8 July 2014
RE: Schedule
Proposed Renderings:
Dining Room (1) 3D perspective
(1) Rendered Plan
Stair Hall (3) 3D perspectives: 1" looking toward staircase; 2nd looking toward fireplace;
3ed looking at Upstairs Hall
(1) Rendered Plan
Entry (1) Rendered Plan and Elevation
Entry Office (1) 3D Perspective
(1) Rendered Plan
(1) 2D Rendering of the Elevation as one enters the residence thru the Stair Hall into Dining
Room
Proposed Schedule:
End of August-Early September: 1" round of renderings presented, design is refined
End of September-Early October: rd round of renderings presented, design is refined
If required, End of October: 3a round of renderings presented
If not, mid-October design approved
Mid Oct-December — prepare documentation for pricing
December/January 2015 — pricing
January 2015 — begin construction
Amy Cassell Atelier, LCC, Chicago, IL 60657
EFTA01078083
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3f8a69d5-e528-4926-b669-5ad2fab42e8a
- Storage Key
- dataset_9/EFTA01078083.pdf
- Content Hash
- 030d1d575123f8ead724d0af94e640cb
- Created
- Feb 3, 2026