EFTA00616430.pdf
dataset_9 pdf 552.1 KB • Feb 3, 2026 • 5 pages
Wednesday mber 07, 200710:21 AM ROBERT C.'
LEMIR'
•
Invoice
P
Orate invoice 0
if,SILNOLOGIES
p10. OC6 cur MAMA, ica,r Si KM 5 a 'Nana DS 0474 ft
1111O.007 20066
Sill To
Lefton' Contractors. L.L.C. Make all cheeks payable to:
Armakan Yadd Harbor Robert Lemke and/or
6100 Red Hook Quieter. Sun< .A2.7 Applied Marine Technologies. Ina.
St. Thomas. VI 00802 PO Box 1085 Fajardo. PR 00738
""N
Terms Project
Due on twerp( BERTHA LC'M 71
Description Est Ann 4ty Rate Amount
Parts and materials take oft
30-35 Ton custom fabricated yoke type Eyck:rube cyliitticm. 7.000.00 3,R00.00 7.600.00
C'ost for madam not available at this time.
Pilot operated do valves to lock gala in position. 1,000.00 500.00 1.000.00
12-24 volt 1' normally closed adenoid vale for tlatthig notion 350.00 1 350.00 350.00
I" Milne ck valve 85.00 1 85.00 85.00
3141Hy('Igue 30' porker nr equiw tent 2,700.00 .300 P.00 2.700.00
314" flare fittbtgs 880.00 40 22.00 880.00
≥4T 200.00 10 20.00 200.00
I" apt x314 dine 75.40 4 lasts 75.40
3/4 fine x 3/4 200.00 10 20.00 200.00
New alum plate (for reinfouing anti stiffening °clients)
I' met t 11215086 wiggle grade
Weld wire mid congmables miso. (3.000.00 6,000.00 6,000.00
wink pcifouutd 30.000.00 30.000.00 30.000.001'
Additional wodc
Pressing hull (gil caned) weld rip of crooked frames with hyd Jack Lower horn/deck
joint.
Grinding and suckling 10 125.00 1.250.00-f
Mogniala 350.00 350.00
Additional work (Fati tate 6 1007):
Remove and replace two new propellers.
Break couplers and remove time shaft.
Remove and replace new shaft logs repack as required.
Remsesubk and leave ready for splash.
Al! pads are supplied by vesseL
Labor 2.250.00 2 :5t) 00T
Prep and paint hull out side and inside bay area: 1..8(10.00 8.)t) 00T
Presque wash. power sand to remove flaking polar hem down tellow by 1 coat of
international enamel.
Materials 503.00 500.00
TIrE 2511ydrindic Oil 46 6 56.n: 340.02
( Subtotal Sales Tax (... Total Payments/Credits Balance Due
1(Si 481.32 52.471.00 $50.052.32 S-36.817.ttir $21.23•1.82
Thank you tbr your business.
Boats willnot hue launched nntil invoice it: paid in nut
SIN
Eaunil
7 nn TVA on:ni um? /)
EFTA00616430
EFTA00616431
BERTHA
Repair Budget
August 27, 2007
SHIPYARD COSTS Qty Unit Per Unit Labor Per Unit Material Per unit Sub Total Cost Notes
Haul / Launch Bertha 74 Ift $15.00 $1,110.00 Hauled 8/10/07
Blocking 74 Ift $3.00 $222.00
Transient Dock Fees 1 Day $124.12 $124.12
Lay Days 63 Days $122.10 $7,692.30
$9,148.42
MUST DO
Marine Survey 1 Tot $1,200.00 $1,200.00 Qom ed 8/24/07
Hydraulic Installation 1 Tot $52,000.00 $52,000.00 24 21)a7 )vip00
$53,200.00
NECESSARY OUT-OF-WATER REPAIRS
Stuffing box replacement 2 Ea $445.00 $890.00 Applied
10 hrs $55.00 $550.00 Applied VAT . .O o&
Replace propellers 2 Ea $3,121.00 $6,242.00 Applied
3 hrs $55.00 $165.00 Applied ptikt,
Clean the fuel system 1 Tot $500.00 $500.00 BH
12 hrs $37.50 $450.00 BH
Repair fuel leaks 1 Tot $1,200.00 $1,200.00 BH (E)
12 hrs $37.50 $450.00 BH
Rework bilge pumping system 1 Tot $150.00 $150.00 BH
8 hrs $37.50 $300.00 BH
Repair/replace drum steering switch 1 Tot $400.00 $400.00 BH
3 hrs $37.50 $112.50 BH
Repair radar mount 1 Tot $800.00 $800.00 BH
$12,209.50
SHOULD DO
Purchase and install fenders 8 ea $800.00 $6,400.00 10
3 hrs $37.50 $112.50 BH
Purchase and install 1-1/4" dock lines 1 Tot $1,590.00 $1,590.00
2 hrs $37.50 $75.00 BH _, ,
Repair oil leaks 1 Tot $500.00 $500.00 04PP4W6n4 itireekl;
40 hrs $37.50 $1,500.00 BH
Repair exhaust leaks 1 Tot $1,200.00 $1,200.00
Page 1 of 2
EFTA00616432
BERTHA
Repair Budget
August 27, 2007
32 hrs $37.50 $1,200.00 BH
Augment battery banks 4 Tot $310.00 $1,240.00
8 hrs $37.50 $300.00 BH
$14,117.50
WISH LIST
