EFTA02617634.pdf
dataset_11 pdf 189.2 KB • Feb 3, 2026 • 5 pages
From: Richard Kahria
Sent: Thursday, October 25, 2018 3:55 PM
To: Jeffrey Epstein
Subject: Fwd: S & C Electrical Company - New and old switches
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
Begin forwarded message:
From: =/b>michael glidde
Subject: =/b>Re: S & C =lectrical Company - New and old switches
Date: =/b>October 25, 2018 at 11:33:56 AM =DT
To: =/b>Richard Kahn
Cc: Daphne Wallaci , Brice Gordon■
Generator 1 is currently on-line as back up to WAPA.
On Oct 25, 2018, at 11:32 AM, michael glidden
wrote:
Good day.
The two voltage regulators purchased from Rimco are on their =ay back to Rimco along with one of the
old ones and are to be =rogrammed by Rimco for our particular gensets.
This =ame to be due to the fact that Rimco's parts department is not =ully aware of the parts they sell. A
tech in their service department =nformed us that they should not have sent the regulators out without =rogramming
them first. Hence they are on the way back.
EFTA_R1_01819946
EFTA02617634
The G51 generators will =e set in place as soon as they arrive so the Q hut can be erected over =hem.
Should I proceed with tie-in of the solar =ystem to the new generators? What is the status with Pro
Solar?
On Oct 24, 2018, at 5:26 PM, Richard Kahn
<mailto > wrote:
please advise on =tatus of both L51 generators being online
thank =ou
also what =s timing to install G51 generators..
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York. NY 10022
On Oct 23, 2018, at 5:45 PM, Richard Kahn wrote:
thanks for update
i assume generators were not finished today?
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
On Oct 23, 2018, at 5:37 PM, michael glidden =rote:
2
EFTA_R1_01819947
EFTA02617635
Once the generators are =inalized and fully on-line the replacement will be
scheduled with =APA.
We will be on generator for several days while the =eplacement takes place.
MG.
Sent from my =Phone
On Oct 23, 2018, at 3:02 PM,
> wrote:
can you please update on status of this =roject
thank you
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
On Sep 14, 2018, at 7:01 PM, michael glidden =rote:
Hey Rich.
Once I can get a look at the new unit there may be some =rounding lugs,
grounding wire and some misc hardware to purchase. All =mall money.
On Sep 14, 2018, at 4:43 PM,
<mailto wrote:
thank you
what other materials will be needed for the switch from old =o new?
please advise
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
3
EFTA_R1_01819948
EFTA02617636
On Sep 14, 2018, at 3:10 PM, michael glidden =rote:
Good day Rich.
Mr Hodge is not needed. I will coordinate directly with WAPA =n the shut down
needed for the removal and installation of the old and =ew switches.
Once the new switch is on island and = have all materials needed I will schedule
with WAPA for the work to be =one.
MG.
On Sep 13, 2018, at 10:52 AM, Richard Kahn
> wrote:
Thank you Daphne.
Mike do we need Hugo hodge or wapa involved on install or =ill this all be done
in house. Please advise. Thank you.
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue, 4th Floor
New York, NY 10022
On Sep 13, 2018, =t 11:26 AM, Daphne Wallace
<mailto: > wrote:
Greetings Mike,
Welcome back.
The switch gear was =elivered to the port. I need the final invoice please.
Kind regards, =aphne
4
EFTA_R1_01819949
EFTA02617637
<Warehouse+Tally - S&C Electric =ompany.pdf>
<Packing List - S&C Electric =ompany.pdf>
<=r class="">
5
EFTA_R1_01819950
EFTA02617638
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 4d93aeb3-4c39-4ab6-ac76-31e970952dc9
- Storage Key
- dataset_11/EFTA02617634.pdf
- Content Hash
- ddceebf0cc9bc82fae666f9ca1c58ed4
- Created
- Feb 3, 2026