Draft English translation for information purposes only
REGISTERED LETTER WITH RETURN RECEIPT Paris, March 28, 2011
OUR REF.: 1102-PHV/PC/GV
A.G.O. 2011
BUILDING: 22 AVENUE FOCH
75116 PARIS
Dear Sir and Madam,
You are requested to attend the Ordinary General Meeting of Co-owners of the building located in Paris
16'h district - 22 avenue Foch, which will be held in our Office at:
51 BIS, RUE DE MIROMESNIL in PARIS (8th district)
on THURSDAY APRIL 28, 2011 at 11:00 a.m.
To discuss the following agenda:
1. Election of a Chairman and officers for the meeting.
2. Approval of 2010 accounts and financial status.
Please find enclosed the financial status on December 31, 2010 with the debtors' status on
December 31, 2010 and to date, as well as the summary list of expenses occurred in 2010.
Decision to be made.
3. Approval of the 51h floor electricity repair's account for an amount of 21,531.01E, according to the
attached expense summary.
Decision to be made.
4. Approval of the 5th floor coffered ceiling works' account for an amount of 12,275.65 E, according
to the attached expense summary.
Decision to be made.
5. Approval of the 5'h floor carpentry works (wooden floor) account for an amount of 10,790.42 E,
according to the attached expense summary.
Decision to be made.
6. Approval of the 561 floor corridor painting works' account for an amount of 14,798.04 E, according
to the attached expense summary.
Decision to be made.
7. Approval of the caretaker's lodging painting works account for an amount of 3,905.63 E,
according to the attached expense summary.
EFTA01093151
Draft English translation for information purposes only 2
Decision to be made.
8. Status of debts and claims and financial status on December 31, 2010 and to date according to
status attached.
9. Discharge to the Property Manager ("Syndic") for his management.
Decision to be made.
10. New appointment of HELLIER du VERNEUIL S.A. as Property Manager.
Draft resolution: The Meeting appoints HELLIER du VERNEUIL S.A. as property manager
according to the agreement attached to this letter for a period of one financial year expiring on
the General Meeting which will be held to approve the accounts of2011financialyear.
Decision to be made.
11. Signature of the property management agreement with HELLIER du VERNEUIL S.A.
Mandate to be given to the Chairman of the Management Committee ("Conseil Syndical") to sign
HELLIER du VERNEUIL S.A.'s property management agreement.
Decision to be made.
12. Renewal of the Management Committee currently composed of:
Ms HALABI (NOFA Corporation)
Ms EXPERTON (SCI JEP)
Ms WIBRATTE (ROUNDHILL PARTNERS Corporation)
Mr DE LOUVIGNY (SCI ANGUS)
Mr LEMOS (SCI ALMOND)
Decision to be made.
13. Upholding of the projected budget for 2011 identical to 2010 at 256,000E and upholding of the
permanent cash advance at 43,000 E.
The running costs for 2010 amounted to 245,576.49 E (240,814,42 E in 2009), as shown in the
documents attached to this letter.
Decision to be made.
14. Fixing of the projected budget for year 2011, identically to the budget for year 2010.
Decision to be made.
15. Decision not to open a separate account and to keep the unique account.
Draft resolution: The General Meeting exempts the property manager from opening a separate
bank orpostal account and allows him to transfer thefunds belonging to the Housing Association
("Syndicat") to the unique account open in the name of thefirm HELLIER du VERNEUIL for the
duration ofthe mandate.
Decision to be made.
16. Building VAT pro-rata:
EFTA01093152
Draft English translation for information purposes only 3
Confirmation of the absence of modification of the use of the lots and of the current 99,700/99,700
thousandths pro-rata subject to 5.5 % VAT.
Draft resolution: The co-owners confirm the absence ofmodification of the use of the lots and the
current 5.5 % VAT pro-rata, given the 99,700/99,700 thousandths inhabitation pro-rata in the
building's use.
Decision to be made.
17. It is reminded that, according to the regulation in force, from 25 December 25, 2013, the threshold
of lead in the water shall be below I 0µg/I (Decree of 11 January, 2007).
Decision to be made to analyse the level of lead in the building water according to the "AFNOR"
standards. Fixing of an approximate budget of 200 E before tax per staircase, plus the lab analysis
costs of the samples: 29 E before tax per survey.
Decision to be made.
Att • "AFNOR" note.
