From: Stephen Caplinger
To: Jeffrey Epstein <jeevacation@gmail.com>
Cc: Gary Kerney >,
Subject: Fwd: LSJ
Date: Sat, 26 Dec 2009 15:31:01 +0000
Forwarded message
From: Stephen Caplinger <
Date: Sat, Dec 26, 2009 at 8:45 AM
Subject: LSJ
Jeffrey:
It greatly concerns me that you are disappointed so I wanted to address your concerns. In regard to the Office
Pavilion entry landscaaping, We proceeded to construction only because we felt that we had you approval. I felt
that we had your approval and go ahead after we submitted the final design plans which were based on several
preliminary concept plan submittals. You even made the comment that we don't need to show you the plans
again and we should consider it approved for construction.
I want to assure you that I would never proceed to construction on anything without first having your approval.
On the Kite House, I know you like to see photo overlay sketches, but all we've done is conceptual floor plans &
site plans. As soon as I can I'll prepare additional photo sketches for your review on the exterior views &
orientation.
Going forward, I want to make absolutely sure that you are happy with what we are doing and that you feel that
we've given you enough design information to make decisions.
I would hope that we we will be able to walk through with you the various designs when we are together with
Gary on LSJ. I believe that we can better communicate in person and on site.
In the future, I will strive to give you better design concepts that are on photo overlays and to send hard copiesin
addition to email attachements. I plan on being back on LSJ during the week of 1/4/10 - 1/8/10 so we should
definitely get together to walk through all of the landscape issues so that I am totally clear on your vision. I don't
have any doubt that we can produce your vision on the island, I just feel we have a communication issue.
Meanwhile, I am working on the Coastal Zone Management application package for the Kite House Pool, Wood
Deck, Fire Pit, ATV Garage and the Tennis Court. We also plan on discussing the Boat Dock House but this is
more of a Corps of Engineers issue. All of the designs in the CZM submittal can be revised later.
Please call me if you have any comments or questions and I look forward to seeing you.
Ste hen M. Ca linger
Ste Then M. Caplinger
EFTA00766539
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 61569803-4c90-448d-9c2a-c6f627bcc649
- Storage Key
- dataset_9/EFTA00766539.pdf
- Content Hash
- c1da0a66a4e338856f748c3afab31d65
- Created
- Feb 3, 2026