EFTA01098766.pdf
dataset_9 pdf 48.2 KB • Feb 3, 2026 • 1 pages
Danny Vicars
Project List
-Mechanical Building: Complete move-in and organization of electrical
shop.
-Landscape Lighting: Continue adjustments to landscape lighting-stay
late for the next 3-4 weeks to fine tune.
-Landscape Lighting Timers: Upgrade timers.
-MC Pool: Switch out manifold & filters and install variable speed
pumps.
-Tunnel: Replacing overhead bulbs and ballasts and dropping down
from ceiling for ventilation.
-MC: Switch out solar lanterns to new electrical. Have on hand.
-Relax Room: Review air conditioning issue with Atlantic.
-Info Center: Replace inoperable fan.
-Flagpole Pool Cabana: Repair dryer.
-Flagpole Pool Cabana: Assist with kitchen renovation.
-Library: Review flickering bookshelf lighting and find solution.
-Pebble Beach: Check solar system.
-Relax Room: Assist with renovations.
-Water Pumps: Reset master/slave.
EFTA01098766
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 8d232d21-9ffe-479c-93ba-01ff803c5471
- Storage Key
- dataset_9/EFTA01098766.pdf
- Content Hash
- de44abb93a42d48ff8d90480f4076eb0
- Created
- Feb 3, 2026