Great St. James Maintenance Building Architectural Programming
GREAT ST. JAMES
MAINTENANCE BUILDING
ARCHITECTURAL PROGRAMMING
FEBRUARY 15, 2019
(updated 2/23/19)
GREAT ST. JAMES, U.S. VIRGIN ISLANDS
Prepared by: Boschulte Architecture, LLC
EFTA00794207
Great St. James Maintenance Building Architectural Programming
GREAT ST. JAMES MAINTENANCE BUILDING
ARCHITECTURAL PROGRAMMING
INTRODUCTION
The purpose of this document is to identify the scope of work to be designed in terms of functional
and operational requirements and to gain a consensus of how the building and its systems will work
once the building is occupied. The intent is to provide information to make decisions regarding
current and projected space needs for implementation in order to guide the building design and to
inform design consultants, vendors, and potential builders/contractors of the general vision for the
completed facility.
GENERAL INFORMATION
Project Name: GSJ Maintenance Building
Project Address: Parcel No. B21-1 & B-2-2, Great St. James, Island
No. 6A Red Hook Quarter, St. Thomas, U.S. Virgin Islands
Owner: Great St. James/Little St. James, 6100 Red Hook Quarter B-3, St. Thomas, USVI 00802
Architect: Boschulte Architecture, LLC, 41-42 Kongens Gade, St. Thomas, VI 00802
PROJECT TYPE
The project type is a maintenance/engineering building. The types of spaces to be included are
identified in this document along with space criteria for those spaces.
GOALS AND OBJECTIVES
The function of the building is to be the headquarters of the management, operations, and
maintenance services needs for Little St. James (LSJ) and Great St. James (Gal). These functions are
currently housed in one or more structures located on Little St. James and the owner desires to
relocate them to a consolidated facility on Great St. James. The building will house the day-to-day
activities necessary for operation and maintenance staff to perform their basic duties in a safe,
functional facility.
SITE REQUIREMENTS
The project site has been previously identified by the owner to be Parcel No. B-2-1 and B-2-2, Great
St. James, Island (D9-7345-T004). The site will be located on the north-west area of Great St. James
near the knoll directly north of Christmas Cove bay. This provides location provides easy access from
the existing barge landing at Christmas Cove and is located away from the residential functions of the
2
EFTA00794208
Great St. James Maintenance Building Architectural Programming
island. The building should be sited to minimize lines of sight and to minimize acoustical impact from
the functions performed between the facility and the residential areas of GSJ and LSJ. Visual impact(s)
from the surrounding waters of GSJ is largely un-avoidable due to the anticipated size of the facility,
however aesthetics in this regard is recognized as an important consideration well. Existing project
improvements include dirt roadways, and large (relatively flat) open dirt area which is the anticipated
location of the facility. The perimeter of the open dirt area does have some earth fill/disturbed soil
which may affect structural foundation choices. The project site is zoned R-1, Residential.
Brian Moseley & Associates, Inc. DWG No.: 4790-8
COVENANTS, EASEMENTS, ETC.
Survey map delineates an easement "Ba" (D9-7345-T004) between Parcel No. B-2-1 and B-2-2. Design
should consider impact to this easement as it provides access to adjacent parcels C-2-1, C-2-2, and C-
2-Remainder.
Encroaching on this easement will hamper future access/development of those parcels. Design
should take this into account or propose alternative access easements for these parcels.
3
EFTA00794209
Great St. James Maintenance Building Architectural Programming
USE OF ADJACENT PROPERTIES
Use of adjacent properties is residential (largely undeveloped).
OWNERS OF ADJACENT PROPERTIES
All adjacent properties on GSJ island are under the owned by the project owner.
PUBLIC SERVICES
The public utilities are not available at the project site due to the site location being GSJ which is an
island off the south eastern coast line of St. Thomas, VI. Current and future vision for services is that
GSJ is to be a self-sustaining island. Possible future connection to LSJ for electrical grid connection is
being considered but will be unavailable when the project is constructed and during initial occupancy.
• Gas: If propane fuel is necessitated by the building's equipment or appliances these
will be stored in propane tanks to be refueled by propane vendor's trucks barged to
the island.
• Electric: No WAPA service is currently available on island. Building to tie into planned
underground electric service from the existing GSJ diesel generator. Provisions to be
made for future tie-in to anticipated undersea grid connection to LSJ electric grid.
Design consideration to be given to roof-top solar panels installation for sustainable
solar power production for the building.
• Communications and data: Phone and Internet service provider (ISP) to be determined
by owner. Space to be identified within the building for ISP hub/WIFI/Server etc.
• Sewer: No public sewer is available on site. Building to utilize a packaged on-site
sewage waste disposal system.
• Water: Primary water source will be from a packaged reverse osmosis plant (R.O.)
which is planned for GSJ. Intent is to connect to R.O. plant via tie-in underground
water main (under development). Consideration to be given to below ground or above
ground water cistern of site-cast concrete construction with roof top rainwater
collection as secondary source of water supply. Pre-manufactured water tank(s) are
another consideration for secondary water supply. Cistern or tanks may be
necessitated due to fire suppression/sprinkler requirements for the building.