18. Autorisation to be given to ICAMEL FOCH firm, owner of N°52 and 53 lots on the 41" floor to
open a 1.20 m x 2.10 m picture window in the separation wall between these 2 lots, in order to
make them communicate, as shown on the attached plan.
Draft resolution: The General Meeting authorises KAMEL FOCHfirm, owner ofN°52 and 53 lots
on the 4th floor to open a 1.20 m x 2.10 m picture window in the separation wall between these 2
lots, in order to make them communicate, as shown on the attachedplan.
Before any work, KAMEL FOCHfirm shall provide to the Property Manager and the building
architect a precise description of the opening works and an opinion from a structure controlfirm
(SOCOTEC or else). These works may only start after approval by the building architect, whose
fees shall be charged to KAMEL FOCHfirm. These works shall be peiformed in accordance with
the state ofthe art and regulations, by companies duly insured and qualified. KAMEL FOCHfirm
shall remain sole liablefor these works' implications.
Decision to be made.
19. According to study and call for tenders by LH CONSEIL, decision or not to replace the gas
boilers according to estimates attached:
Firm DISDERO: 210,090.23 Euros
Firm SPM NICOLAI: 216,937.55 Euros
Firm FULGONI: 226,026.98 Euros
Firm DELOSTAL & THIBAULT: 232,805.60 Euros
Optional:
- Filmogenic treatment (Amounts all included, 5.5 % V.A.T.):
Firm DISDERO: 3,330.64 Euros
Firm SPM NICOLAI: 3,439.30 Euros
Firm FULGONI: 3,584.89 Euros
Firm DELOSTAL & THIBAULT: 3,217.75 Euros
- Acoustic measures (Amounts all included, 5.5 % V.A.T.):
Firm DISDERO: 1,782.95 Euros
Firm SPM NICOLAI: 1,899.00 Euros
EFTA01093153
Draft English translation for information purposes only 4
Firm FULGONI: 2,215.50 Euros
Firm DELOSTAL & THIBAULT: 2,004.50 Euros
- Acoustic (Amounts all included, 5.5 % V.A.T.):
Firm DISDERO: 4,114.50 Euros
Firm SPM NICOLAI: 3,798.00 Euros
Firm FULGONI: 4,487.97 Euros
Firm DELOSTAL & THIBAULT: 3,481.50 Euros
- Steam regulator (Amounts all included, 5.5 % V.A.T.):
Firm DISDERO: 1,433.75 Euros
Firm SPM NICOLAI: 1,455.90 Euros
Firm FULGONI: 1,603.60 Euros
Firm DELOSTAL & THIBAULT: 1,709.10 Euros
The works' follow-up fees will be an additional 7% before tax for LH CONSEIL and 2.5 % for
the Property Manager of the works costs before tax.
20. Decision or not to subscribe to a cleaning contract according to estimates attached:
- P2 Gas boiler exploitation:
Firm DISDERO: 5,064.00 Euros
Firm SPM NICOLAI: 5,380.50 Euros
Firm FULGONI: 4,905.75 Euros
Firm DELOSTAL & THIBAULT: 5,538.75 Euros
- Clarifier + softener Contract:
Firm DISDERO: 1,318.75 Euros
Firm SPM NICOLAI: 1,371.50 Euros
Firm FULGONI: 1,213.25 Euros
Firm DELOSTAL & THIBAULT: 1,244.90 Euros
- Filmogenic contract:
Firm DISDERO: 1,097.20 Euros
Firm SPM NICOLAI: 1,160.50 Euros
Firm FULGONI: 1,266.00 Euros
Firm DELOSTAL & THIBAULT: 1,244.90 Euros
21. Further to the letter from the PARIS Townhall on 18 November, 2010 reminding the necessity to
perform the facade cleaning works on avenue Foch and rue Chalgrin, a copy of which is attached,
decision or not to perform the cleaning works, at once or in steps, of the facades on avenue Foch
with extension on rue Chalgrin, facade on rue Chalgrin, facades of main inner courtyard, facades
of the 3 small inner courtyards, facades overhanging the glass ceiling above the main entrance
hall.
Decision to be made.
EFTA01093154
Draft English translation for information purposes only 5
22. Cleaning of the facades on avenue Foch with extension on rue Chalgrin (to be performed
simultaneously to the cleaning of the - Ground floor and 1" floor - facades of the small inner
courtyard n°1 accessible through the caretaker's lodging).
