Epstein Files

EFTA02708618.pdf

dataset_11 pdf 106.8 KB Feb 3, 2026 2 pages
From: Leighton Allenby Sent: Thursday, August 27, 2015 11:16 AM To: Jeffrey Epstein Cc: NYC - Richard Kahn; NES - Merwin Dela Cruz; Leighton Allenby Subject: NES: Local Law 11 Cycle 8A Report & Costs Attachments: NES Local law 11 report 2015.pdf, 9E71_tr6(1).pdf Hello Mr. Epstein, Attached is the Facade Inspec=ion & Safety Program Local Law 11 Cycle 8A Report with recommendations=for repairs for 9 East 71st Street in NYC. The re=ort gave us a safe finding and no immediate recommendations are required w=thin the next 5 years. After reviewing with Rich and Merwin it was decided=to obtain a bid from Herbert Rose, inc for the following items as a preven=ive measure to preserve the integrity of the building rather than wait and=have costly repairs in the near future. Water will penetrate cracked areas=and cause much damage. I feel that it is best to correct these items rathe= than wait. We received a bid from Herbert Rose f=r &19,000. and negotiated to $17,600. for the following repairs: =div> Repairs recommended by: 1. Page 9 - photo 6: there is a c=ack along motor joint that should be caulked. Remove existing stone =atch and prepare stone for new patch 2. Pa=e 10 - photo 8 & 9: Cut and point all cross at water joints at w=ter table 3. Page 11- photo 10: Cle=n cracked joint in flat copper water table joint (two locations) and insta=l new Kemper strip over each joint. 4. Pag= 12 - photo 12: Clean rust area. Prime and paint. Clean and reseal railing=connection into stone wall 5. Page 14 - ph=to 16 : The bottom right bracket bolt is rusting/replace bolt and check br=cket. Install working basket in the bulkhead wall and go down to replace e=isting chimney anchors with new stainless anchors. 6. Install sidewalk bridge on south facade. (at main entrance) =A0approx. 1/2 the cost of proposal 7. N.Y.= sales tax not included in price 8. Projec= Timeline 1. two weeks notice to comme=ce 2. four men / 2 to 3 weeks from start t= completion Rich mentioned that you wanted no work into=the middle of October. We both collectively thought this was a fair price.=/div> Would you like this scheduled for then? Please let me know how y=u want to proceed. =est, Leighton EFTA_R1_02111021 EFTA02708618 Le=ghton Allenby Director of Properties 2 EFTA_R1_02111022 EFTA02708619

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
3eadb717-f692-4f4f-bc86-42a0b4947f01
Storage Key
dataset_11/EFTA02708618.pdf
Content Hash
9e0de888dfb074542466fa475e4e4534
Created
Feb 3, 2026