FUNCTIONS
The facility is anticipated to house the following functions with square footages table below:
• Enclosed Maintenance Work Area ("wreck shop")
• Painting — storage, painting booth
• Electric Shop
• Wood Shop
• Grounds Maintenance / Landscaping
4
EFTA00794210
Great St. James Maintenance Building Architectural Programming
• Captain's Area
• Laundry Room
• Staff Break Room
• Male and Female Restrooms
• Pantry / General Storage ("Cost U Less")
• Boat Trailer Storage
• Office Space / File Storage
• Mechanical Room
• Electrical Room
• Circulation (corridors/hallways)
• Power Washing Station (exterior)
• Fuel station (exterior)
GSJ MAINTENANCE BUILDING
SPACE REQUIREMENTS
Existing Space No. of People Space Sub• No. of Square Feet
ID No. Space/Activity Spare Notes
GI" or Items Total Spaces Required
1.00 header Spaces
1.10 Maintenance Work Area 1,100 5 5,500 1 5,500
1.20 Panting 400 1 400 1 400
1.30 Electric Shop 400 1 400 1 400
1.40 Wood Shop 640 1 640 1 640
1.50 Grounds Mantenance/Landscaping 800 1 800 1 800
L60 CaptainisArea SO 6 300 1 300
1.70 laundry Room 320 1 320 1 320
L80 Staff Break Room 30 25 750 1 750
1.80 Male Restroom 100 3 300 1 300
L90 Female Restroom 100 3 300 1 300
1.10 Pantry/General Storage 800 1 800 1 800
1.11 Boat Traler Storage 200 5 1.000 1 1.000
1.12 CffIce Space /File Storage 350 1 350 1 350
1.13 Mechanical Room 480 1 480 1 480
1.14 Electrical Room 250 1 250 1 250
SUBTOTAL NET ASSIGNED SQUARE FOOTAGE 12,690
CIROJLATIONAND WALLS (@ 20%) 2,518
TOTAL GROSS SQUARE FOOTAGE 15,108
2.00 Beerier Spaces
2.10 Power Washing St aion (exterior) 320 1 320 1 320
2.20 Fuel Station (exterior) 480 1 480 1 480
230 Work Vehicle Perking 200 1 200 10 2.000
TOTAL AREA REQUIRED 2,800
revised 02/23/7019
EFTA00794211
Great St. James Maintenance Building Architectural Programming
CONSTRUCTION
The facility is anticipated to be constructed of a pre-engineered steel structure with metal panel
siding for the building envelope. Some portions of the building envelope may be constructed of
concrete block (CMU) walls for added durability. Foundation to be concrete slab foundation with
concrete footings at the locations of the steel structure columns. Steel structure to be designed by
steel building manufacturer per wind speed and seismic requirements of the project location
(provided by the structural engineer consultant adhering to International Building Code — IBC). The
building manufacturer to provide certified loading reactions to the structural engineer in order to
design the foundation. Roof to be of metal panel construction with rain water gutters at perimeters
and gutters to rain water collection cistern/tanks or to grade.
Interior spans to be kept as open as possible for interior layout flexibility and future space planning
changes if needed. Interior partitions to be of metal stud and gypsum wall board or concrete blocks
where durability or fire rated walls are necessitated.
BUILDLING SYSTEMS
HVAC:
• Conventional A/C system direct expansion (DX), split systems, or rooftop units
• Ventilation make up exhaust air fans based on project requirements
• Mini-split DX A/C for special rooms as required
• Provisions for outside air intake (wall louvers) as required
• Shop equipment to be furnished by owner, with equipment list/mechanical and electrical
requirements
PLUMBING:
• Portable water: From R/0 plant tie in and/or pump package from cistern/tanks
• Sewer: On-site sewerage waste disposal system
• Water heating system: electric tank type
• Water saving plumbing fixtures
• Roof drains/perimeter gutters for rain water collection
• Hose bibs for convenience
• Provisions for tie in for irrigation system (outside of initial scope of work by Architect — to be
designed by others if needed for the project)
• Emergency Generator — Diesel piping layout if required for the project
• Water coolers/bottle fillers with water filtration
• Shop equipment info/equipment list with plumbing requirements to be furnished by owner
ELECTRICAL:
• Proposed power via tie-in to GSJ diesel generator; otherwise a standalone generator will
be proposed with future connections to GSJ power.
6
EFTA00794212
Great St. James Maintenance Building Architectural Programming
• Fire alarm system as required by Life Safety Code NFPA 101
• Lighting fixture selections by electrical engineer using photometric calculations for
outdoor and indoor
• Lightning protection — Owner's option if this desired (no NEC requirement according to
electrical engineer)
• Owner to verify type of voltage available, and voltage requirements for any owner
supplied equipment. Owner to submit equipment list and desired equipment layout for
use by electrical engineer.
FIRE PROTECTION:
• To be designed per NFPA13 using cistern/tank water with extra capacity. Areas to be
sprinklered per building code requirements (at a minimum).
SUSTAINABILITY
Facility to be designed to minimize energy, water, and land resources to minimize environmental
impact.
• Optimize site potential/use of land through building orientation on site which can affect
energy use.
• Optimize energy use of building to conserve electricity.
• Select fixtures for water conservation/efficiency to reduce fresh water demand, rainwater
catchment, and reuse or recycle grey water for on-site use if feasible.
• Use building materials in most productive and sustainable way with building life cycle in
mind.
• Enhanced indoor environmental quality (IEQ) for occupant health and thermal comfort for
increased productivity. Maximize daylighting, use appropriate ventilation, and moisture
control, acoustic performance, and utilize low VOC materials for construction.
• Use of materials to simplify and reduce maintenance requirements to reduce life-cycle
costs.
SUMMARY
The architectural program for the GSJ Maintenance Building as outlined above is intended to assess
the owner's building use requirements and organize the functional objectives with the goal of
creating a successful project outcome. This document will be updated as information becomes
available and modified accordingly.
7
EFTA00794213
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 56e145ce-9c52-4799-b91d-a434a0f5cd6f
- Storage Key
- dataset_9/EFTA00794207.pdf
- Content Hash
- bf27d58b4e87b23144bb0b5765a30558
- Created
- Feb 3, 2026