Further to the study carried out by architect Ms LEMOINE according to attached report,
comparison chart and estimates, decision to be made on the following works:
LOT 1: Ground scaffolding (Amounts all included, 5.5 %VAT)
LA COLONNADE firm 74,286.77 Euros
DEL BOCA firm 76,374.83 Euros
LOT 2: Facades' cleaning
LA COLONNADE firm 234,030.65 Euros
DEL BOCA firm 241,614.73 Euros
LOT 3: Treating of metal shutters
DEL BOCA firm (10-year guarantee) 104,813.30 Euros
TIM firm (10-year guarantee) 95,392.05 Euros
LOT 4:, Railings locksmithing
SERRUTIM firm 7,042.00 Euros
LOT 5: Lead waterproofing on regular and small balconies
BALAS firm 97,191.60 Euros
RAVIER firm 77,150.52 Euros
LOT 6: Plumbing - rainwater downpipes
BALAS firm 7,703.45 Euros
RAVIER firm 7,077.58 Euros
LOT 7: Carriage entrance
SERRUTIM firm 2,445.00 Euros
The works project will be managed by Ms LEMOINE, certified engineer architect ("DPLG"),
assisted by a safety works coordinator.
The fees will come in addition: 8% for the architect, 1.5% for the safety coordinator and 2.5% for
the Property Manager.
Decision to be made.
23. Cleaning of the facades (Ground floor - Is' floor) of the small inner courtyard n°1 accessible
through the caretaker lodging (to be performed simultaneously to the cleaning of the facades
on avenue Foch).
EFTA01093155
Draft English translation for information purposes only 6
Further to the study carried out by architect Ms LEMOINE according to attached report and
estimates.
Decision to be made on the following works:
LOT 1: Scaffolding - cleaning (Amounts all included, 5.5 %VAT)
LA COLONNADE firm 33,491.10 Euros
(tiles variation) 1,044.45 Euros
DEL BOCA firm 43,675.42 Euros
(tiles variation not priced)
LOT 2: Roofing and plumbing
BALAS firm 7,681.82 Euros
RAVIER Firm 6,918.77 Euros
LOT 3: Anti-pigeons' nets
TECHMO HYGIENE firm 1,371.50 Euros
The works project will be managed by Ms LEMOINE, certified engineer architect ("DPLG"),
assisted by a safety works coordinator.
The fees will come in addition: 8% for the architect, 1.5% for the safety coordinator and 2.5% for
the Property Manager.
Decision to be made.
24. Cleaning of the facade rue Chalgrin
Further to the study carried out by architect Ms LEMOINE according to attached report,
comparison chart and estimates, decision to be made on the following works:
LOT 1: Ground scaffolding (Amounts all includedn 5.5 %VAT)
LA COLONNADE firm 30,452.28 Euros
DEL BOCA firm 27,894.60 Euros
LOT 2: Facades' cleaning
LA COLONNADE firm 92,265.03 Euros
DEL BOCA firm 89,482.27 Euros
LOT 3: Treating of metal shutters
DEL BOCA firm (10-year guarantee) 38,703.00 Euros
TIM firm(10-year guarantee) 46,493.85 Euros
LOT 4:, Railings locksmithing
SERRUTIM firm 10,313.00 Euros
LOT 5: Lead waterproofing on regular and small balconies
BALAS firm 35,946.02 Euros
RAVIER firm 23,804.20 Euros
EFTA01093156
Draft English translation for information purposes only 7
LOT 7: Plumbing - rainwater downpipes
BALAS firm 2,341.95 Euros
RAVIER firm 4,718.40 Euros
The works project will be managed by Ms LEMOINE, certified engineer architect ("DPLG"),
assisted by a safety works coordinator.
The fees will come in addition: 8% for the architect, 1.5% for the safety coordinator and 2.5% for
the Property Manager.
Decision to be made.
25. Cleaning of the facades of the main inner courtyard and the entrance hall rue Chalgrin (to
be performed simultaneously to the "main staircase light well" cleaning).
