From: Craig Martin
Sent: Friday, May 1.1,1111.1 M.
To: Jeffrey Epstein
Subject: Brian's and John's work schedule
FYi,
=div>5 Palms Window installation. The window company brought their three he=pers. As part of their contract they
needed help lifting the windows in pl=ce. L51 workers did help to hold windows as the glass company installed. B=ian
and John were part of that team.
Brian's Work=Schedule;
Monday
• Work on maintenance tru=k; drill and replace 5 lug nuts
• Helped out in mechanics area as al= mechanics werentremed
• Cleaned work shop
Tuesday
• Finished manufacturing and installing parts on s=n dial
• Demolition of maintenance yard
• =span>Clean Trailers, ready for sale
Wed.
• Fix Nanna Trailer, Every part new
• Installed two new benches with Peter
• Unload Tropical and MSI delivery to 5 Palms
• Finish cleaning out 3 40 Ft containers, relocate items
• Remove =anhole cover at flag pole pool
Thurs.
Install desk at grotto
• install second desk at =ost u less
• Help fix JCB
* Deliver =ement board to S palms
John's work Schedule;
Monday;
• Master bedroom install exterior hooks
• Interior, adjust shutte hold back hook
• New weather strip in re=ax bathroom and door
TOES;
• Dismantle= shelves in trailers and maintenance work shops
EFTA_R1_01712573
EFTA02554874
Wed.
Reset door stop and weatherstrip in relax room
* <=pan>Complete door, paint and fill with bondo
Work on =esk for grotto
Remove fan housing gazebo/ cottage , repaint two fans
Thurs
Remove =an housings flag pole, repaint 2 fan housings
trailer=clean out project, relocate all household small items
Craig
=idiv>
2
EFTA_R1_01712574
EFTA02554875
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- e2ef737f-ba31-4351-9da8-b97df07062ff
- Storage Key
- dataset_11/EFTA02554874.pdf
- Content Hash
- 31ff0573c3e4f625bed4e2e80b87e836
- Created
- Feb 3, 2026