
truss roof
insulated and corr.metal roofing same as main compound
crown molding and copper gutter same as main compound
roll down hurricane shutters on 8' sliding glass doors(jeffrey mirrored?)
mechinacial awnning over sliding door
all other doors slabs
INTERIOR
floors stained concrete floors
manufactured kitchen cabinets
30" refrigerator
30"range
Ice maker
dbl. sink
bath to be ceramic tile floor and shower(small I "+-)
wood vanity top,with vessel sink
Grope shower fixtures all other American Standerd or eq.
corner sconces in livingroom
recess can liting
all liting on dimmers
all base wall outlets to be 1/2 switched
POOL
EFTA_R1_00219695
EFTA01837909
current thinking to reflect on next generation of image review
10x30 shade structure one each side
2x2 plaster col's 9' high
10" thick solid top ( 2' overhang?)
ceiling cans,col. sconces,ceiling fans
EFTA_R1_00219696
EFTA01837910
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- e94b09d1-b3cd-44c7-9a67-9971b32336cf
- Storage Key
- dataset_10/595e/EFTA01837906.pdf
- Content Hash
- 595e233ead1a37aa531fb1485066a262
- Created
- Feb 4, 2026