Epstein Files

EFTA00794207.pdf

dataset_9 pdf 642.2 KB Feb 3, 2026 7 pages
Great St. James Maintenance Building Architectural Programming GREAT ST. JAMES MAINTENANCE BUILDING ARCHITECTURAL PROGRAMMING FEBRUARY 15, 2019 (updated 2/23/19) GREAT ST. JAMES, U.S. VIRGIN ISLANDS Prepared by: Boschulte Architecture, LLC EFTA00794207 Great St. James Maintenance Building Architectural Programming GREAT ST. JAMES MAINTENANCE BUILDING ARCHITECTURAL PROGRAMMING INTRODUCTION The purpose of this document is to identify the scope of work to be designed in terms of functional and operational requirements and to gain a consensus of how the building and its systems will work once the building is occupied. The intent is to provide information to make decisions regarding current and projected space needs for implementation in order to guide the building design and to inform design consultants, vendors, and potential builders/contractors of the general vision for the completed facility. GENERAL INFORMATION Project Name: GSJ Maintenance Building Project Address: Parcel No. B21-1 & B-2-2, Great St. James, Island No. 6A Red Hook Quarter, St. Thomas, U.S. Virgin Islands Owner: Great St. James/Little St. James, 6100 Red Hook Quarter B-3, St. Thomas, USVI 00802 Architect: Boschulte Architecture, LLC, 41-42 Kongens Gade, St. Thomas, VI 00802 PROJECT TYPE The project type is a maintenance/engineering building. The types of spaces to be included are identified in this document along with space criteria for those spaces. GOALS AND OBJECTIVES The function of the building is to be the headquarters of the management, operations, and maintenance services needs for Little St. James (LSJ) and Great St. James (Gal). These functions are currently housed in one or more structures located on Little St. James and the owner desires to relocate them to a consolidated facility on Great St. James. The building will house the day-to-day activities necessary for operation and maintenance staff to perform their basic duties in a safe, functional facility. SITE REQUIREMENTS The project site has been previously identified by the owner to be Parcel No. B-2-1 and B-2-2, Great St. James, Island (D9-7345-T004). The site will be located on the north-west area of Great St. James near the knoll directly north of Christmas Cove bay. This provides location provides easy access from the existing barge landing at Christmas Cove and is located away from the residential functions of the 2 EFTA00794208 Great St. James Maintenance Building Architectural Programming island. The building should be sited to minimize lines of sight and to minimize acoustical impact from the functions performed between the facility and the residential areas of GSJ and LSJ. Visual impact(s) from the surrounding waters of GSJ is largely un-avoidable due to the anticipated size of the facility, however aesthetics in this regard is recognized as an important consideration well. Existing project improvements include dirt roadways, and large (relatively flat) open dirt area which is the anticipated location of the facility. The perimeter of the open dirt area does have some earth fill/disturbed soil which may affect structural foundation choices. The project site is zoned R-1, Residential. Brian Moseley & Associates, Inc. DWG No.: 4790-8 COVENANTS, EASEMENTS, ETC. Survey map delineates an easement "Ba" (D9-7345-T004) between Parcel No. B-2-1 and B-2-2. Design should consider impact to this easement as it provides access to adjacent parcels C-2-1, C-2-2, and C- 2-Remainder. Encroaching on this easement will hamper future access/development of those parcels. Design should take this into account or propose alternative access easements for these parcels. 3 EFTA00794209 Great St. James Maintenance Building Architectural Programming USE OF ADJACENT PROPERTIES Use of adjacent properties is residential (largely undeveloped). OWNERS OF ADJACENT PROPERTIES All adjacent properties on GSJ island are under the owned by the project owner. PUBLIC SERVICES The public utilities are not available at the project site due to the site location being GSJ which is an island off the south eastern coast line of St. Thomas, VI. Current and future vision for services is that GSJ is to be a self-sustaining island. Possible future connection to LSJ for electrical grid connection is being considered but will be unavailable when the project is constructed and during initial occupancy. • Gas: If propane fuel is necessitated by the building's equipment or appliances these will be stored in propane tanks to be refueled by propane vendor's trucks barged to the island. • Electric: No WAPA service is currently available on island. Building to tie into planned underground electric service from the existing GSJ diesel generator. Provisions to be made for future tie-in to anticipated undersea grid connection to LSJ electric grid. Design consideration to be given to roof-top solar panels installation for sustainable solar power production for the building. • Communications and data: Phone and Internet service provider (ISP) to be determined by owner. Space to be identified within the building for ISP hub/WIFI/Server etc. • Sewer: No public sewer is available on site. Building to utilize a packaged on-site sewage waste disposal system. • Water: Primary water source will be from a packaged reverse osmosis plant (R.O.) which is planned for GSJ. Intent is to connect to R.O. plant via tie-in underground water main (under development). Consideration to be given to below ground or above ground water cistern of site-cast concrete construction with roof top rainwater collection as secondary source of water supply. Pre-manufactured water tank(s) are another consideration for secondary water supply. Cistern or tanks may be necessitated due to fire suppression/sprinkler requirements for the building. FUNCTIONS The facility is anticipated to house the following functions with square footages table below: • Enclosed Maintenance Work Area ("wreck shop") • Painting — storage, painting booth • Electric Shop • Wood Shop • Grounds Maintenance / Landscaping 4 EFTA00794210 Great St. James Maintenance Building Architectural Programming • Captain's Area • Laundry Room • Staff Break Room • Male and Female Restrooms • Pantry / General Storage ("Cost U Less") • Boat Trailer Storage • Office Space / File Storage • Mechanical Room • Electrical Room • Circulation (corridors/hallways) • Power Washing Station (exterior) • Fuel station (exterior) GSJ MAINTENANCE BUILDING SPACE REQUIREMENTS Existing Space No. of People Space Sub• No. of Square Feet ID No. Space/Activity Spare Notes GI" or Items Total Spaces Required 1.00 header Spaces 1.10 Maintenance Work Area 1,100 5 5,500 1 5,500 1.20 Panting 400 1 400 1 400 1.30 Electric Shop 400 1 400 1 400 1.40 Wood Shop 640 1 640 1 640 1.50 Grounds Mantenance/Landscaping 800 1 800 1 800 L60 CaptainisArea SO 6 300 1 300 1.70 laundry Room 320 1 320 1 320 L80 Staff Break Room 30 25 750 1 750 1.80 Male Restroom 100 3 300 1 300 L90 Female Restroom 100 3 300 1 300 1.10 Pantry/General Storage 800 1 800 1 800 1.11 Boat Traler Storage 200 5 1.000 1 1.000 1.12 CffIce Space /File Storage 350 1 350 1 350 1.13 Mechanical Room 480 1 480 1 480 1.14 Electrical Room 250 1 250 1 250 SUBTOTAL NET ASSIGNED SQUARE FOOTAGE 12,690 CIROJLATIONAND WALLS (@ 20%) 2,518 TOTAL GROSS SQUARE FOOTAGE 15,108 2.00 Beerier Spaces 2.10 Power Washing St aion (exterior) 320 1 320 1 320 2.20 Fuel Station (exterior) 480 1 480 1 480 230 Work Vehicle Perking 200 1 200 10 2.000 TOTAL AREA REQUIRED 2,800 revised 02/23/7019 EFTA00794211 Great St. James Maintenance Building Architectural Programming CONSTRUCTION The facility is anticipated to be constructed of a pre-engineered steel structure with metal panel siding for the building envelope. Some portions of the building envelope may be constructed of concrete block (CMU) walls for added durability. Foundation to be concrete slab foundation with concrete footings at the locations of the steel structure columns. Steel structure to be designed by steel building manufacturer per wind speed and seismic requirements of the project location (provided by the structural engineer consultant adhering to International Building Code — IBC). The building manufacturer to provide certified loading reactions to the structural engineer in order to design the foundation. Roof to be of metal panel construction with rain water gutters at perimeters and gutters to rain water collection cistern/tanks or to grade. Interior spans to be kept as open as possible for interior layout flexibility and future space planning changes if needed. Interior partitions to be of metal stud and gypsum wall board or concrete blocks where durability or fire rated walls are necessitated. BUILDLING SYSTEMS HVAC: • Conventional A/C system direct expansion (DX), split systems, or rooftop units • Ventilation make up exhaust air fans based on project requirements • Mini-split DX A/C for special rooms as required • Provisions for outside air intake (wall louvers) as required • Shop equipment to be furnished by owner, with equipment list/mechanical and electrical requirements PLUMBING: • Portable water: From R/0 plant tie in and/or pump package from cistern/tanks • Sewer: On-site sewerage waste disposal system • Water heating system: electric tank type • Water saving plumbing fixtures • Roof drains/perimeter gutters for rain water collection • Hose bibs for convenience • Provisions for tie in for irrigation system (outside of initial scope of work by Architect — to be designed by others if needed for the project) • Emergency Generator — Diesel piping layout if required for the project • Water coolers/bottle fillers with water filtration • Shop equipment info/equipment list with plumbing requirements to be furnished by owner ELECTRICAL: • Proposed power via tie-in to GSJ diesel generator; otherwise a standalone generator will be proposed with future connections to GSJ power. 6 EFTA00794212 Great St. James Maintenance Building Architectural Programming • Fire alarm system as required by Life Safety Code NFPA 101 • Lighting fixture selections by electrical engineer using photometric calculations for outdoor and indoor • Lightning protection — Owner's option if this desired (no NEC requirement according to electrical engineer) • Owner to verify type of voltage available, and voltage requirements for any owner supplied equipment. Owner to submit equipment list and desired equipment layout for use by electrical engineer. FIRE PROTECTION: • To be designed per NFPA13 using cistern/tank water with extra capacity. Areas to be sprinklered per building code requirements (at a minimum). SUSTAINABILITY Facility to be designed to minimize energy, water, and land resources to minimize environmental impact. • Optimize site potential/use of land through building orientation on site which can affect energy use. • Optimize energy use of building to conserve electricity. • Select fixtures for water conservation/efficiency to reduce fresh water demand, rainwater catchment, and reuse or recycle grey water for on-site use if feasible. • Use building materials in most productive and sustainable way with building life cycle in mind. • Enhanced indoor environmental quality (IEQ) for occupant health and thermal comfort for increased productivity. Maximize daylighting, use appropriate ventilation, and moisture control, acoustic performance, and utilize low VOC materials for construction. • Use of materials to simplify and reduce maintenance requirements to reduce life-cycle costs. SUMMARY The architectural program for the GSJ Maintenance Building as outlined above is intended to assess the owner's building use requirements and organize the functional objectives with the goal of creating a successful project outcome. This document will be updated as information becomes available and modified accordingly. 7 EFTA00794213

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
56e145ce-9c52-4799-b91d-a434a0f5cd6f
Storage Key
dataset_9/EFTA00794207.pdf
Content Hash
bf27d58b4e87b23144bb0b5765a30558
Created
Feb 3, 2026