Clean and paint 8 gals $95.00 $780.00 N........ ockpbeb-Lif 1,060‘,
36 hrs $37.50 $1,350.00 BFI,
Rework / enclose bridge 1 Tot $0.00 more info to follow
hrs $37.50 $0.00 BH
Install engine start/stop controls 1 Tot $325.00 $325.00
8 hrs $37.50 $300.00 BH
Tune engines 1 Tot $125.00 $125.00
8 hrs $37.50 $300.00 BH
Install permanent windows and hatches 1 Tot $0.00 more Info to follow
hrs $37.50 $0.00 BH
Rework engine compartment lighting 1 Tot $1,054.00 $1,054.00
8 hrs $37.50 $300.00 BH
$4,514.00
Total $93,189.42
etiaeA-, NC/
V6/0
Page 2 of 2
EFTA00616433
BERTHA
Repair Budget
August 27, 2007
Per Unit Per Unit Per unit
SHIPYARD COST6 Vendor ON Unit Labor Material Sub Total Cost Add On Notes PO
Haul r Launch Bertha 74 Ift $15.00 $1,110.00 Hauled 8(10(07 (Puerto Del Rey) $1.332.00 WOrk order # 009426
Blocking 74 Ift $3.00 $222.00
Transient Dock Fees 1 Day $124.12 $124.12
Lay Days 63 Days $122.10 $7,692.30 Puerto Del Ray Marina $9,475.70 Work order # 009428
Puerto Del Rey (tax not budgeted) $832.20
Puerto Del Rey (Insurance not budge 51,080.77 Work order * 009428
$9,148.42 $12,720.87
MUST DO
Marine Survey 1 Tel $1,200.00 $1,200.00 Completed 8/24/07
Fuel $1,000.00 Puerto Del Rey (fuel not Budgeted) $500.00 Work order # 009428
Boscoe Travel $1,213.00
Hydraulic Installation Applied Marine 1 Tot $52,000.00 $52,000.00 APP90d $24.545.00 9/11 vAre
$12,272.50 10/22 wire
1221 Invoice e 20066
eel Unforseen hull air l Invoice e 20066
Applied (Tax not budgeted) Invoice # 20086
$53,200.00 $2,213.00 $53,661.40
NECESSARY OUT-OF-WATER REPAIRS
Stuffing box replacement 2 Ea $445.00 $890.00 Applied $203.95
10 hrs $55.00 $550.00 Applied $2 Invoice # 20086
Delivered to Tropical (shipping
charges will be a percentage of
Replace propellers 2 Ea $3,121.00 56,242.00 Frank 3 Jimmie Prop Shop $4.358.82 Cubic Feet of the container)
3 Na $55.00 $185.00 Applied fTSDRX Invoice # 20088
Clean the fuel system 1 Tot $500.00 $500.00 BH $3.00
12 hrs $37.50 $450.00 BH
Repair fuel leaks 1 Tot $1,200.00 $1200.00 OH $637.50
12 hrs $37.50 $450.00 OH
Rework bilge pumpIng_system 1 Tot $150.00 $150.00 BH
8 hrs $37.50 $300.00 OH
Repair/replace drum steering svAtch 1 Tot $400.00 $400.00 BH
3 hrs $37.50 $112.50 BH
Repair radar mount 1 Tot 3800.00 $800.00 OH
$12,209.50 $7,453.27
SHOULD DO
Deivered to Tropical (shipping
charges will be a percentage of
Purchase and install fenders Marine Fenders 8 ea $800.00 $6,400.00 Marine Fenders Intl $4,878.00 Cubic Feet of the container)
3 hrs $37.50 $112.50 BH
Purchase and Install 1-1/4' dock lines 1 Tot $1,590.00 31,590.00
2 hrs $37.50 $75.00 BH
Repair oil leaks 1 Tot $500.00 $500.00 . 71;54W2 Invoice X 20066
40 hrs $37.50 $1,500.00 BH
Page 1 of 2
EFTA00616434
BERTHA
Repair Budget
August 27. 2007
Per Unit per Unit per unit
SHIPYARD COSTS Vendor Qtv Unit Labor Material Sub IottCoet Add Cm ____ Paid
Repair exhaust leaks 1 Tot $1200.00 $1.200.00
32 hrs $37.50 $1,200.00 BH
Augment battery banks 4 Tot $310.00 31,240.00
8 hrs $37.50 $300.00 BH
$14,117.50 $5,218.92
WISH UST
Clean and paint 8 gals $95.00 $780.00 APIA& gnalift) Invoice 4 20008
38 hrs $37.50 $1,350.00 BH
Rework! enclose bridge 1 Tot $0.00 more Info to follow
hrs $37.50 $0.00 BH
install engine start/stop controls 1 Tot $325.00 $325.00
8 hrs $37.50 $300.00 BH
Tune engines 1 Tot $125.00 $125.00
8 his $37.50 $300.00 BH
Install permanent windows and hatches 1 Tot $0.00 more Info to follow
his $37.50 $0.00 BH
Rework engine compartment lighting 1 Tot $1,054.00 $1,054.00
8 hrs $37.50 $300.00 BH
$4,514.00 $2,300.00
Total $93,189.42 $2,213.00 $81,352.26
Page 2 of 2
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 4f806815-e007-4f67-8a18-9b97d9be7202
- Storage Key
- dataset_9/EFTA00616430.pdf
- Content Hash
- 41e1da8ad13ce7f5673fa87d7cedee1a
- Created
- Feb 3, 2026