EFTA00578393.pdf
dataset_9 pdf 866.7 KB • Feb 3, 2026 • 13 pages
WEEKLY REPORT
FRIDAY SEPTEMBER 6, 2002
ACTION POINTS REOUIRING JE's COMMENT
71ST STREET
i) JE to still use the Thalgo massage table heating blanket before advising if we are to
purchase for any other property.
ZORRO
ii) is aware that the tent needs to go near Hogs Back but is unsure where — please
advise?
iii) Where would JE like the Ponce de Leon placed, or should this be placed in storage?
iv) On discussion between GM, and NS, it was agreed that a further two vehicles
for the ranch are required with regard to the transportation problem encountered during
JE's previous visit — namely a Tahoe and Suburban. JE to please advise if it would prefer
us to source new or used vehicles?
v) has a further quote for the electric portion of the plumbing project from Broken
Arrow in the amount of $6,900.00. This is the best quote she has received as the other
two quotes were $12k and 14K. JE to plse approve.
JAI
vi) Nanna — This is repaired and in the water. The boat needs to be detailed and cleaned
which involves teak deck dressing etc. This is scheduled for next week. Due to the
pending visit, I can put this project on hold. Please advise?
vii) Hot Tub — This has been installed. Mr Epstein requested that the temp be increased. The
programming pumps and solenoids are designed for the current temp. The temp is set at
this maximum level to avoid any liability claims for injury caused by the water getting
too hot. To increase the temp further would require extensive alterations. Is Miles to go
ahead?
viii) The plans calling for a wooden gym have been altered to allow for the use of cement
floors and walls. JE would like the outer face of the building stoned as per main house.
The structure will remain the same in terms of structure and dimensions. This has been
approved by JE.
Progress - Miles has started the process of moving the existing gym to a new location.
This should be completed by Friday September 6. Thereafter they will start the ground
work and layout. Miles would like JE to give final approval to the layout before we start
to pour the cement. This layout should be ready for the next scheduled visit, been 13
September 2002. If not, the view from the new gym will be the same as the current gym.
Is this in order
EFTA00578393
PALM BEACH
ix) The quotation for the landscaping lighting has been received in the amount of
$2,717.00. Please approve.
x) Small gun safe with a digital pad for the remainder of the weapons still to be purchased.
The quotation received from John was $1,100.00. JE to please authorize?
**********************************
2
EFTA00578394
FORTNIGHTLY REPORT
71st STREET
A. Restoration / Waterproofing
Same 0 Richard approved the tinting on the dutchman repairs and work will
start Saturday 7 September and this should only take one day.
B. Front Door Hardware
to Almost complete except for inactive door, need to modify the spindle
that holds door knob. Locksmith will come in and add half inch to it.
Will complete the hardware on Monday, and staining on Wednesday.
C. Security
in) Installation will be complete by next Friday once they have worked
Wednesday through to Friday due to JE being in-house. Security
Products is currently working around JE's schedule.
D. General
Same iv) Telephones — the Sawyers brothers are both working now NS is
setting up a meeting between Sawyers, NS and Richard to resolve the
telephone issues now. They previously advised as follows:
I. When doorbell rings, beeper system on staff belts will vibrate.
Tom advised NS today 6 September that he has investigated a
simpler system at a better price. This will be discussed further at
the meeting.
2. JE has advised that the two buttons on the telephone that will be
lost are the Tahoe and Merc buttons, enabling J.E. to gain home
and away modes. These buttons will enable JE to press "away"
mode (call forward) and "home" mode when he is in house. We
have requested Sawyers to advise when they will be able to
instigate this and they are still to advise. Pat from Sawyers has
advised that we change the colour of these two buttons to green
for "away" mode and red for "home" mode.
3. Sawyers are still investigating an "address book" storage for the
telephone. GM has now authorized Sawyers to source an address
book storage of 400 — 600 names. We are awaiting this.
iv) Wireless Network Computer — This has been removed from 7 Is'
Street and installed at 656' Street.
GM has requested that Pinto prepare coloured boards for the entry
hall of 71s' street. We have heard nothing back from Pinto on this. We
will chase when the offices open in September. GM has heard
nothing back from Pinto on this and will address this with him.
3
EFTA00578395
vi) JE advised that Pinto was to make the table cloths and overlays for
the dining room and a fax has been sent off to request him to do this.
