EFTA01008195.pdf
dataset_9 pdf 102.5 KB • Feb 3, 2026 • 2 pages
From: Kyle reavis
To: "jeffrey E." <jeevacation@gmail.com>
Subject: Re:
Date: Thu, 16 Aug 2018 12:53:47 +0000
Attachments: Concrete_Calculation_-2.PNG
Mr Epstein,
Please see attached calculations. 79 yards.
Very Respectfully,
Kyle Reavis
On Thu, Aug 16, 2018 at 5:48 AM, jeffrey E. leevacation@gmail.com> wrote:
last on our priorty list
On Thu, Aug 16, 2018 at 8:29 AM, Kyle reavis < wrote:
Mr Epstein,
Helicopter Pad will be 97 Yards (100' x 4"). That would be on a level grade and we can get back-fill from
GSJ and compact ourselves. I think we should look into pour breaks to prevent EB from getting
overwhelmed trying to pour 100 yards in one day. If their are any issues with Barges on pour-day we will
have non-structural pour breaks that will result in major cracking. Maybe do (3) 34 yard pours on separate
days. To join the separate sections you just need 2' pieces of #4 rebar core drilled and epoxied into the
joints. That will produce a clean structural joint.
Very Respectfully,
Kyle Reavis
On Thu, Aug 16, 2018 at 5:14 AM, jeffrey E. <jeevacation@gmail.com> wrote:
kyle please detail for me your concrete calculation for heli area thx. , I want the sundial completed by
tues, . jules should be wrking pebble beach rip rap. . , as i wil be with new archtects on the eve of 25th
dock pour MUST be done by them. .I want a delivery date on the rebuiilt generator parts , having no
backup is a problem.. lets look at adding a brand new 150k generator as the 2 big ones are oversized.
I want a schedule of the bathroom complettions. for the cabanas. thx.
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
EFTA01008195
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jea®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01008196
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 5a20a2cf-064f-42e6-ad05-82707a22e93d
- Storage Key
- dataset_9/EFTA01008195.pdf
- Content Hash
- 7424f8b3c6c1b0f1ed53b347d3b07940
- Created
- Feb 3, 2026