2119/12 Atlanta Refrigeration Service Quote
ARS Export Supply
V .R
\
\.)
"TY
, Formerly Atlanta Refrigeration Service VI
7350 Estate Bovont, Suite 121C, St. Thomas USV1 00802
Tel: 340.775.9222 Fax:340.775.9122 QUOTE
Jab Location Quote Information
Little Saint James Data: Jul 30, 2012
Little Saint James ARS Quote ION: 9828862
St. Thomas, VI 00802 Submitted By: Kent Magee Original AMIna:
Tel.: 340- 775-2525 Fax: .
Submitted To: Brice Gordon Origlne Cell Date: 6/15/2012
We Submit Specific and Estimations for the Listed Below:
IIEquipment Chiller todelEk
'Manufacturer: Carder Halt
Description of Work Required:
The following is a quote for the chiller In the library. We are proposing to return to site and remove the old chiller system. We
will install the new airtiandler, chiller, reheat system, controls and dampers. The Controls installed will what was provide by
EMS. The chiller will have a E-Coating on the condenser coil to resist corrosion. We will also provide a spare chiller to keep
on site in case a replacement is needed. The new system will control the humidity of the library and control temperature
properly. Shipping is included to St thomas. Barge must be provided for equipment to get out to LSJ. The use of the on site
lull must be provided also for unloading container and getting equipment into place and removing the old equipment. Thank
. you for choosing ARS Export Supplyl
Pal foriess
r.:...i ptitn Otv IVA
Canter Complete Chiller System 1.0 $48,501.20
Spare Carrier Chiller 1.0 $26,550.00
D0C Controller. Controls and installation 1.0 $29,348.00
Duct work, Dampers, Materials 1.0 *845.00
MI Piping, Vales, Hardware 1.0 $3,660.00
:that
Installation Labor 1.0 $14,500.00
. Important Notes: Total Materials: $110,924.20
i Lead time is 10-12 weeks depending on Manufacture lead time on equipment. Once Total E.P.A.
I approved 50% is due before any equipment will be ordered. Once equipment antes, Total Misc./Welding:
25% will be due before installation work can begin. Once project is complete and
I ;tinning anal 25% will be due. Total Labor: $14,500.00
Initial Call:
Shipping/Freight: $4,500.00
Warranty Information: Subtotal: $129,924.20
i Manufacturer parts warranty and 30 day labor warranty on work performed Tax:
Total: $129,924.20
FAX SACK SIGNED TO 340-775-9122
.
Aumenidradon
CNN Authorization: ARSAcceptance:
emeeillog.00mIdokluoteViewndit9828862 112
EFTA00612232
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 6b89a32c-8e18-417d-a798-b699cf7c3dfc
- Storage Key
- dataset_9/EFTA00612232.pdf
- Content Hash
- ddac4a0bc8f656c953c54fb979aeca9f
- Created
- Feb 3, 2026