FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
PARIS
STATUS ITEM COMMENT
+ NC 1. Change fat lady painting frame i) 11/10 — Chaser sent to Jean for date.
+ Update 2. AC in master bedroom — JE says ii) AC has been left on at the coldest temp. throughout apt
+ GM update thermostat is broken — a/c cuts since JE left as a/c co. sd problem was because the a/c was
off after 30 mins switched on and off.. AC Co. will test on Monday 14 Oct to
measure temp. and advise further.
+ NC 3. Rolling Cart iii) 4 Oct - Has arrived at 71s' — will go on plane on next trip to
Paris
+ NC 4. Safe iv) Pinto is purchasing and installing 4 Nov.
+ Update 5. Hang B/W pies - MBR loo & v) Valdson has hung pictures. Can't email pies as card readers
+ GM update boudoir loo malfunctioning. Pics expected Mon 14'h after computer
repaired
+ Update 6. Computer — New Card Readers vi) Computer guy updating virus & installing readers on
+ GM update for JE computer / Update anti Monday 14 Oct.
virus
* NC 7. Raise globe desk vii) 11/10 - Chaser sent to Jean for date.
viii)
+
+ 8.
+ Update 9. Photos for Apt ix) Two 8 x 10 — complete
x) One 12 x 8 — complete
xi) Eleven 11 x 151/2 (h) — 3 complete
EFTA00577780
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
xii) Seven 11 x 1512/ (v) — 5 complete
xiii) Nine 834 x 13 — not started
xiv) Three 714
/ x 1014
/ - not started
+ NC - old apt 10.Metal door @ entrance - JE xv) Building to meet to discuss
wants a door code
+ NC 11.Paint Boudoir walls and loo + xvi) Chaser sent to Jean
+ change carpet
+ NC Light Chinese tapestry xvii) Chaser sent to Jean
+
+ First aid This is to be found .....
EFTA00577781
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
NEW PARIS APT
STATUS ITEM COMMENT
+ NC 12.JE wants schedule for work — inc xviii) Proposal from Pinto expected 15 Nov
+ layout, construction and
decoration
+ Update 13.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16
+ Oct — Serge needs to approve first - windows will take 8
+ wks from approval
+ Update 14.5 x B/W pictures for Gym xx) Printed, framed at 65111— ready next trip to Paris.
+
+ Update 1. True Bike Shock Absorbers v) Ones that were purchased for Zorro will be sent to Paris
+ and new ones will be bought for Zorro.
+
+ 15.
+ Plse advise 16.Gates iv) All gate/door intercoms currently connected to door buzzers.
+ GM talk to ETC/Nick NS suggests that this be changed to ring on staff telephone
what is current story line? JE plse ok if approved.
EFTA00577782
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
PALM BEACH
STATUS ITEM COMMENT
4 NC 17.Automatic Hurricane Shutters i) Quote attached = $10,850.00.
for Remaining Sections of House All guest room shutters and small loo shutters are manual.
JE sd not to do anything at this time
+ Update 18.Wall ii) Amber is currently ill and has started to paint the fence and
wall betty. staff house and kitchen. She will continue when
she is well again.
+ Plse advise 19.Gates iv) All gate/door intercoms currently connected to door buzzers.
+ GM talk to ETC/Nick NS suggests that this be changed to ring on staff telephone
what is current story line? JE plse ok if approved.
4 NC 20.Stone dock steps JE to advise
+ Update 21.Sale of Mercedes Ad still running — no offers.
+ Update 22.A/C iii) Large fan arrived and other spare parts.
+ Talk to Rich
update First Aid Can be found in the cupboard in the downstairs powder
room. Defibrilator and additional first aid will arrive
+ Update 2. Pot plants i) GM Call Stopek
4 Update Frame and hang picture in Garden
EFTA00577783
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
room + frame and hang orher pic of
Zorro
EFTA00577784
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
457 MADISON
STATUS ITEM COMMENT
+ Update 1. Decorator for JE office i) Bastion supplied JE with info on proposed concept, and JE is
considering proposal.
EFTA00577785
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
301 EAST 66TH
301 EAST 66TH
STATUS ITEM COMMENT
+ Update 1.When do we get new apt — Size i).
EFTA00577786
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
EFTA00577787
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
KINNERTON STREET
STATUS ITEM COMMENT
+ NC 1. Painting of wall below trompe i) Painter will try and fit in around other jobs — no date set.
