EFTA02492143.pdf
dataset_11 pdf 128.2 KB • Feb 3, 2026 • 2 pages
From: Leighton Allenby <
Sent: Wednesday, August 12, 2015 3:15 AM
To: Jeffrey Epstein
Cc: NYC - Richard Kahn; Anna Rodriquez; Daphne Wallace; Leighton Allenby
Subject: CZM meeting today
Hello Mr. Epstein,
Today Anna, Danny Vicars and I met =ith David Rosa from CZM and Kevin from The Jaredian Design Group to discus=:
1. Layout of the proposed maintenance and workshop =uilding project
2. Two roofs for the RO Plant and Generator building.=br>
The meeting went well. Concerns & comments bro=ght up by David Rosa:
1. New height of RO and Generator roo= from across the waters. I replied that the pitch of the roof was
aestheti=ally pleasing and roof color chosen by you is soft and blends into the ski=s. He quickly agreed.
2. He had no concerns with proposed building an= 80 foot layout and placement of building. We walked the
proposed layout t=at Danny Vicars laid out with orange markers.
3. David had a co=plaint from someone that we discussed. Complaint was that we were creating=stone buffers
preventing boaters from coming ashore to the beaches. I assu=ed him this wasn't happening since I started and that
there were natur=l reefs that prevented the boaters from coming ashore. He agreed an said t=at he had to ask as there
was a complaint. (Most likely someone saw machin=s removing rocks from the shore for the waterfall. We need to be
careful.)=/Ii>
4. David wanted to inspect grading of roads. We showed him one of the=roads going from maintenance building to
tennis court and he was pleased.<=li>
5. We discussed putting in drainage swales after the asphalt and minim=zing damage and he agreed that we would
have better control of the water r=ther than guessing where the drainage swales should be. David wants protec=ive
erosion control at each new drainage swale per permitt. I agreed.
=Ii>We discussed the Coastal Zone Management Act (CZMA) and why it is impor=ant for us to observe this Act.
http://www.coralreetgov/grants/noaa/USV=-CZMFactsheet-Jun03.pdf <http://www.coralreetgov/grants=noaa/USVI-
CZMFactsheet-Jun03.pdf>
6. David and I discussed my qualification=, previous projects on coastal zones and my working with the Town of
Falmo=th conservation Department on various projects on Cape Cod. David is from =rlington, VA
7. Kevin from Jaedian mentioned that the working dra=ings should be completed by the end of September. They
had to have plans m=dified for proper venting for carpenters shop and fertilizer/chemical stor=ge.
8. Daphne gave me a set of drawings that I will review.
9. I asked David if he will sign off on project and David commented that =ost likely after he reviews the plans once
more.
Best,
=div>Leighton
Leigh=on Allenby
EFTA_R1_01614675
EFTA02492143
845.702.1844
2
EFTA_R1_01614676
EFTA02492144
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 5038c5e7-e279-49d6-9454-e3e65d8cf4ad
- Storage Key
- dataset_11/EFTA02492143.pdf
- Content Hash
- 690cf96261b51c2e67af607c619a5d66
- Created
- Feb 3, 2026