EFTA01124387.pdf
dataset_9 pdf 1.0 MB • Feb 3, 2026 • 10 pages
PROPOSAL
Date 1 12/4/2010
)))
S 0 IL; N O›C
I he LA lima to in Home and Marine Entertainment
TERMS AND CONDITIONS
1)80% DEPOSIT UPON SIGNING
360 WEST NORTHWEST HIGHWAY 2) 20% PAYMENT UPON 100%
BARRINGTON, ILLINOIS 60010 COMPLETION OF THE JOB
847-382-3911 OFFICE
847-382-3917 FAX 31LABOR WILL BE BILLED DAILY
AT 3800. PER TEC HNITIAN
NAME Jeffrey Epstein 4) Freight is not included
Address all Fright will be Invoiced to end
City/St user at ow con
Phone #
EMAIL
OTYI PRI BRAND I PART # I DESCRIPTION PRICE I TOTAL
Project Summary
Equipment Total $155,481.00 This Is Including 2D projector Option
Labor $22,400.00 This is LSJ and NYC
( $800 per day per Tech )
Estimated Travel $3,360.80 This Is 2 round Trip tickets to NYC
and 4 Round Trips to LSJ
Project Total $181,241.80
Housing for LSJ will be at Emads
Housing for NYC will be at 301
All Freight wil be provided via Emad.
Equipment Labor Total
LSJ Theater 580,700.00 53200.00 $83900.00
LSJ Master 59.865.00 $3200.00 $13065.00
LSJ Gym $13.307.00 $3200.00 $16507.00
LSJ Tiki $13,217.00 $3200.00 $16417.00
LSJ Pool $18.042.00 $320000 $21242.00
71st 6th Floor $20,350.00 $6400.00 $26750.00
Total $22.40000 $177881.00
PAGE 1
If approved please fax back each page:
EFTA01124387
PROPOSAL
Date I 12/4/2010
TERMS AND CONDITIONS
S C3 t—; I \AI C) ›C
The Ultimate in Horne and Marine Entertainment
). 1)00% DEPOSIT UPON SIGNING
2) 20% PAYMENT UPON 100%
360 WEST NORTHWEST HIGHWAY
COMPLETION OF THE JOB
BARRINGTON, ILLINOIS 60010
847-382-3911 OFFICE
3) LABOR WILL BE BILLED DAILY
847.382-3917 FM
AT MOO. PER TECHNITIAN
4) Freight Is not included
NAME Jeffrey Epstein
all FitegM will be Invoiced 14 end
Address
user at our cost
CitylSt
Phone #
EMAIL TOTAL
QTY PR! BRAND I PART # 1 DESCRIPTION _ PRICE I
Pool System,
300 PI Outdoor Speakers $900.00 $3,240.00
4 ea EN
122PI Dual 12' Subwoofer enclosure 5700.00 $2,520.00
4 ea EN
1212 1200w X 2 Amplifier $1,600.00 $4,320.00
3 ea EN
DX46 Equalizer $1,350.00
1 ea EN
Apple AppleTV Apple TV $107.00
I ea
Ipad Ipad $535.00
1 ea Apple
Almon Extreme Viceless switch 5180.00
1 ea Apple
Interconects XLR Eq. $350.00
1 ea RDL
500' spool 12 gauge 4 conductor $400.00 $3,200.00
8 ea 1Nindy City
ProPower 3600 Power Conditioner S58500
1 ea Monster
SM-Rack-12u Electronic Rack Enclosure $405.00
1 ea Snap Av
D/A Analog Audio $450.00
1 ea Petra
Program Macl Program $800.00
1 ea Crestron
Sound X Labor 2 Technitions 51.600 00 53.200.00
2 ea
" please note that it will take 4 weeks
from the date of ordering to obtain
the EN Speakers they are made to order
Total $21242.03
PAGE 2
If approved please lax back each page:
EFTA01124388
PROPOSAL
Date I 12/4/2010
TERMS AND CONDITIONS
S 0 til NIX
I ho Ultimate in Home and Marine Entertainment
)00) I) 00% DEPOSIT UPON SIGNING
2)20% PAYMENT UPON 100%
360 WEST NORTHWEST HIGHWAY
COMPLETION OF THE JOB
BARRINGTON, ILLINOIS 60010
847.382.3911 OFFICE
3) LABOR WILL BE BILLED DAILY
847.382-3917 FAX
AT $800. PER TECHNITIAN
41Freight is not included
NAME Jeffrey Epstein
all Filedm will be Invoiced to end
Address
user Moor cost.
