EFTA00582905.pdf
dataset_9 pdf 60.0 KB • Feb 3, 2026 • 2 pages
BIOIMPACT, INC.
P.O. BOX 132 KINGSHILL
ST. CROIX, U.S.VIRGIN ISLANDS 00851
340 690-8445 FAX 340 718.3800
bioimpact@islands.vi,
March 21, 2016
Jeffrey Epstein
Erika A. Kellerhals
Member
Kellerhals Ferguson Kroblin PLLC
9100 Port of Sale Mall Suite 15
St. Thomas, VI 00802
Re: Great St. James Permitting Dock Maintenance and RO intake installation
Dear Jeffrey and Erika,
This proposal includes the permitting of the maintenance of the existing dock through Coastal Zone
Management and US Army Corps of Engineers.
Dock Maintenance
WE need an as-built of the dock which shows the engineering details so that the agencies can see what
we are permitting. We can get Ryan Wisehart to draw the RO line and I can provide the details of the
intake. We will file for a minor modification and maintenance for the dock with both CZM and COE
since the dock is in good standing on its permits. This should take between 30 and 60 days to get the
permit from both agencies. It will take me only about another week to get everything together for the
application.
We have completed the field survey and are going to include an acsecsment of the existing condition
around the bay so that the agencies can know the condition of the area surrounding the dock that pre-
existed the purchase.
Maintenance Permit
The cost for the maintenance permitting and addition of the RO $4500.00
I look forward to working with you. I look forward to your earliest response. Please do not hesitate to
call if you have any questions or concerns.
Respectfull submitted,
Amy Claire Dempsey, M.A.
President, Bioimpact, Inc.
BIOIMPACT, INC. Page 1
EFTA00582905
BIOIMPACT, INC. Page 2
EFTA00582906
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 99013f31-c537-4a2f-b283-6fdd73a08866
- Storage Key
- dataset_9/EFTA00582905.pdf
- Content Hash
- b2ed0f59003faf9b837a4739d0a0a366
- Created
- Feb 3, 2026