JE Punch List —Oct 2nd, 2012
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
- New seats for gators, pro gators, beach cleaner — EDA on STT 10/2
- Red Polaris Bike - Power Steering Module for ordered due NM — incorrect part arrived. LV sourcing in FL
- Beach cleaner — de-rust it, clean it — 70% complete
- Lull — non operational, sourcing a mechanic to complete repair
3. Computers/Phones
- Beach Office — no Internet, Phone, Timeclock — Jermaine will work at trying to resolve
4. Five Palms
- Furniture — outside furniture in place — Karen to tie down cushions to resolve wind issues, completed by 10/5
- Picture frame — measurements forwarded to Sarah - 86 x 70
- Mirrored siding — will continue to reglue — possible mural work
- Fiber Work/Phone - Complete
5. Grotto
- Mattress cover —JE approved buying fabric, fabric ordered due on site 10/5
6. Berm/Top of Hill
- Hydroseed outside — in progress
7. Triangle -
- Must design triangle - awaiting JE direction
- Need to review new Palm installation — heli approach
8. Flagpole Pool Cabana
- Furniture — desk from Paris JE to select a fabric for seats, arriving on plane 10/1 — Sue
- review Bottle Palm lights — Danny
- clock
- Yellow ex pole — Carlos
- Closer on toilet door
- Hanging of pictures
9. Floating Dock
- Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis
- Table/Dock Box - Dock box top to be revarnished — Carlos has a possible solution
- Swim Ladder — direction from JE on placement required
10. Chillax Room
— Requires furniture piece for electrical/media equipment, review pieces that are stored in PBI — Sarah
11. Chillax Bathroom
- require blue rugs for bathroom & vanity area — Sarah
12. Mechanical Building Transformer — on LSJ 9/22
13. Boats
- Lady G — sell — in hurricane storage — offer $60K via JE, Rich to negotiate pricing
- Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000
- Big N — repair — at AYH dock — have Subbase & Bob Kassner quote — reviewing. Putting together an estimate for
Hydrologic Hoses & Fittings to be completed "in house" — all to be forwarded by 10/8
- Inside cleaning 3 days/2 pers $720.00 supervised by Carlos — approved JE
- doors/windows in progress — complete by 10/2
- cylinders/boxes in PR — EDA on STT 10/5
14. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees
15. Transient Surge Protection — due at Tropical 10/9
EFTA01107300
16. Landscaping — Peter's List
- Pop's Garden — need deer protection — Danny suggested install a motion detector with a strobe light - the deer will
activate the light and it should frighten them away — JE approved 9/24 — Danny sourcing
- Shade cloth — on LSJ — Peter installed one for JE review
- Clean mess, cut grass; trim all vines, acacia — owner's drive, blue beach, gym — work in progress
- Peter to clean the sides of the road — work in progress
- Black Heli Under Pads — install at top of bike path at MC — not enough on site to complete project. Larry forwarding
details — erosion matting
- Review growth of sea grape - engineering area
- Hydroseed all pull box areas & engineering
- Continue to line all roads with stones
- Take out the single tree in engineering - Peter might want to cut it, so not to damage lines
- PR Coconut Palms — planted at main entrance, blue beach (5), berm, Five Palms, MBR — completed 9/27
17. Roads
- General re-grading of roads — ongoing — Peter
- Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to
review details with Betteroads once back on site — week of 10/1
18. Library
- AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor
19. New Employee Bathrooms
20. Gym
- New punching bag — installation of the speed bag on hold 9/22 - per JE until visit
- New front & back doors installation — will complete after visit
21. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood required
22. LSJ Mooring — Darren forwarded to Army Corp for final approval — awaiting response
23. Hangar
- Fuel Containment Pad — draft approved, drainage incorporated — survey forwarded to the architect 9/18 - he will
complete the plan by 10/5, submit to DPNR for permitting (Cecile's update as of 9/21)
24. Steel shed — Buck Steel — JE approved mock-up 9/26, changes 9/27 — Buck Steel working on the final specs/quote
25. Equipment to be Purchased
- (1) light generator, (2) arms with lights to be hard wired
- (1) skid steer at Tropical — on LSJ 9/26
- (1) John Deere box and blade — Brice has recommended JD 5101E AWD — loader, scraper, digger, 100hp, enclosed cab
- (1) man-lift
- (1) golf cart — order another 1 possibility 2 — 4 seater
- (1) dump truck — JE approved purchase — 2012 Ford F450 - $15,000 deposit sent 9/25, shipment booked at Tropical
26. LSJ Mats — for all locations — ordered 9/22
27. Engineering — start emptying/relocating items in remaining 20 foot containers 10/15
28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them
29. Solar Lights — installation COMPLETE JE does not like the "white light", likes a "soft white" light —JE to review when
on site
30. Solar Quote — reviewed with Rich, submitted to JE 9/17 — now researching line loss on cable
31. Part Time Employees — Anna forwarded information of 2 potential part-time housekeepers to Karen 9/25 — Karen
meeting with them on 10/2
32. Heli Pad - reinstall windsock to north side of helipad - JE & Larry to review lights and windsock location when next
on site
33. Cisterns — need to be cleaned and sealed work to begin 11/1
EFTA01107301
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 912d2d16-41e8-43a6-8085-57f20a2a891b
- Storage Key
- dataset_9/EFTA01107300.pdf
- Content Hash
- 27ecfc2fd051c9e098eb56330b779db8
- Created
- Feb 3, 2026