Further to the study carried out by architect Ms LEMOINE according to attached report,
comparison chart and estimates, decision to be made on the following works:
LOT 1: Scaffolding - cleaning (Amounts all included, 5.5 %VAT)
LA COLONNADE firm 219,602.70 Euros
DEL BOCA firm 286,494.74 Euros
LOT 2: Roofing and plumbing
BALAS firm 24,959.22 Euros
RAVIER firm 21,066.53 Euros
LOT 3: Anti-pigeons' nets
TECHMO HYGIENE firm 7,456.74 Euros
LOT 4: Metal shutters
DEL BOCA firm (10-year guarantee) 37,441.95 Euros
TIM firm (10-year guarantee) 88,115.71 Euros
The works project will be managed by Ms LEMOINE, certified engineer architect ("DPLG"),
assisted by a safety works coordinator.
The fees will come in addition: 8% for the architect, 1.5% for the safety coordinator and 2.5% for
the Property Manager.
Decision to be made.
26. Cleaning of "main staircase light well", to be performed simultaneously to the main inner
courtyard cleaning.
Further to the study carried out by architect Ms LEMOINE according to attached report,
comparison chart and estimates,
decision to be made on the following works:
EFTA01093157
Draft English translation for information purposes only 8
LOT 1: Scaffolding - cleaning (Amounts all included, 5.5 %VAT)
LA COLONNADE firm 66,809.00 Euros
DEL BOCA firm 47,215.95 Euros
LOT 2: Roofing and plumbing
BALAS firm 11,921.50 Euros
RAWER firm 8,417.53 Euros
LOT 3: Anti-pigeons' nets
TECHMO HYGIENE firm 1,371.50 Euros
The works project will be managed by Ms LEMOINE, certified engineer architect ("DPLG"),
assisted by a safety works coordinator.
The fees will come in addition: 8% for the architect, 1.5% for the safety coordinator and 2.5% for
the Property Manager.
Decision to be made.
27. Cleaning of the facades of the small inner courtyard n°2 accessible through the entresol
from the B staircase
Further to the study carried out by architect Ms LEMOINE according to attached report and
estimates,
decision to be made on the following works:
LOT 1: Scaffolding - cleaning (Amounts all included, 5.5 %VAT)
LA COLONNADE firm 70,629.10 Euros
(tiles variation) 2,488.75 Euros
DEL BOCA firm 90,972.65 Euros
(tiles variation not priced)
LOT 2: Roofing and plumbing
BALAS firm 19,967.15 Euros
RAVIER Firm 19,047.62 Euros
LOT 3: Anti-pigeons' nets
TECHMO HYGIENE firm 1,371.50 Euros
The works project will be managed by Ms LEMOINE, certified engineer architect ("DPLG"),
assisted by a safety works coordinator.
The fees will come in addition: 8% for the architect, 1.5% for the safety coordinator and 2.5% for
the Property Manager.
Decision to be made.
28. Cleaning of the facades of the small inner courtyard n°3 accessible through garage
EFTA01093158
Draft English translation for information purposes only 9
Further to the study carried out by architect Ms LEMOINE according to attached report and
estimates,
decision to be made on the following works:
LOT 1: Scaffolding - cleaning (Amounts all included, 5.5 %VAT)
LA COLONNADE firm 57,640.98 Euros
(tiles variation) 943.17 Euros
DEL BOCA firm 60,190.40 Euros
(tiles variation not priced)
LOT 2: Roofing and plumbing
BALAS firm 21,046.30 Euros
RAVIER Firm 23,218.30 Euros
LOT 3: Anti-pigeons' nets
TECHMO HYGIENE firm 1,371.50 Euros
The works project will be managed by Ms LEMOINE, certified engineer architect ("DPLG"),
assisted by a safety works coordinator.
The fees will come in addition: 8% for the architect, 1.5% for the safety coordinator and 2.5% for
the Property Manager.
Decision to be made.
29. Decision or not to subscribe a damage insurance coverage for the works performed under a 10-
year guarantee, according to attached offer by VERSPIEREN.
Decision to be made.
30. Financing of the works by a fixed-rate loan taken with CREDIT FONCIER, according to attached
prices list.