We will chase when the offices open in September. GM has heard
nothing back from Pinto on this and will address this with him
via) & her boyfriend — passport has not been
issued yet. She expects it within the next 2 weeks. Her boyfriend has
advised that he can now travel and spend a month in the States. He
can go to the Island in that time and make recommendations if you
wish.
Lighting - NS spoke with David Rockwell again. David is coming up
with a proposal which should be with us by Friday 13'h September.
PARIS
Old Apt
GM has received no update from Pinto's office on the Paris apartment.
Same i> Fat Lady Painting —Jean to change the frame
Same ii) New carpet for boudoir.
Same iii) Painting of boudoir.
Same iv) Painting in loo off boudoir — GM was advised when she was in Paris
that the painting would be done in September.
Same v) Root chairs — Jean does not like the root chairs.
Same Chandelier in master bathroom will now only be arriving in
September.
Same vii) Jean to purchase a desk lamp for the new desk.
Same viii) Dining room collection — JE advised to use existing collections
Same ix) Rolling cart — GM to source and purchase.
x) Harlequin & Crystal Skull — Arrived
Same xi) Basement areas to cleaned and fixed up.
Same xii) Both computers are still to have card readers re-installed.
Same xiii) A small box of some sort needs to be created for the light control next
to GM side of the bed.
Same xiv) Shoe rack for JE closet.
4
EFTA00578396
Same xv) Purchases:
• Doorstop
• 2 x Tissue Holders
GM to do xvi) Photos needed for the Apt:
• Two 8 x 10
• One 12 x 8
• Four 7 x 5
• Eleven 11 x 15'/z (horizontal) — replace pictures on hall wall by
guest bed
Seven 11 x 1512/ (vertical) - replace pictures on hall wall by guest
bed
• Nine 8% x 13 — replace African frames
• Three 714/ x 1014
/ - replace African frames
xvii) Door codes have been changed.
xviii) JE advised that the air-conditioner in the master bedroom was still
broken — GM still has no update.
xix) Globe desk will be raised but we have no time frame yet.
New Ant
Same xx) Jean to buy small table & chairs from Habitat to accommodate the
LSJ model as per JE instruction.
xxi) No schedule yet on the new apartment — the apartment schedule will
be sorted out when GM meets with Pinto in October.
65th STREET
1. Items ordered from Chiaso:
Ladder for office — still backordered. Shipment has been further still
delayed and will chase again week of 12'h September.
Backgammon set — still backordered. Will chase again week of 12th
September.
Same 2. Bedside table and TV unit in master bedroom — GM has found nothing
suitable yet.
Same 3. Security Products - JE approved the proposal and the installation will
take place once 715' Street installation is complete. In the rear yard two
sensor lights will be erected by Rich.
4. Wireless system — this has been installed at 65'h and is working in the
entire house.
KINNERTON
1. DVD Player — this has been installed and is working in GM's room
5
EFTA00578397
2. Paint walls in the living room. This has been done and they will be
varnished next week, 91h —13th September.
3. Range Rover — this is due to be collected by Ray today.
ZORRO
Water Pump
i) The pump is in and they are waiting for the pitless adaptor (not
expected till Oct). If we need to put the pump in before it arrives we
can rig it temporarily and then fix it the correct way when it comes in.
Survey ii) Darren has now consent from all landowners, and he has sent the
easements documents to the Electric Company for their approval. The
surveyor will be able to complete the survey once the Electric
Company has approved the easements.
iii) We cannot proceed further until the survey is complete and approved.
This can only be done once all easements have been signed allowing
the surveyor to survey over their land.
Electricity
iv) has a further quote for the electric portion from Broken
Arrow in the amount of $6,900.00. This is the best quote she has
received as the other two quotes were $12k and 14K.
Same v) Land use permit in hand.
Same vi) Building permit in hand.
vii) Slab has been poured for the building housing. The building was
originally scheduled to arrive August 30'h but was delayed, and we
expect delivery Monday September 9.
viii) Expected date to erect building is September 13.
ix) Plumbing — has received three quotes on three options, find
attached. Gary Kerney has recommended that we go for Option 2 at
$102,680.00 as opposing to the initial suggested quote of $50,680.00
(Option I) which was to tie the new water system into the existing pipe
line. This pipe line was installed by the Kings and has the following
problems:
a. The line is not buried below the frost line resulting in pipes bursting
during winter, resulting in continual repairs.
b. Due to point a the pipeline has numerous patches and would not
stand the pressure of the new water system.
