Epstein Files

EFTA02110383.pdf

dataset_10 PDF 1.8 MB Feb 4, 2026 29 pages
richardkahnl2 mail.com rom: Lvjet Sent: Mon 3/24/2014 8:37:12 PM Subject: Fwd: updates I ment to include you both on this email to Jeffrey, It appears he was not please or surprised when I informed him of the 24 month inspection that is due in 90 days June 30th, so I sent Jeffrey the DUE list that I review every week, (sometimes). - -also, JE wanted to depart ST THOMAS at midnight April 4th to arrive in Phoenix to clear customs,. flight time is 7+10min,. that would have us land in PHX at 5am,.. however, Customs is open only, 830am to 4:30pm for hours of operation. "' JE wants a small plane charter for March 31st, St Martaan to St Thomas, maybe they are arriving on airlines from EU? SEE update to JE below, thx Larry ---Original Messa e---- From: Lvjet > To: jeevacation Sent: Mon, Mar 24, 2014 4:28 pm Subject: Re: updates Jeffrey, PHX Customs flight OK,. April 4th ? Customs is not enforcing Overflight, as long as operator has obtained Overflight in the past. (as we have), we are allowed to fly into any AOE (Airport of Entry). with prior approval. Phoenix Customs hours of operation Monday - Friday 8:30am - 4:30pm only, no overtime according to officer on duty. Phoenix will approve overflight after they review passengers listed on EAPIS for this flight on April 4th and we must land between the hours of 8:30am and 4:30pm Monday - Friday. OUTFLOW Valve: Gulfstream Tech ops has to locate in their archives the original drawings for our GIV serial number, 1085, this has been our delay in getting an answer and or approval, whether Gulfstream will use other installation drawings or fabricate New ones for procedure to install new louvers,. I have contacted Rusty Crammer our DU885 Sales Rep, to assist with pushing Gulfstream to give an answer regarding installing other style outflow valve louvers, CHARTER St. Martaan to St Thomas March 31st, 2014 St Thomas Jet Center Charter has Twin Engine Piper Navajo Panther, (similar to our past Cessna 421). price St. Martaan to St Thomas $1,920.00 all fees and Handling included. GIV Due list below with dates,. Below is my due list for Gulfstream IV that will take me thru November 2014,. calendar items and inspections are sometimes hidden in these reports,. many items are complied with during routine Mx visits to Teterboro and Islip to keep the GIV operating as smooth as possible. In the future I will give a minimum of 12 month waming of impending inspections that will come due, so we can address Mx scheduing properly, Select a compliance (unction: Aircraft Due List: Ordered by next due based on Click Here to Select Function utilization GoTo: ATA Code Management GoTo: LogBook/MTR Entry for Checked Items GoTo: Maintenance Due List EFTA_R1_00730426 EFTA02110383 RPT: Airframe Times Due List (ATA Code w Ref) RPT: Airframe Times Due List (ATA Code) RPT: Airframe Times Due List (Due Date w Ref) RPT: Airframe Times Due List (Due Date) RPT: Airframe Times Due List By Group (ATA Code) RPT: Airframe Times Due List By Group (Due Date) RPT: Component Transaction (Part Rem) for Checked RPT: Current Status of Checked Items RPT: Due List (ABS) RPT: Due List with Projected Due Date (ATA Code) RPT: Due List with Projected