From: Leighton Allenby
Sent: Thursday, August 27, 2015 11:16 AM
To: Jeffrey Epstein
Cc: NYC - Richard Kahn; NES - Merwin Dela Cruz; Leighton Allenby
Subject: NES: Local Law 11 Cycle 8A Report & Costs
Attachments: NES Local law 11 report 2015.pdf, 9E71_tr6(1).pdf
Hello Mr. Epstein,
Attached is the Facade Inspec=ion & Safety Program Local Law 11 Cycle 8A Report with recommendations=for repairs
for 9 East 71st Street in NYC.
The re=ort gave us a safe finding and no immediate recommendations are required w=thin the next 5 years. After
reviewing with Rich and Merwin it was decided=to obtain a bid from Herbert Rose, inc for the following items as a
preven=ive measure to preserve the integrity of the building rather than wait and=have costly repairs in the near future.
Water will penetrate cracked areas=and cause much damage. I feel that it is best to correct these items rathe= than
wait.
We received a bid from Herbert Rose f=r &19,000. and negotiated to $17,600. for the following repairs:
=div>
Repairs recommended by:
1. Page 9 - photo 6: there is a c=ack along motor joint that should be caulked. Remove existing stone =atch and
prepare stone for new patch
2. Pa=e 10 - photo 8 & 9: Cut and point all cross at water joints at w=ter table
3. Page 11- photo 10: Cle=n cracked joint in flat copper water table joint (two locations) and insta=l new Kemper
strip over each joint.
4. Pag= 12 - photo 12: Clean rust area. Prime and paint. Clean and reseal railing=connection into stone wall
5. Page 14 - ph=to 16 : The bottom right bracket bolt is rusting/replace bolt and check br=cket. Install working
basket in the bulkhead wall and go down to replace e=isting chimney anchors with new stainless anchors.
6. Install sidewalk bridge on south facade. (at main entrance) =A0approx. 1/2 the cost of proposal
7. N.Y.= sales tax not included in price
8. Projec= Timeline
1. two weeks notice to comme=ce
2. four men / 2 to 3 weeks from start t= completion
Rich mentioned that you wanted no work into=the middle of October. We both collectively thought this was a fair
price.=/div> Would you like this scheduled for then? Please let me know how y=u want to proceed.
=est,
Leighton
EFTA_R1_02111021
EFTA02708618
Le=ghton Allenby
Director of Properties
2
EFTA_R1_02111022
EFTA02708619
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3eadb717-f692-4f4f-bc86-42a0b4947f01
- Storage Key
- dataset_11/EFTA02708618.pdf
- Content Hash
- 9e0de888dfb074542466fa475e4e4534
- Created
- Feb 3, 2026