NS requested to obtain a detailed breakdown of this amount
as JE feels this is excessive. Dale advised that it would take them a few
6
EFTA00578398
days to get the breakdown and has promised the quote on Monday
September 9.
I agree with Gary Kerney assessment and would also recommend
Option 2. Mobilization would take at least two weeks once the contract
has been signed.
Same x) Once the building is in place the following will happen:
a. Electrician will get a permit (should take 2 days)
b. Electrician will then commence the installation of the meter box
and circuits inside the building.
c. Inspector will come out and view and approve (depending on their
schedule they can usually come within 48 hrs of being called)
d. We will then be ready to tie into the 3 phase power.
Security
xi) Security guard — Awaiting decision from JE and GM.
xii) Security gate — This project was suspended until the entry gates
for the Zorro house are complete. Mike can start on entry gate
Oct. 1.
xiii) Security camera - met with security camera people last
week but was not pleased with the ideas put forth by the camera
companies and is meeting with a further company on Friday
September 6. (they come highly recommended).
xiv) Fence - Fence is on hold until September 10. Mano has spent the
last week on car repairs. He will start helping Mike with the entry
gates on Friday September 6 then he will then return to work on
the fence September 10.
Hangar
Movie Theatre
Same Project has not moved forward. JE to appoint someone to design
building.
40ft Digital Screen - NS spoke with Caroline (Michael Bay's
assistant) who advised that he is away filming on location at the
moment. Caroline has said that she will make and some calls and
get the information for Nick. She will call as soon as she has the
information.
Entry Gates
xvii) Mike is working on the entry gates. Mike has cut the vertical
posts and has started to bolt them together. Mano will start to dig
the holes Friday September 6. They will be set in the holes
September 9 and pictures will be sent.
7
EFTA00578399
Same xviii) Fountain — GM sent a fax and email to Pascal per your request.
You wanted the look to be something big, and present it you
when he found it.
General Items
xix) JE authorized NS to purchase of three more handguns to enable a
weapon to be kept in each vehicle. has received a quote
for the cost of 3 handguns - $2,399.85. There is a 3 week delivery
timeframe.
xx) Pew will be started first week in October.
xxi) Map - Arrangements are being made to have Adam redo the map.
Adam was supposed to come to the ranch September 4 but he had
car trouble so he will be out September 9.
Same xxii) Microwave Tower — Val Comm has still not figured out the
exact problem.
xxiii) T1 Lines - There has been a hold up establishing the account.
Eric spoke to Time Warner on Tuesday and was able to give them
more information that they needed. Still looking at 2 weeks.
xxiv) Staff Uniforms - NS & GM to investigate concepts and designs.
xxv) Medical cards have been logged in from last visit and will be
sent to Nick in NY.
xxvi) is currently setting up medical training of staff through
her husband. He is also investigating a new medical emergency
kit for all properties and aeroplanes.
Same xxvii) JE for info — Tamara & Jeff's last working day will be October
3nd.
LSJ
Carpentry
Same 1. Yoga deck — JE does not like proposed canvas awning. Miles/Bruce to
source alternative covering.
Same 2. Cushions and coven are being made by the same company that is
producing the seat covers for the electrical cars, and when the company
asked what would need to be ready first, Bosco advised that the seat
covers should take priority, so the cushions and covers will only be
ready once the seat covers are complete.
3. Floating Dock - Additional floats have arrived on island. This project
will be commenced whilst cement work for the new gym is drying.
8
EFTA00578400
Same 4. Lookout house (Blue) — a sliding door of some sort is to be created to
provide privacy. Entrance to be hidden.
5. Twin railings on all steps — master bedroom building process is
completed. The painters will be completing the project next week.
Same 6. Build a side screen on the master bedroom wind protected deck and
move steps to accommodate the addition.
Same 7. Great room wind protected terrace area - build a wooden wall below
the wind weave to accommodate the new doors. This is in progress
Same 8. Experiment with plexi-glass weave to protect from wind and also allow
view.
