To:
From: Robert
Sent Mon 2/18/2013 2:47:24 PM
Subject FW: Installation Schedule
This is the installation schedule. I wish it was starting tomorrow. Maybe we will order windows and nail
down the framer. Get steel ready and manhole for the pump.
From: Tami Ackert - SWHV
Sent: Monday, February 18, 2013 9:39 AM
To: Wayne McAuliff
Cc: Robert
Subject: Installation Schedule
Robert,
To confirm our conversation, the schedule will be as follows:
Thursday, 2/21 - Site Preparation
Friday, 2/22 - Install Day 1
Monday, 2/23 - Install Day 2 and hopefully complete
Thanks,
Tami
On 2/15/2013 2:24 PM, Wayne McAuliff wrote:
Hi Tami,
Site looks good in New Canaan. Do you have a set schedule?
Thank you,
Wayne
EFTA_R1_00808410
EFTA02147492
Sentfrom my Verizon Wireless 4G LTE DROID
Tami Ackert - SWHV a wrote:
Robert,
We will be down tomorrow to do a site check. I'm working on rearranging
the schedule so I will get back to you with the actual installation date
that our crew will begin.
Thanks,
Tami
On 2/13/2013 7:47 PM, Robert wrote:
> We will be ready.
> —Original Message-----
> From: Tami Ackert - SWHV
> Sent: Wednesda Februa 13, 2013 10:36 AM
> To: Wayne McAuliff
> Subject: My email
> Robert,
> Our emails have been down for a few days now. Please use this email if you
> need to contact me.
> I just spoke with Wayne and he said you felt you'd be ready for a site
> inspection on Friday. Would you be able to confirm with me tomorrow that I
> should schedule our personnel to come check it?
> Thanks,
> Tami
> My phone number if you need to call me.
EFTA_R1_00806411
EFTA02147493
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 414a486b-f221-4b16-af7e-6ac75d0e1245
- Storage Key
- dataset_10/a768/EFTA02147492.pdf
- Content Hash
- a76846761389ae5bc44317ddcd75fa17
- Created
- Feb 4, 2026