City/St
Phone N
EMAIL
I PART N I DESCRIPTION PRICE I TOTAL
DTIPRI BRAND
TIM HUT
ZX1i Outdoor Speakers $450.00 $1,620.00
4 ea EN
122PI Dual 12- Subwoofer enclosure $700.00 $1,260.00
2 ea EN
EN 1212 1200w X 2 Amplifier $1,600.00 $Z 880O0
2 ea
DX46 Equalizer 31,350.00
1 ea EN
Apple TV $107O0
1 ea Apple APPISTV
Ipad !pad $535.00
1 ea Apple
Appe Airport Extreme wireless switch $180.00
1 ea
Interconects XLR Ed. $350.00
1 ea RDL
DIA Analog Audio S500.00
1 ea Petra
5007 spool 12 gauge 4 conductor S800.00
1 ea windy City
ProPower 3600 Power Conditioner $585.00
1 ea Monster
Custom Sealed Rack Enclosure $2.250.00
1 ea Entegra
Program Ipad Program $800.00
1 ea Crestron
Labor 2 Tedmitions $1,600.00 $3.200.00
2 ea Sound X
* please note that it will take 4 weeks
from the date of ordering to obtain
the EN Speakers they are made to order
Total $16,417.00
PAGE 3
If approved please fax back each page:
EFTA01124389
PROPOSAL
Date 1 12/4/2010
S 0 t. i NI I:, )C
9)
The ultimate in Home and Marine Entertainment
TERMS AND CONDITIONS
1)e0% DEPOSIT UPON SIGNING
360 WEST NORTHWEST HIGHWAY 2) 20% PAYMENT UPON 100%
BARRINGTON, ILLINOIS 60010 COMPLETION OF THE JOB
847.382.3911 OFFICE
847-382-3917 FAX 3) LABOR WILL BE BILLED DAILY
AT $400. PER TECHNITIAN
NAME Jeffrey Epstein 4) Freight is not included
all 'Magill will b Invoiced lo oiid
Address
our at our cost
City/St
Phone 0
EMAIL
BRAND I PART a I_ DESCRIPTION PRICE I TOTAL
OTYrPRI
LSJ GYM
EN CP4000S 2x1400 watt amplifier $2.300.00 $4,140.00
2 ea
EN 1212 1200w X 2 Amplifier $1,600.00 $2,880.00
2 ea
Sunfire Preamp 401 Preamp w HDMI Switching Palm Beach House
1 ea
EN DX46 Equalizer $1,350.00
1 ea
CP2E Processor $1.710.00
1 ea Crestron
1 ea Apple AppleTV Apple TV $107.00
Ipad Ipad $535.00
1 ea Apple
Airport Extreme VOnsless switch $180.00
1 ea Apple
Interconects XLR Ect. S350.00
1 ea RDL
Apple Crestron Application $100.00
1 ea
Crestron Program Ipad Program $800.00
1 ea
SCHOMI HOW Baulin $655.00
1 ea Vanco
Rack Shelves $75.00 $300.00
4 ea Snap AN
Labor 2 Technitrons $1.600.00 $3,200.00
2 ea Sound X
Total $16,507.00
PAGE 4
If approved please fax back each page:
EFTA01124390
PROPOSAL
Date 1 12/4(2010
TERMS AND CONDITIONS
S 0 U INJI E, ›C ' a) 9 sox DEPOSIT UPON SIGNING
The Ultimate in Horne and Marine Entertainment
360 WEST NORTHWEST HIGHWAY 2)20% PAYMENT UPON 100%
BARRINGTON, ILLINOIS 60010 COMPLETION OF THE JOB
847-382-3911 OFFICE
847-382-3917 FAX 3) LABOR WILL BE BALED DAILY
AT WOO. PER TECNNMAN
NAME Jeffrey Epstein 4) Freight is not included
Address allitileght will b• invoiced %a end
CitylSt user at our cost.