Boats
Same 1. Larry and NS still working on boats and setting up trial of Magnum 50
in Long Island. NS has spoken with the boat dealer. At this stage the
Magnum 50 has been taken out of the water for winter. NS is still
endeavouring to set up a trial.
2. Nanna — This is repaired and in the water. The boat needs to be
detailed and cleaned which involves teak deck dressing etc. This is
scheduled for next week. Due to the pending visit, I can put this project
on hold. Please advise?
3. Ms Maxwell, Cathy and Miles looked at a number of boat yards in
Puerto Rico. There were a few boats of interest and information about
the boats has been sent to Ms Maxwell via FedEx.
Landscaping
1. Bali shipment — The shipment is due to arrive in St Thomas on the 12th
September.
2. Grass path - this is being completed.
3. JE has signed a letter of agreement with Madison Cox Design Inc. who
will be doing the landscape design services. NS has sent a copy to
Charles Miller and a signed copy back to Madison Cox and has
requested Eric pay the $40k deposit.
Household
Same 1. Erect eight bamboo flagpoles — the design from Ed Tuttle has been
refaxed to Miles as he could not locate ES' previous fax.
2. Sea-life scenes — Artist has been working again this week and has made
progress.
9
EFTA00578401
3. Hot Tub - This has been installed. Mr Epstein requested that the temp
be increased. The programming pumps and solenoids are designed for
the current temp. The temp is set at this maximum level to avoid any
liability claims for injury caused by the water getting too hot. To
increase the temp further would require extensive alterations. Is Miles to
go ahead?
4. Install glass garage type doors on the terrace below the great room to
provide a movable clear wind screen. Bruce is researching materials and
door samples.
Research and im estivtion
1. Sea Water Pump on trailer to assist with filling salt pans, fires etc —
Miles and Bosco have found nothing suitable yet.
2. Wind Generator — Tower has arrived on island and is being installed
this week.
3. Maintenance and Storage Shed — JE has approved this and has been
ordered. Cheque has been sent.
Same 4. Miller advised that it is premature to go to Puerto Rico to view stone
samples as even if he finds suitable stone there is no guarantee he will
be able to get the quantity needed, so until such time as the quantities
are available, it is not worth his going.
Miscellaneous
1. New Helipad light fixtures are on order and should be on island by
end next Friday 131h September.
2. Telephone system has been repaired. We are now preparing to move to
full digital interface. This was scheduled for this week but the local
authorities have not completed their tasks yet. We have rescheduled for
two weeks (20'h September).
Same 3. Install music systems in all electrical cars — JE advised we are to go
ahead and install the sound systems in all the buggies and to have white
seat covers installed. This is currently being instigated and the seat
covers are being made.
Same 4. Model of LSJ which Ed Tuttle is doing will be completed — this was
delayed and is not expected until second week in September.
Same 5. Security — puppies arriving at the beginning of September and will
need to be trained locally in St Thomas as per GM. Awaiting update on
arrival from JE.
10
EFTA00578402
6. Chinese Lanterns — Miles to place them at various locations on the
island where he thinks it suitable for JE's next visit.
7. Moroccan lanterns they have been purchased and are being shipped to
LSJ — advised that these should arrive in St Thomas next week (20th
September) as shipping was delayed in NY.
8. Courtyard Lighting
Install hidden spotlight in the pagoda against the blue room/bedroom
one shining towards the swimming pool — light must not be seen from
the left or right hand side of the courtyard.
9. Parrot at entrance — build an octagon with 6 foot sides and 6 foot
height and install hidden lights on four corners.
10. Design and construct one page instruction guide on use of the radio.
11. The plans calling for a wooden gym have been altered to allow for the
use of cement floors and walls. JE would like the outer face of the
building stoned as per main house. The structure will remain the same
in terms of structure and dimensions. This has been approved by JE.
Progress - Miles has started the process of moving the existing gym to
a new location. This should be completed by Friday September 6.
Thereafter they will start the ground work and layout. Miles would like
JE to give final approval to the layout before we start to pour the
cement. This layout should be ready for the next scheduled visit, being
13 September 2002. If not, the view from the new gym will be the
same as the current gym. Is this in order?
Outside contractors
I . steam room and the great room doors and plans. JE requested
further changes to plans - we are awaiting these from Springline.
