Construction Proposal
Quantum Vision Construction LLC
8168 Crown Bay Marina
Suite 505 PMB 260
St. Thomas, VI 00802
September 12, 2018
Owner: LSJE
Little St. James Island, VI
Project: Asphalt Pathways Paving Works
Little St. James Island, VI
SCOPE OF WORK:
• Prepare and grade existing sub base
• Eradicate and remove weeds and organic material from existing sub base.
• Compact sub base to insure stability
• Spread and compact 3 inches of aggregate base material
• Place new 3•inch reinforced Portland cement concrete pathway, mimimum 4=inch pavement is recommended for
vehicular and equipment traffic. Concrete will be a minimum 4,000 PSI.
SPECIAL CONDITIONS:
• LS] will remove, secure, and replace all stone and other border edges.
• LS] will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island.
• Aggregate base will be supplied by owner.
• Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a
part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor
will not be responsible for replacement of these damaged areas while implementing normal construction procedures.
• Amount of $114,000.00 will be credited to owner on behalf of Betteroads Asphalt LLC.
OPTION (NOT INCLUDED IN BASE PRICE):
• As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re•Surfacing Project" and dated September
18, 2014.
TOTAL BASE PRICE: $712,586.00
Little St. James Island Paving Page I of2
EFTA00807988
Construction Proposal
Project Table:
Name Description Quantity Unit Cost Unit Total Cost
Portland Cement
4-inch reinforced pathway 13.0(X) 547.(x) $611,000.00
Concrete Pavement
Excavation and 3-inch course aggregate base 13.000 SI 3(X) $169,250.00
Sitework material.
Intervention amount on behalf
Credit 1 -S114.000.00 L.S. 4114,000.00
of Betteroads Asphalt LLC
Total Paving $666,250.00
Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project"
and dated September 18, 2014.
Concrete Swales Described above 32 51.064.00 EA $34.048.00
Aggregate Base
Described above 31 S182.00 EA S5.824.00
Pad
Rip Rap Detention
Described above 31 $202.00 EA 56.464.00
Area
Total Drainage Measures $46,336.00
Total Costs 5712.586.00
Little St. James Island Paving Page 2 of2
EFTA00807989
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3f93d900-fb7c-424d-a673-e862b32f68db
- Storage Key
- dataset_9/EFTA00807988.pdf
- Content Hash
- 7a88230382f555d888abadb0b27ba1af
- Created
- Feb 3, 2026