Phone #
EMAIL
OTYIPRI BRAND I PART # j DESCRIPTION PRICE 1 TOTAL
6th Floor NYC
1 ea Sony Qualia From LSJ From LSJ Theater
Peerless URG300 Projector mount $315.00
1 ea
2 ea Sunfire TSEI2 Dual 12" 2700watt Subwoofer $2.300.00 44.140.00
Sunfire Preamp 401 Preamp w HDMI Switching 33.150.00
1 ea
Sunfire Amp 7401 5 Channel 400 watt per channel $4.250.00 $7.660.00
2 ea
Denon BD Blu-Ray Player $630.00
1 ea
1 ea Apple AppleTV Apple TV $107.00
Apple Iped lOad 5535.00
1 ea
1 ea Apple Mac Mini Main Hard Olive 2.4 0112 320 gig $748.00
Apple Crestron Appication $100.00
1 ea
Airport Extreme Wireless switch $180.00
1 ea Apple
Audio Control Bijou Speaker Equalizer $945.00
1 ea
Program New Remote Control Program 41.500.00
1 ea Crestron
Monster Interconnect Package HDMI - Digital Audio $350.00
1 C8
Sound X Labor 2 TechnIthons $1.600.00 $6.400.00
4 ea
* Might need a New Lens for
Qualla projector
We will be utilizing the existing Screen
Total $26.750.00
PAGE 5
If approved please fax back each page:
EFTA01124391
PROPOSAL
Date I 1214/2010
S 0 UP IV0,C.
I hi. llitirnatc• in Horne and Marini. intertainMent
.2.)) TERMS AND CONDITIONS
1) SO% DEPOSIT UPON SIGNING
360 WEST NORTHWEST HIGHWAY 2)20% PAYMENT UPON 100%
BARRINGTON. ILLINOIS 60010 COMPLETION OF THE JOB
847-382-3911 OFFICE
847-382-3917 FAX 3) LABOR WILL BE BILLED DAILY
AT MO. PER TECHNITIAN
NAME Jeffrey Epstein 4) Fivig at is not Included
Address all FrlegIn will be invoiced to end
City/St user at out cont.
Phone P
EMAIL
owlPRI BRAND I PART # I DESCRIPTION PRICE I TOTAL
Master Bedroom LSJ
1 ea Samsung UN6500 er LED LCD TV $3,690.00
1 ea Peerless FLWG Flat Wall Mount 5315.00
1 ea Sunfire TG3 Preamp From LSJ Theater
2 ea Sunfire Cinema Grand 5 Channel Amplifier From LSJ Theater
1 ea Crestron CP2E Processor $1,710.00
1 ea Apple AppleTV Apple TV $107.00
1 ea Apple Ipad lead $535.00
1 ea Apple Mac Mini Main Hard Drive 2 4 GHz 320 gig $748.00
1 ea Apple Crestron Application $100.00
1 ea Apple Airport Extreme Wireless switch $180.00
1 ea Audio Control Bijou Speaker Equalizer 5945 00
3 ea B8W Speakers Palm Beach Master
5 ea Etherial 2m HDMI Cable 555.00 S27500
1 ea Etherial 4m HDMI Cable $110.00
I as Crestron Program Ipad Program $800.00
1 ea Etherial Misc Small Parts $350.00
I ea Monster ProPower 3600 Power Conditioner Palm Beach Master
2 ea Klipsch Subwoofers Palm Beach Master
2 ea Sound X Labor 2 Technilions $1,600.00 $3,200.00
Total $13O65.00
PAGE 6
If approved please fax back each page:
EFTA01124392
PROPOSAL
Date I 12/4/2010
S C) Li/ NI C) ›C ))10
The Ultimate in Home and Marine Entertainment
TERMS AND CONDITIONS
I) 50% DEPOSIT UPON SIGNING
360 WEST NORTHWEST HIGHWAY 2) 40% PAYMENT UPON DELIVERY
BARRINGTON. ILLINOIS 60010 OF ALL EQUIPMENT TO JOB SITE.
847-382-3911 OFFICE
847.382-3917 FAX 3)10% PAYMENT UPON 100%
COMPLETION OF THE JOB
NAME Jeffrey Epstein 4) LABOR WILL BE BILLED WEEKLY
Address AT TIME AND MATERIAL
City/St
Phone 0 5) SEE ATTACHED TERMS AND
EMAIL CONDITIONS FOR FURTHER INFO.