2. Move the master bedroom shower pump to accommodate steam room.
3. Miles is awaiting a decision on the generator to be used. This will cost
in the region of $12,000.00. Ensure that the steam generator creates
twice the capacity required. Interior is to be completely tiled in white
and the exterior is to be plastered and painted.
4. Boilers - If an electrical unit for the steam generator is used, we will
have to run independent cabling to the generator as the current
electrical amp draw is verging on maximum capacity. Both a diesel and
propane fired option have been located. HRT series 5-60HP (gas & oil
pr combination fired) and Vertical Tubeless HE 1.5-20 HP (natural
gas/propane fired) are both sized for over 1000cu. ft meeting JE's
sizing specs. Please note it has been advised that if utilizing the gas
option, it will use 1.5 gallon of propane gas per hour.
11
EFTA00578403
5. Employees of local government agencies were on island on Thursday.
The purpose was to inspect the core sample sites of the proposed new
house location on top of the hill. Secondly to inspect the intake and
outflow systems for the RO plant. I am expecting a report back from
them next week, 9th — 13th September. One comment that I think needs
to be communicated was made regarding the proposed area for the new
swimming pool and pavilion. There are core sample sites at this area.
The comment was "I think that you will meet resistance to the proposal,
as this is still a wet land even though the salt pond aspect appears to be
dead".
6. Ed Tuttle — to supply design of beach house pool design. NS sent a
further fax on the 6th September to Mr Tuttle.
Same 7. Refer to letter sent by Kevin Qualls to Miller regarding the time lines
for the pool and temporary residence — rough time line and can be
changed at any time. Darren is aware of this.
8. NS has sent a fax to Charles Miller relaying that JE requires Ed Tuttle
to do any and all design work for LSJ, and that Springline should only
be used for drawings once Ed Tuttle has done the design work.
Salt Pond
1. Ed Tuttle drawing 2 pavilions for either side of the pond — fax sent 6/9
requesting update on when we can expect these.
2. Source and purchase 10 x 50 gallon drums of Pond Clear and algae eater
to be used in the salt ponds.
Dock
1. Dock Demolition - Miles received a call from Charles Miller who
indicated that the dock demolition process is scheduled for next week,
9th — 131h September. I cannot verify this with the builders.
Items to purchase
1. Purchase an ambulance/first aid vehicle authorized for the island -
cheque to be sent on Friday, 6 September.
2. Purchase additional gardening equipment authorized per JE - cheque
sent.
Same 3. Heli pad shelter — JE has instructed that Miles utilize a local architect
to design a shelter using cement blocks. Proposal to be sent through to
JE. Miles is attending to this.
4. Shotgun. One more is required. This will be bought on Cathy's gun
license application. Application has been submitted — Miles has
12
EFTA00578404
indicated that it would take approximately 3 weeks to process. This was
delayed and Miles will investigate week of 9th - 13th September.
Mosquitoes & 1. Dan Ariaz will travel to LSJ 14th — 17th October to review the mosquito
Sandflies and sand fly problem and put forward a proposal for JE to review.
Ongoing
1. Repair the work done on beach two.
2. Continue stoning roads.
3. Complete installing wipers on Seamore.
4. Install weights on New Holland tractor.
5. Repair master bedroom rain gutters
PALM BEACH
1. Small gun safe with a digital pad for the remainder of the weapons
still to be purchased. The quotation received from John was
$1,100.00 so NS will have the new and these handguns will be locked
away in the safe when JE is not in house. He will purchase this on
Tuesday 27 August.
2. Couple for PB — Pedro & Imelda — this couple will be arriving and
starting at PB next week 10th September.
3. Gardens — The new landscaping has been completed.
The quotation for the landscaping lighting has been received in the
amount of $2,717.00.
727
Same 1. Morrison still looking for a person to install the different style blinds.
On hold until different style is found.
457 Madison
1. JE wants a decorator to come up with a scheme for his office, but not
Pinto. Keith Hobbs will be back in New York over the next week or so
(+1- 23rd September) and he will advise on progress he has made with
regard to his proposal.
2. 4 Green velvet chairs have been recovered and have been delivered.
******************************
13
EFTA00578405
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3e1abbb9-9c78-4ef7-b88e-8330f4bf6b4f
- Storage Key
- dataset_9/EFTA00578393.pdf
- Content Hash
- b068d959e9b0ca55ce85554e11749a42
- Created
- Feb 3, 2026