EFTA01141725.pdf
dataset_9 pdf 447.6 KB • Feb 3, 2026 • 3 pages
From: Larry Visoski
To: Jeffrey Epstein <jeevacation@gmail.com>
Subject: Re: stereo system
Date: Tue, 29 Oct 2013 11:38:53 +0000
Inline-Images: image.jpeg; image(1)jpeg
Jeffrey,
Here is stereo quote that explains components installed,.
Change to quote was two SUB amps were installed.
EFTA01141725
OPTION 16
611 CMS Switches
All cabin management
reassembly and certification.
Additional cost for this
Authorized Acceptance --
OPTION 17
822
for
Entertainment System
switches will be sent to the
0ption...4 11,670
JEGE, LLC
manufacturer for disassembly, metal plating,
Date
Remove and discard the existing equipment in the credenza and speakers. Procure, engineer
(electrical and structural) and install the following equipment integrated to aircraft systernisl.
•
•
28vDC to 12vDC power converters
Procure and install four (4) AK-55140M power converters to provide 12vDC power to each
the four (4) new amplifiers. FUR mid cabin credenza
4 Channel JL Audio Amplifiers
Procure and install two (2) X0400/4. 100Wx4 amplifiers to power the
midrange/tweeter
of
1
Speakers R/H mid cabin credenza.
Mono Block JL Audio CLs D Sub Amplifiers
the sub woofers.
Procure and install two (2) XD600/1, single channel amplifiers to power
R/}1 mid cabin credenza.
EFTA01141726
--" W r
SC Send Heed
Plass. and Lift
rant *an burn Irr Isayer (hot trlu reeir tam
los equipper , Csar tr) kwaif,x700 head
n0.Cm'r art:
7.
1 l'asi roe:yeaainpulkeRsti
Ana* Tv
%cubs
%awe ° •11 sub abbievierres snekon sasss sinmenr"C"
v.. cieni "Cern° "Pin
"*. Arab
me R11 real Gabon
Li IO I HS $G-Wil 100' sub screen
Creelenz 4nd1"W biro 12)
x,
0,00..Con Vdr Nock/on Ara ifeikaa PSS
12 0341Mi opens n re mon Set atee
anti nil° ° Ohl Olt P10
Adelleksi coot ter IS
Chtles-1/ 40*
Aullhalasa Aciefastri
lot OS
S3E. LLC
QPTION 44
eueseapCseeeee et*
MIVIIIMIIMitt les areeleehaneseeideet teseseesithedebtesestork
rre•WOrnails, Sesseresseerseeste eree-retadlessille. 000,0" . "
I/Ceminomesii
"Webia..4 0. OSSIMIMIsimassibal•••••••• •• •
thereelletabo• Sees ens esserlesse tiOrreses
Wesseerverthea
eteldedateebeselssanesseeren
Addliketelemel ler due Oplies—S steel
114/ :11en•AlMalinew
M— -
1000 SCHEDULE
1001 Schedule
and advanced teed leth le woos
The schedule dependent 'con elected *a scope
Soma Ceentence hen aeulcabon and resod engeneenlo to completle he .alas
%Oft SOX* Si bee dr rebted
A schedule sel be eiternWried MIa. MS
plow* yal en Melee epectsion
Thar* Wu VIM /Or aall opPrtulety to
Sent from my iPad
On Oct 29, 2013, at 6:57 AM, Jeffrey Epstein leenct®gmail.com> wrote:
re sound, we had a discussion day one about speakers. , there are no mid range . please send details of what
was installed. the subs are right now. the control head is not. nor is the screen.
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
re sound, w
EFTA01141727
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3f0849b2-bb29-4270-82b1-b141344e83d7
- Storage Key
- dataset_9/EFTA01141725.pdf
- Content Hash
- ffd50797efee45ad8c76f7680a83829f
- Created
- Feb 3, 2026