I'oeil
EFTA00577788
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
65TH STREET
STATUS ITEM COMMENT
+ Update 1. Security Products installation i) Installation will take place Tuesday 15th October.
+ NC 2. Original broken Air-Conditioner ii) Has been removed and vents will be installed in existing
in Office duct to ventilate office — By end of Nov Rich will complete.
+ Update hang picture frames and minors i) Installation will take place Tuesday 15th October.
+ NC 3. Canvass to replace Kline iii) Has been removed and vents will be installed in existing
duct to ventilate office — By end of Nov Rich will complete.
+ NC 4. Report on adding extension iv) Has been removed and vents will be installed in existing
duct to ventilate office — By end of Nov Rich will complete.
EFTA00577789
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STAFF
STATUS ITEM COMMENT
+ Update 1. Michael Lifman i) He will be traveling back from SA to NY with NS and ES
on the 5th November — JE wants to know where he will be
living
+ Update 2. Wiwid & Purni v) Letter has been done inviting them to the States and we are
looking into flights for arrival in the States during the first
week of November.
+ Update 5. Patrick — Evelyn's boyfriend iii) He will be flying from France to Miami on the 16 Oct with
provisional return date of 15 Nov. Evelyn will travel to West
Palm Beach on 16 Oct.
+ Update 6. Rick Harrington vi) NS showed Rick around 65th and 71st except for 3th & 4th JE
was in house) and he has Larry V's cellphone # & will
discuss plane security with him week of 15th Oct. Rick
going Zorro week of 15 Oct.
> V11 7. Richard (v) Richard needs to travel to Zorro to do checks and
preventative maintenance at MH. NS advises that Richard
travels when JE leaves for LA and Hawaii.
EFTA00577790
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
71ST STREET
STATUS ITEM COMMENT
+ Update 1. Front Door i) The exterior & interior of door expected completion due
18d' Oct — weather permitting.
+ Update 3. Safe Room Bolt ii) NS has consulted with Bob Oatman & Charles Miller & a
recommended company will be attending at 71g (early
week of 15th Oct) to view and then install further internal
turn bolt and locking devices — installation date to be
advised.
+ Update 4. Safe room keypad iii) Installation expected week of 21 Oct.
+ Plse advise 5. Security DSL Line iv) This is going to be hooked up 18th October — JE to advise
+ JE sd no if Richard to be able to access survey cameras from his
home computer.
+ Update 6. True Bike Shock Absorbers v) These have been replaced and an extra set has been
+ Remove purchased for the bike at Zorro — Richard will take with
him to Zorro and install.
+ Update 7. Control Boards for Exhaust vi) Purchased - will be installed by 16th October.
System
+ NC 8. Coloured Boards for entryway vii) No update from Pinto.
+ This should be under a sub heading of decoration on
same page
4 Update 9. Lighting viii) NS is meeting with Charles, Bill Bigelow and David
EFTA00577791
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
Wilbourne (Rockwell Group) on 15th Oct to review and
revise lighting contract.
4 Update 10. Converting part of basment in to vi) Purchased - will be installed by 16th October.
staff quarters
EFTA00577792
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
ZORRO RANCH
STATUS ITEM COMMENT
+ Update 1. Pew i) Delayed due to front gate - pews will start 8 Oct.
4 Update 2. Water Pump ii) Still awaiting delivery of pitless adaptor — expected
delivery 22 Oct.
4 Plse advise 3. Security Gate iii) Front entrance complete - Shannon is awaiting approval to
proceed with gate & cameras.
iv) NS has requested Rick Harrington to look into the security
quote received when he is at Zorro.
4 NC 4. Entry Gate v) JE will decide when he gets to Zorro height of lights
+ NC 5. Fountain vi) 3/10 - GM faxed Pascal to come up with new design.
+ Update 6. Map vii) Revised rough draft by 28th Oct.
+ Update 7. T1 Lines viii) Voicelines working.
ix) Delay in data lines to 29 Oct.
4 Update 8. Medical Training x) Set up for November 9th as only date available in Oct
clashes with JE visit to ranch. husband to give
medical training course for all staff prior to visit.
EFTA00577793
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
+ Update 9. Survey xi) All easements were resent to all families 10 Oct as Darren
made changes.
4 Update 10. Electricity Plumbing xii) Miller Bonded have started the piping in the water pump
building — completion expected 15 Dec.
xiii)
+ Update 11. Building for RO xiii) Building is up and new door (to replace wrong door
previously sent) should arrive 15 Oct.