Due Date (Due Date) RPT: Excel Output for Checked Items RPT: Maint Quote Related (Excel) for Checked RPT: Maint Quote Related for Checked RPT: Maintenance Due List (ATA Code) RPT: Maintenance Due List (Due Date) RPT: Maintenance Due List (STD) RPT: Maintenance Due List By Hrs/Cyc/Date (STD) RPT: Maintenance Quote (Excel) for Checked Items RPT: Maintenance Quote (STD) for Checked Items RPT: Mechanic Signet (ABS) for Checked Items RPT: Mechanic Signoff (STD) for Checked Items RPT: Mechanic Signoff With Related for Checked RPT: Parent Child Signori for Checked Items RPT: Status Summary (STD) Of Checked Items RPT: Task Card Package for Checked Items Updating Due and Remains Information ... Please Wait Retrieving data ... Please Wait Includes recurring and mandatory service information that have not been accomplished All related codes due within the projection are included Projected Through Hours:8802.5 Landings:4057 Date:28 Nov 2014 Delta Select All Checkboxes I De.select All Chockboxos ATA Code Logbook Description Compliance Interval 353012 (P) Airframe Oxygen Bottle, #2 Portable - Removal / Installation 180 P/N: 176965S-M-B-3 SIN: 672761 Due: End Of Month Custom Frequency N 262562 (P) Airframe Portable H2O Fire Extinguisher (Aft Cabin) - 60 LI: Hydrostatic Test Due: End Of Month 15K 262631 (P) Airframe Portable Halon Fire Extinguisher (Right Cockpit) - 1 MC Inspection Tolerance +15 DAY Due: End Of Month EFTA_R1_00730427 EFTA02110384 E 262632 (P) Airframe Portable HaIon Fire Extinguisher (Forward Cabin) - 1 MO Inspection N 262633 (P) Airframe Portable Halon Fire Extinguisher (Aft Cabin) - 1 MO Inspection NNW N 320004 Airframe Main Landing Gear (Left) - Lubrication 4 MO N 320005 Airframe Main Landing Gear (Right) - Lubrication 4 MO 320006 (P) Airframe Nose Gear - Lubrication 4 MO Tolerance +15 DAY Due: End Of Month N 240178 Airframe Battery #3. Emergency Service 6 ':!OS Custom Frequency N 243105 (P) Airframe Battery. #1--Capacity Check 6 ',I OS PIN: RG-380E-44 SIN: 40336977 Tolerance +1/-1 MOS Custom Frequency EFTA_R1_00730428 EFTA02110385 2 MOS 243106 (P) Airframe Battery. #2--Capacity Check '.105 PIN: RG-380E-44 SIN: 40494892 Tolerance +1/-1 MOS Custom Frequency 12 MOS : 346019 Airframe FMS No. 1 NDB - Update 28 DA Tolerance -8 DAY 346020 Airframe FMS No. 2 NDB - Update 28 DP Tolerance -8 DAY 346021 Airframe FMS No. 3 NOB - Update 28 DP Tolerance -8 DAY Vi 254001 (P) Airframe Lavatory Compartment Above Floor - Inspection 1000 I- N 994002 (P) Airframe AD74-08-09 R3 Lavatory Paper and Linen Waste 1000 I- Receptacle Enclosure Access Door and Disposal Door Inspection IX 240260 (P) Airframe Emergency Securaplane Battery I Heater Assembly 48 MI No. 1 - Replacement Da0:, P/N: 160.0201-02 S/N: 1410 COS* 304003 Airframe Windshield Wiper Lock Pin - Lubrication / 6 MO Adjustment +ispAyi Due_Wit EFTA_R1_00730429 EFTA02110386 Of Month H 323112 (P) Airframe Landing Gear Emergency Air Bottle - Hydrostatic 36 M: Test Due: End P/N: 1159SCH233-5 SIN: 12398C1 Of Month E 381010 Airframe Filter Element, No. 1 Potable Water System - 6 MOS Removal / Installation P/N: 778000 SIN: 111 381025 (P) Airframe Potable Water System - Flush I Sanitize 6 MOS E 539516 (P) Airframe Antenna Interface - Inspection 72 MC Tolerance +15 DAY