Draft resolution: The General Meeting, having read the loan resolution, decides to make a loan
with CREDIT FONCIER, with no joint liabilty of the co-owners, for a period of years and at
a % rate, with automatic transfer of the instalments from the co-owners' accounts. The
General Meeting gives HELLIER du VERNEUIL S.A., Property Manager, allpowers in order, on
behalfand in the name ofthe Housing Association, to:
- identifi the co-owners who intend to pay cash,
- identifi the co-owners who intend to join the loan,
request a loan with CREDIT FONCIER, whose amout shall not exceed the cost of the works
due by the co-owners who joined the loan in respect oftheir shares,
accept the loan offer resulting in a contract,
comply with all the duties of the loan contract, knowing that reimbursement shall be made by
automatic transfers from each co-owner's bank account, bound towards the Housing
Association for the only amount of his/her share in the loan for the payment of the works. In
this respect, the transfers shall be made by CREDIT FONCIER under its power ofattorney, in
the name and on behalfofthe Housing Association.
EFTA01093159
Draft English translation for information purposes only 10
sign a guarantee agreement with the firm COMPTOIR FINANCIER DE GARANTIE so that
the Housing Association shall by no means have to bear thefinancial consequences of any co-
owner'sfailure to reimburse his/her share of the loan.
The co-owners paying the works with the loan taken by the Housing Association under the
abovementioned terms already consent thereto.
Decision to be made.
31. At the Co-owners' General Meeting held on 25 June 2009, authorisation had been given to the
firm ROUNDHILL PARTNERS to replace its garage door, to the express condition that it would
be replaced simultaneously to the other four garage doors and by an identical model. As the other
four co-owners concerned never gave their consent, despite the many diligent trials from the
Property Manager and the firm ROUNDHILL PARTNERS, the latter was never able to replace its
door in the conditions so agreed upon by the General Meeting.
Autorisation to be given to this firm to replace its garage door, according to estimate attached, a
lined-up door, with wood coverage and painted with RAL n°1015, in oder to respect the building
harmony, with the obligation for all co-owners who would subsequently wish to replace their door
to do it accordingly, to preserve the building harmony.
Decision to be made.
32. Further to study by Mr LEBATTEUX, Esq., a copy of which is attached, authorisation to be given
to the Property Manager to initiate a legal procedure against Mr ASTIN, owner of the lots n°77,
56 and 57 on the building's 5'h floor, in an attempt to make him comply with the urbanistic rules
according to which a room for use of seasonal rental is not an inhabitable room pursuant to article
631-7 of the Building and Inhabitation Code.
Decision to be made.
33. In order to improve the building's security, mandate to give to the Property Manager to study,
with the assistance of a specialised bureau, the improvement of the building's surveillance by any
protection system.
Decision to be made - Fixing of a budget.
34. Matters related to the running of the building and its everyday maintenance.
Should you be unable to attend this meeting in person, you may be represented by a person entitled to
make any decisions on your behalf. For that purpose, please find attached a power of attorney which can
just be sent back to us once completed and signed. Your signature shall be preceded by the words "BON
POUR POUVOIR".
Yours sincerely,
EFTA01093160
Draft English translation for information purposes only 11
Pierre HELLIER du VERNEUIL
NB: According to article 23 of the Law of July 10, 1965, the joint owners are reminded of the
obligation to have a common representative, according to the attached representation power of
attorney. Thus, in the case of a conjugal joint ownership, only one of the spouses may attend the
Meetings. He/She must hold his/her spouse's power of attorney to represent him/her.
Exhibits:
Power of attorney
Summary list of expenses occurred in 2010 and budget for 2011
Summary list of works' accounts
Financial status on the closing of 2010 financial year and to date
Property Management Agreement with HELLIER du VERNEUIL SA
AFNOR Note
Plan of the 4th floor
Report from LH CONSEIL - Heating Works
DISDERO firm estimate
SPM NICOLAI firm estimate
FULGONI firm estimate
DELOSTAL & THIBAULT firm estimate
Letter from PARIS Townhall
- Report from Ms LEMOINE - Cleaning Works
LA COLONNADE firm estimate
DEL BOCA firm estimate
TIM firm estimate
BALAS firm estimate
RAVIER firm estimate
SERRUTIM firm estimate
TECHMO HYGIENE firm estimate
CREDIT FONCIER 100 co-ownership loan costs
Works damage insurance scale
Garage door estimate
Report from Mr LEBATTEUX, Esq.
Works shares' simulation
EFTA01093161
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 56d8f980-10d6-46d0-8db3-790cd4fd7505
- Storage Key
- dataset_9/EFTA01093151.pdf
- Content Hash
- 72b57b6b56991f3baf2745636f643985
- Created
- Feb 3, 2026