EFTA00745359.pdf
dataset_9 pdf 39.0 KB • Feb 3, 2026 • 1 pages
From: "Dr. Henry Jarecki"
To: 'Jeffrey Epstein' <jeevacation@gmail.com>
Subject: FW: airframe inspection update
Date: Tue, 29 Jun 2010 03:54:33 +0000
Attachments: tailjpg; 2c_2.jpg; 2c_inspection.jpg; co_pilotjpg; fan_corrosion.jpg; galleyjpg; IMG00073-
20100623-1329jpg; parts.jpg; s_duct.jpg
From: Gary Talucci [mailto:
Sent: Monday, June 28, 10 22:38
To: Dr. Henry Jarecki; Robert Reeves; Tony Detre
Cc: Gary Talucci
Subject: airframe inspection update
The "C" airframe inspection is primarily a corrosion inspection, consequentially Standard Aero has found some corrosion. I
met with the Dassault engineers to evaluate a never-seen corrosion area in the aileron bell-crank box, this is in a difficult to
repair location that may cause delays.. Dassault is working on a repair procedure. There is also some corrosion on the first
bulkhead that is also needing Dassault's evaluation for a repair procedure.
The landing gear overhaul is coming in slightly under budget at about $225k. However, the landing gear trunnion bearing had
to be bored out by Falcon to repair a seized bearing, and is now ready for reassemble.
I have enclosed some pictures on the scope of the inspection.
EFTA00745359
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 667ee436-5ee7-49c2-a677-ea99aa4c9f05
- Storage Key
- dataset_9/EFTA00745359.pdf
- Content Hash
- d170de8e17bc6669bc34ab8ce889474c
- Created
- Feb 3, 2026