Due: End Of Month El 314007 Airframe FWC No. 1 Trend and Limit Monitoring - Data Download Custom Frequency 314008 Airframe FWC No. 2 Trend and Limit Monitoring - Data 90 DAY Download Custom Freque MI 340100 Airframe Reduced Vertical Separation Minimum (RVSM) 1000 HRS 12 Monitoring Policy 6 MOS Initia EFTA_R1_00730430 EFTA02110387 IX 262622 (P) Airframe Portable Halon Fire Extinguisher (Forward Cabin) - 12 MOS Weight Check +15 DAY Due: End Of Month X 262623 (P) Airframe Portable Halon Fire Extinguisher (Aft Cabin) - 12 MC Weight Check Tolerance +15 DAY Due: End Of Month 521080 (P) Airframe Inflatable Door Seal - Purging Procedure Tolerance +15 DAY Due: End Of Month N 710019 (P) Engine 1 Powerplant Internal - Inspection Tolerance +15 DAY Due: End Of Month El 710019 (710020) (P) Engine 2 Powerplant Internal - Inspection Tolerance +15 DAY Due: End Of Month fil 100310• Airframe CK AIRWORTHY DIRECTIVES 3 MC P/N: ? SIN: Due: End Of Month X 100320' Airframe CK SERVICE BULLETINS P/N: 9 S/N: Due: End Of Month EFTA_R1_00730431 EFTA02110388 212077 (P) Airframe Air Conditioning Shut-off Valve Filter (Left) - 24 MC Inspection Tolerance +15 DAY Due: End Of Month 212078(P) Airframe Air Conditioning Shut-off Valve Filter (Right) - 24 MC Inspection Tolerance +15 DAY Due: End Of Month 212115 Airframe Nose Compartment Cooling System - Operational 24 MC Test Tolerance +15 DAY Due: End Of Month -:213053 Airframe Cabin Pressure Warning Indication System - 24 MC Functional Test Tolerance +15 DAY Due: End Of Month / 213081 (P) Airframe Pressurization Safety Valve - Inspection 24 MC Tolerance +15 DAY Due: End Of Month X 213090 Airframe Cabin Pressure Controller (Manual Mode) - 24 (.1C Operational Test Tolerance +15 DAY Due: End Of Month : : 216097 (P) Airframe Air Cycle Machine Compressor Outlet Overheat 24 MC Switch (Left) - Trip Point Check Tolerance +15 DAY EFTA_R1_00730432 EFTA02110389 Due: End Of Month " 216098 (P) Airframe Air Cycle Machine Compressor Outlet Overheat 24 MC Switch (Right) - Trip Point Check Tolerance +15 DAY Due: End Of Month ".. 236010 (P) Airframe Static Discharger Wick (Left Wing) - Resistance 24 MC Check Tolerance +15 DAY Due: End Of Month 236011 (P) Airframe Static Discharger Wick (Right Wing) - Resistance 21 MC Check Tolerance +15 DAY Due: End Of Month 236014 (P) Airframe Static Discharger Wick (Left Horizontal Stabilizer) - 21 MC Resistance Check Tolerance +15 DAY Due: End Of Month 236015 (P) Airframe Static Discharger Wick (Right Horizontal Stabilizer) - 24 MC Resistance Check Tolerance +15 DAY Due: End Of Month :•: 237041 (P) Airframe CVR Underwater Locator Beacon (DK100 / DK120) - Operational Test Tolerance P/N: OK120 SIN: +15 DAY Due: End Of Month EFTA_R1_00730433 EFTA02110390 M 237047 (P) Airframe CVR Underwater Locator Beacon - Battery Voltage 24 MI Check (DK100 DK120) P/N: DK120 S/N: X 251125 Airframe Pilot / Copilot Inertia Reel - Operational Test 24 MC Tolerance), +15 DAY Due: End Of Month. N 261035 (P) Airframe Engine Alternator Overheat Switch (Left) - Trip 24 MC Point Check Tolerant& +15 DAY Due: End Of Month 261036(P) Airframe Engine Alternator Overheat Switch (Right) - Trip Point Check Tolerance +15 DAY Due: End Of Month N 261065 (P) Airframe Combined Hydraulic System Overheat Switch - Trip Point Check Tolerance +15 DAY Due: End Of Month r<:261066 (P) Airframe Flight Hydraulic System Overheat Switch - Trip 24 niC Point Check Tolerance +15 DAY Due: End Of Monti V 261235 (P) Airframe Bleed Air Manifold Overheat Switch (Left) - Trip 24 MC Point Check EFTA_R1_00730434 EFTA02110391 Due: End Of Month 261236 (P) Airframe Bleed Air Manifold Overheat Switch (Right) - Trip Point Check Tolerance +15 DAY Due: End Of Month 261440 (P) Airframe APU Overheat Switch - Trip Point Check Tolerance +15 DAY Due: End Of Month El 262075 (P) Airframe Fire Bottle (APU) - Weight Check 24 MC IX 262155 Airframe Fire Pull Handle - Operational Test 24 MC Tolerance' +15 DAY Due: End Of Month Ns: 262165 (P) Airframe Fire Extinguisher System (Left) - Functional Test 24 MC Tolerance +15 DAY Due: End Of Month IX 262166 (P) Airframe Fire Extinguisher System (Right) - Functional Test Tolerance +15 DAY Due: End Of Month EFTA_R1_00730435 EFTA02110392 262170 Airframe Fire Extinguisher System (APU) - Functional Test 24 MC 303006 Airframe Standby Pitot Heat System - Operational Test 24 MC 303009 Airframe Total Temperature Probe Heat System - 24 MC Operational Test r7. 303012 Airframe Angle of Attack Heat - Operational Test 24 MC *15DINti EMI X 320010 (P) Airframe Landing Gear (Right Main) Corrosion Inhibiting 24 MC Compound Reapplication 431 320034 (P) Airframe Nose Landing Gear Corrosion Inhibiting Compound 24 MC Reapplication Oven Due: End Of Month EFTA_R1_00730436 EFTA02110393 V 321041 Airframe Main Gear Shock Absorber (Left) - Service 24 MC V 321042 Airframe Main Gear Shock Absorber (Right) - Service 24 MC M 322006 (P) Airframe Nose Gear Shock Strut - Friction Check 24 MC 322028 Airframe Nose Gear Shock Strut - Service 24 MC +15 DAY Due: End Of Month N 323025 (P) Airframe Main Gear Side Brace Fitting Pin (Left) - Inspection 24 MC 121212110 +15 DAY Due: End Of Month ".: 323026 (P) Airframe Main Gear Side Brace Fitting Pin (Right) - 24 MC Inspection Tolerance +15 DAY Due: End Of Month ' i. 362005 Airframe Bleed Air Manifold Pressure Indication - Functional 24 MC Test Tolerance +15 DAY EFTA_R1_00730437 EFTA02110394 Due: End Of Month 510070 Airframe 24 Month Honeycomb (Aluminum Panels Only) - Inspection / Bond Test Tolerance +15 DAY Due: End Of Month 521007(P) Airframe Main Entrance Door - Inspection 24 MC Tolerance +15 DAY Due: End Of Month Ig 521024 (P) Airframe Main Entrance Door Hinge Pins - Inspection 24 MC IX 521051 Airframe Door Seal Pressure Regulator - Functional Test 24 MC rdl 532017 (P) Airframe Cockpit Compartment Above Floor - Inspection 24 MC Tolerance +15 DAY Due: End Of Month El 532019 (P) Airframe Cockpit Compartment Below Floor - Inspection Tolerance +15 DAY Due: End Of Month EFTA_R1_00730438 EFTA02110395 M. 532021 (P) Airframe Cockpit Compartment Below Pedestal - Inspection 24 MC 103091 +15 DAY Due: End Of Month 532027 Airframe Entrance Compartment Behind Panel - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 532029 Airframe Entrance Compartment Above Floor - Inspection 24 MC Tolerance +15 DAY Due: End Of Month . 