Epstein Files

EFTA01992962.pdf

dataset_10 PDF 71.0 KB Feb 4, 2026 1 pages
This is the manufactures recommended procedure for resurfacing of a diamond brite pool Tom recommends that we follow this procedure We have have recourse of they screw it up again Sent from my iPhone On Jan 31, 2012, at 9:57 AM, Jeffrey Epstein leevacation@gmail.com> wrote: we specifillcaly said that the plaster was not to be resurfaced but replayed„ both gary rex and i agreed. i m not sure why you are sending me this, On Tue, Jan 31, 2012 at 8:50 AM, brice gordon wrote: please note attached, paragraphs 2a and 2b from install info for diamond brite pools resurfacing projects, also spec sheets from Southern Grouts and motars, inc httpfisgm,cc/pdf/InfoSheets/Diamond Brite web.pdf the preparation of the main house pool will require that the diamond brite be totally removed so the 1 x 1 tile can be adhered properly Flag pool, heater relocation this week, Material is due to arrive STT, tomorrow, Saturday for resurfacing. refill saturday and sunday Main pool, heater done and running, materials ordered, expect everything to be on sight by the 20th Feb, empty the night of the 12th FEB to commence roughing out, 3 to 4 weeks for completion. EFTA_R1_00486405 EFTA01992962

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
92f36e85-7c3d-49d5-8189-eb5dc9cd4df8
Storage Key
dataset_10/32f0/EFTA01992962.pdf
Content Hash
32f0e2d2236a0b7e9d78f98de3b52f6a
Created
Feb 4, 2026