4 Update 12. Guest vehicle for ranch ix) Larry is investigating a Mercedes Sprinter as per JE request
and is awaiting Mercedes dealer to respond.
+ Plse advise 13. MH Trees x) A few trees have died. Approx cost is $2000.00 (rental of
+ GM to call came labour to dig and replant) to transplant 5 pinons
(taken form ranch) to replace. JE sd yes to above — will
start JE wants price to transplant 50
)- Plse advise 14. 40 Ft Digital Screen xi) NS contacted Larry Jacobson (President) of Theatre
Resource Group. JE advised NS that he would like
conference call betw. JE, NS & Larry J. Lesley to advise
NS when JE will be available for conference call.
► Plse advise 14. First aid kits xi) Are located 1.
EFTA00577794
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
LITTLE ST. JEFFS
STATUS ITEM COMMENT
+ Plse advise 1. Yoga Deck i) JE sd fixed roof -.
+ GM talk Miles
+ NC 2. Floating Dock ii) Floats and hardware on island. Fabrication to commence once
new dock complete — on hold woodshop concentrating on
new gym & heli hut.
+ NC 3. Lookout House (Blue) Retaining iii) On hold — woodshop concentrating on new gym & heli hut.
Wall
+ NC 4. Build Side screen MBR & Move iv) On hold — woodshop concentrating on new gym & heli hut
Steps
+ NC 5. Plexiglass Weave Experiment v) On hold — woodshop concentrating on new gym & heli hut
+ Update 6. Telephone System vi) Telephone company on strike and not doing any new work —
system to be digitized once strike is over.
+ Update 7. Bali Shipment vii) Now expected delivery date is end-Oct.- Boat somewhere on
the ocean — no further up[date from co. available
+ Please advise 8. Bamboo Flagpoles viii) JE sd to purchase material. Material ordered expected
delivery.
+ Update 9. Sea Life Paintings x) Ongoing — Lady has been off island ill and will be returning
EFTA00577795
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
to LSJ Tuesday 15 Oct to continue.
+ NC 10. Glass Garage Type Doors xi) On hold — woodshop concentrating on new gym and heli hut.
+ Update 11. Sea Water Pump xii) Catalogue not sent by supplier was requested to send ASAP.
xiii)Supplier proving to be unreliable & Miles requested
assistance from John Savage who will provide alternative
suppliers. No date given.
+ Please advise. 12. Wind Generator / Large Beach xiv) Quote to supply electricity, distribution boards and
+ Cm to unerstand House circuited for the beach house will cost $15,900.00 — see
attached "A*". JE to please advise.
> NC 13. Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1
Nov. Miles received no drawings yet. Paul Kelly has
promised Miles design — no date given.
xv)
.* NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues
to spray roads with water to ease dust levels.
> Update 15.Music Systems / Electrical Cars xvii) Installation for Car # 2 complete.
xviii) Awaiting spare parts from Ford to rework electrics on
Car # 3 — backordered and expected on island 31 Oct.
Miles told to call regional head of Ford
+ Update 16. Car Seat Covers xix) Covers still not complete and new deadline of 31 Oct
EFTA00577796
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
given.
+ NC 17. Puppies xx) Puppies in Ohio until 18 Nov for house training.
+ NC 18. Parrot at Entrance xxi) On hold — woodshop concentrating on new gym & heli
hut.
+ Update 19. Shotgun xxii) Application submitted - expected 10 Nov.
+ Update 20. Mosquitoes / Sandflies xxiii) Dan Ariaz will be traveling to LSJ 15th — 18'h Oct — will
submit proposal post visit.
+ Please advise 21. Dock xxiv) Old dock has been demolished & work has started on
setting out new dock.
xxv) Decking material with Florida suppliers — expected 23
Oct
xxvi) Fenders — Miles supplied manufacturer with specs per
plans.
xxvii) Quote - "Fend Off Fenders" has submitted quote for 540
linear feet (stock in hand) with exception of fender
corners (out of stock) but should not take too long to
make up. Have white & black colour not UV protected
and the black leaves marks. Grey is UV protected and
mark free which is advised colour. Arrives pre-drilled
with stainless steel fittings. Approx Cost = $14,500.00.
JE to plse confirm if in order. In two wks company
attending at Fort Lauderdale boat show and stock in
hand may be sold out.
EFTA00577797
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
+ Update 22. Boat xxvii) 48 Foot high speed catamaran that Larry dealing with has
been sold.
