EFTA02035875.pdf
dataset_10 PDF 52.2 KB • Feb 4, 2026 • 1 pages
To: jeevacation@gmail.com[jeevacation@gmail.com]; Brice
Cc:
From: ryilc i
Sent: Fri 2/17/2012 3:35:10 PM
Subject: fiber to Info center, Directional antana to 5 palms, to Kit house.
Brice,
Jermaine and I put our heads togeather and came up with this. If we do the fiber run from Flag Pole
pool to the Info Center we would be able to use the Directional Antana to connect to 5 Plams and then
from there to Kite House with another Directional Antana.We have the antana on island now,and we
already have the conduit in place and the Fiber on hand to do the run from the Pool to the Info Center.
This could save $770.00 in T conduit,$ 2,940.00 in labor from Glidden and another $916.00 in Fiber
cost. This would save $4,326.00
The draw back is you would not be able to have voice over IP phones in 5 Palms or the Kite
House, you would have to use a cell phone. Anyway its just a thought before we order conduit.
Gary
EFTA_R1_00548628
EFTA02035875
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- a5e685c8-a8b4-41d8-a934-2d2ef3d81945
- Storage Key
- dataset_10/09f1/EFTA02035875.pdf
- Content Hash
- 09f1022da94e692717940d973e90ac76
- Created
- Feb 4, 2026