EFTA02709336.pdf
dataset_11 pdf 57.6 KB • Feb 3, 2026 • 1 pages
From: Daphne Wallace <
Sent: Monday, June 1, 2015 4:24 PM
To: Jeffrey Epstein
Cc: ann rodriquez; Rich Kahn
Subject: Fwd: FW: tunnel/ maint
Attachments: TUNNEL AND MAINT FLOOR-(6-1-15)_.pdf
Greetings Sir,
The dimensions from John= as per your request on Friday.
Respectfully, 4>=A0Daphne
Forwarded mes=age
From: John P. Woods, AIA</=> < >>
Date: Mon, Jun 1, 2015 at 11:14 AM
=ubject: FW: tunnel/ maint
To: Daphne Wallace < <mailto », Ann Rodriquez
>, Cecile d=Jongh < <mailto >>
Daphne,
As requested, floor plans of the existing "tunnel" building and m=intenance building with square footages.
JPW
Original Message
From: JAREDIAN DESIGN GROUP [mak° >1
Sent: Monday, June 01, 2015 11:32 AM
To: John P. Woods
Subject: tunnel/ maint
Here are the existing floor plans with the square footages
JAREDIAN DESIGN GROUP
Architects, Engineers and Construction Managers E-mail <http:/ E-mail>
'Ofc Fax www.jaredian.com
This email is free from viruses and malware because avast! Antivirus protec=ion is active.
http://www.avast.com=br>
EFTA_R1_02115600
EFTA02709336
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 4ef413d8-3e80-4773-bda2-5182d0e665e5
- Storage Key
- dataset_11/EFTA02709336.pdf
- Content Hash
- 3109bdd4688d66f6ad35fd6d3a52206d
- Created
- Feb 3, 2026