+ Update 23. Helicopter Shelter xxviii) Stoning work continues, interior tiling complete.
Construction of roof commenced — pictures attached.
+ Update 24. New House Building Site xxix) Architects have visited the site & will put proposal
forward for permitting etc — no date.
+ NC 25. Cart Paths reduce grades xxx) Project to start once earthmoving machinery on island -
dependent on permits.
+ NC 26. Poolhouse xxxi) Construction to commence in new year
+ Update 27. Plant Planters xxxii) Supplier in Puerto Rico has pots = 42 inches high. Miles
requested sample for JE approval — expected 25 Oct.
+ Update & 28. Master Bedroom Urinal xxxiii) Removed - wall & plumbing made good.
Complete
+ NC 29. Main House Maintenance xxxiv) Ongoing — one carpenter assigned all MH tasks.
+ Please advise 30. Stuart Fallbright xxxv) 50% complete — continuing work. No completion date.
xxxvi) New plants from Florida — 50% been planted. No
completion date.
xxxvii) JE sd Stuart can stay as long as he likes _ He will stay
Until
EFTA00577798
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
+ Please advise 32.New Gym xxxviii) Slab poured, block work commenced — see pictures
attached.
xxxix) Special order for doors / windows in hand — expected
delivery 1 Nov.
xl) Electrical upgrade = $7,500.00 — "A**"
AC Unit & Installation = $11,295.00 — "B"
Quotes attached — JE to please confirm if in order.
xli) Miles received new roof line and permit updates from
Kevin today (11/10) but has not had time to review them.
+ Update 33. Main House Outside Lights xlii) Diagrams & pictures supplied to GM who has progressed
to requesting Miles come up with fastened cover to prevent
water from entering receptacle, copy also given to Richard.
* Update 34. Steam Room xliii) Stand alone electric generator = $12,000.00
Upgrade LSJ power sources & run new cables =
$110,000.00 — attached quote "C"
xliv) 1/10 — Miles submitted website for pre-fabricated unit to
JE.
Website: steamandsauna.com NS spoke with Charles &
Charles will come up with suggestions.
> Update 35. Items to Purchase xlv) First Aid/Ambulance — expected delivery 18 Oct
xlvi) Gardening Equipment — arrived at LSJ 11 Oct
EFTA00577799
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
+ Update & 36. MBR Curtain Rod xlvii) 7 ft curtain rod installed 10 ft from floor on inner wall.
Complete
+ Please advise 37. Replace AC Units in Guest xlviii) Quotes to replace all guest AC units (3) = $6,585.00 — see
Rooms attached "D" - JE to please confirm if in order
+ Update 38. Irrigation xlix) Report received — sent to Charles & forwarded to Madison
Cox, copied to JE & NS. Quoted = $930,000.00
+ Update 40. Pond Clear / Algae Eater 1) Company Miles was dealing with has gone bankrupt —
investigating alternate company. ES sent Miles alternative
& Miles will contact. NS also contacted Alan Stopec for his
advice.
+ Update 41. Dock Light li) Ed Tuttle was not consulted on dock light and Charles has
now sent memo to Tuttle requesting manufacturer details.
+ NC 42. Permits Iii) No progress to report — ongoing.
+ Update 43. New Development liii) Generator for new building — Paul Gandy sourcing correct
generators.
liv) Paul Gandy drawing up bubble diagram of site utilities &
building - submitting to Ed Tuttle to design.
Iv) 11/10 - Letter of credit sent and received by Pirelli.
lvi) Cable ready for factory testing betw. 30 Oct and 8 Nov. NS
will speak to Charles re having somebody attend the
EFTA00577800
FORTNIGHTLY REPORT
FRIDAY 11 OCTOBER
STATUS ITEM COMMENT
testing.
lvii) Conference call held 7 Oct betw. Darren, Paul Gandy &
others w.r.t. conflicting information — Paul Gandy was
supposed to have memo sent to Darren w.r.t what was
excluded and what needs to be included in the cable
installation proposal. Due to be received by Darren today
(11/10) and on second conference call today 11/10 betw
NS, Darren & Paul Gandy, Paul advised he had
misunderstood and assured us that he would send the memo
to Darren on Monday 14 Oct.
********************
EFTA00577801
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 83fa0d8f-e185-488b-956a-88f3bd725a46
- Storage Key
- dataset_9/EFTA00577780.pdf
- Content Hash
- 094d45de133bd28ee8082e2b659ffdc8
- Created
- Feb 3, 2026