I I I I I
LSJ Theater
1 ea Digital Projection Titan Reference' 20 Projector $58.500.00
1 ea Digital Projection Titan Reference' Enclosure for Noise 54.050.00
1 ea Sunray Preamp 401 Preamp w HOMI Switching 53.150.00
2 ea Sunlit, Amp 7401 7 Channel 400 watt per channel $4.250.00 $7,650.00
1 ea Crestron CF'2E Processor $1,710.00
1 ea Apple AppleTV Apple TV S107.00
1 ea Apple Ipad lead 5535.00
1 ea Apple Mac Mini Main Hard Drive 2.4 GMT 320 gig 5748.00
I ea Apple Crestron Application $100.00
1 ea Apple Airport Extreme lAireless switch 5180.00
1 ea Audio Control Bijou Speaker Equalizer S945.00
5 ea Etherial 2m HDMI Cable $55.00 5275.00
1 ea Etherial 4m HDMI Cable 5110.00
10 ea RDL 2m XLR Cables 532.00 $320.00
1 ea Crestron Program Ipad Program $800.00
1 ea Etherial Misc Small Parts S350.00
4 ea Klipsch Replacement Tweeters $325.00 51.170.00
2 ea Sound X Labor 2 Technitions $1,600.00 $3.200.00
Room Total S83.900.00
PAGE 7
If approved please fax back each page: I 1
EFTA01124393
Rich Kahn
From: Emad Hanna
Sent: Friday, December 10.2010 8:28 AM
To: Rich Kahn
Subject: FW:Per JE's request
Attachments: JE LSJ REVS 12-8-2010.pdf
Sorry Rich I thought I sent It to you already
Thank you
Emad Hanna
Project Controller
MOW Associates
301 East 66th St
Suite 1OF
New York NY 10065
Cell
LS] Of ice
St. Thomas 0 ice
NY Office
Fax 646 350-0221
From: [Mgia
Sent: Monday, December 06, 2010 11:29 AM
To: Emad Hanna
Subject: Fw: Per Es request
Fyi
Sent via BlackBerry by AT&T
From: nick lambros
Date: Mon 6 Dec 2010 10:27:04 -0600
To:
Subject: Re: Per JE's request
Here is new quote without PMC
He sent me a email this morrning that was cc'd to Rich for a 50% deposit of 90k thats not going to be enough
need 75-80 at least now that we gave 10% discount
You know getting remained doesn't always go so quick and i can't afford to front it.
How do I proceed.
Also still think he is making big mistake removing speakers and not going 3D 'ill III just for the record
1
EFTA01124394
On Sun, Dec 5, 2010 at 1:27 PM, Nick Lambros a wrote:
Ok
Sent from my iPhone
On Dec 5, 2010, at 12:31 PM wrote:
If its not to much trouble, I think you should remove from quote and just re send to me so we are
all on same page tomorrow,.
This way Rich Kahn can have some paper work back up for getting you a lot of cash for ordering
equipment,.
Thx
Sent via BlackBerry by AT&T
From: Nick Lambros -te
Date: Sat. 4 Dec 2010 1 :11:03 -0600
To:
Subject: Re: Per JE's request
What ever I don't need to redo quite do I ? Just remove•from quote on my end right?
Sent from my iPhone
On Dec 4, 2010, at 5:57 PM, wrote.
1 Sounds like he'll keep what currently there, l think
Sent via BlackBerry by AT&T
From: nick lambros
Date• 4 Dec 2010 17:35:16 -0600
To:
Subject: e: w: er JE's request
What Speakers does he want to use? In the Gth floor then?
On Sat, Dec 4, 2010 at 4:24 PM, a wrote:
Sent via BlackBerry by AT&T
From: Jeevacation <ieevacationciiumail.com>
Date: Sat, 4 Dec 2010 17:22:16 -0500
To: Lvjet
Subject: Re:
ae r JEquest
EFTA01124395
No pmc speakers
Sorry for all the typos .Sent from my iPhone
On Dec 4, 2010, at 4:49 PM, Lvjet a wrote:
From Nick:
---Original Message---
From: nick lambros
To:
Sent Sat, Dec 4, 2010 4:14 pm
Subject: Per JE's request
Larry Just to make the deal happen I agreed to take 10% off all
electronics. Excluding Apple which there is no mark up on and small
parts.
New total $209,186.80 thats a $18,040.00 discount.
Let me know.
Nick Lambros
Sound X
360 w. Northwest Highway
Office 847-382-3911
clE_LSJ REV7 12-4-2010.pdf>
ayanniyzlik:cr
360 w. Northwest Highway .
7,-,;- :sw582-apq :"7.TP est • • tarr5-1•30 r w-
rA irr ia
Nick Lambros -
Sound X ••• • .
366 w. Northikest Highway
Office 847-382-3911 l' J .3' 1 L'F.: X i3 .
• 7t.; t5v.i7 "; Ce,
t-
•i)t u, re/ •-•145
3
EFTA01124396
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 6ed40b59-7ab6-418d-8329-afd8a707037c
- Storage Key
- dataset_9/EFTA01124387.pdf
- Content Hash
- 55d8cab22be79fcf935218d5188fa1eb
- Created
- Feb 3, 2026