532031 (P) Airframe Entrance Compartment Below Floor - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 532033 (P) Airframe Entrance Compartment Shelf - Inspection Tolerance +15 DAY Due: End Of Month 181532041 (P) Airframe Baggage Compartment Above Floor - Inspection 24 MC Tolerance +15 DAY Due: End Of Month I 532045 Airframe Baggage Compartment Behind Panel - Inspection EFTA_R1_00730439 EFTA02110396 Due: End Of Month 532050 Airframe Engine / APU Fuel Feed Line - Inspection 24 MC Tolerance +15 DAY Due: End Of Month ' 532052 (P) Airframe Torque Box - Inspection Tolerance +15 DAY Due: End Of Month 532055 Airframe Fuselage Interior i Wing Attach - Inspection Tolerance +15 DAY Due: End Of Month 532070 Airframe Shear Clips Aft Fuselage - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 3000 Hrs Init 533005 Airframe Exterior Fuselage - Inspection 24 MC Tolerance +15 DAY Due: End Of Month H 535008 (P) Airframe Nose Compartment / Radome Interior - Inspection 24 MC Tolerance +15 DAY EFTA_R1_00730440 EFTA02110397 Due: End Of Month 535012(P) Airframe Tail Cone Interior - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 562005 (P) Airframe Emergency Window Release Mechanism (Internal 24 MC and External) - Functional Test Tolerance +15 DAY Due: End Of Month ' 783005 (P) Airframe Engine Thrust Reverser (Left) - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 783006 (P) Airframe Engine Thrust Reverser (Right) - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 236020 (P) Airframe Static Discharger Wick (Tail Cone) - Resistance 24 MC Check Tolerance +15 DAY Due: End Of Month 243030 (P) Airframe Auxiliary TRU - Inspection / Cleaning Tolerance +15 DAY Due: End Of Month EFTA_R1_00730441 EFTA02110398 fill 243189 Airframe Battery Circulating Fan - Operational Test 24 MC Ill 262621 (P) Airframe Portable liaIon Fire Extinguisher (Right Cockpit) - 12 MC Weight Check Tolerant:4 +15 DAY:j Due: End! Of Month: 320009 (P) Airframe Landing Gear (Left Main) Corrosion Inhibiting ',IC Compound Reapplication Tolerance +15 DAY Over Flight Due: End Of Month M323004 (P) Airframe Landing Gear - Emergency - Functional Test Tolerance +15 DAY Due: End Of Month BI 527012 Airframe Tail Compartment Door Waming System - 24 MC Operational Test Tolerance +15 DAY Due: End Of Month DA 532067 (P) Airframe Tail Compartment Above Floor - Inspection 24 MI 571064 Airframe Wing to Fuselage Attachments (Left) - Ultrasonic 24 MC and Visual Corrosion Damage Tolerance Inspection tolerance. EFTA_R1_00730442 EFTA02110399 twit got OfMorilh •. 783009 Airframe Engine Thrust Reverser (Left) - Operational Test 24 MC Mint 05:DAYI Z 783010 Airframe Engine Thrust Reverser (Right) - Operational Test 24 MC Thiatth +15 DAVI Due: Emil Of Monifi 7.1 212200 (P) Airframe Display Unit Fan Fitter - Inspection 450 HF Tolerance +151-Irs 273019 Airframe Elevator Trim Tab Actuator (Left) - Lubrication 450 - 5 Tolerance +15 Its 273020 Airframe Elevator Trim Tab Actuator (Right) - Lubrication 450 'h,5 Tolerance +15 Ws S 344051 (P) Airframe IRU No. 1 Blower Filter - Inspection 450 HF PIN: 26000790-101 SIN: EFTA_R1_00730443 EFTA02110400 +15 Hrs Tolerance +15 Hrs 344055 (P) Airframe IRU No. 3 Blower Filter - Inspection 450 HF PIN: 26000790-101 SIN: Tolerance

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
e3a05550-3a16-462c-887d-0d917bfc8ef7
Storage Key
dataset_10/0d1c/EFTA02110383.pdf
Content Hash
0d1ce2a8c17ea81dc6cfaf6b315b5267
Created
Feb 4, 2026