01.01.00 Zone Ranch and Wireless Ethernet and Saco saw 9100 50.00 9103 $0.00 9100 9103 saw
Router Proposal
0101.01 Eng,neenng and System Design Work 50.00 9100 Sa00 5000 9103 $0.00 9100 9103 24.0 53,000.00
0101.02 Pored hbngement 50.00 $000 $000 saw 100 52.50000 $aoo saw 9103 $0.00
01.01.01 Equipment Ordering and Inventory 4.0 5300.00 Sa00 $000 5000 9103 $0.00 MOO 9103 saw
0101.01 Staging for the Adtran 4430Router saw 9100 to $20000 saw 9103 $0.00 MOO 9103 saw
01.01.06 Starpng for the Radwin 2000C link 50.00 4.0 $340.00 9100 saw 9103 $0.00 MOO 9103 saw
0101.w Stapane for the Ruckus Wireless Equipment 50.00 4.0 $340.00 saw saw 9103 $0.00 MOO 9103 $0.00
01.02.00 Deploy to Lano Ranch andInstall Radwin
Link at the Equipment 01*(2 Installers and 1
Tech) $0.00 9100 9100 5000 9103 6.0 $0.00 1800 521900 9103 saw
01.02.01 Pull CatSe horn Pole to Frame Inside Fire
Station 1.0 5150.00 9100 9100 saw SOW moo 9100 9103 saw
01.02.02 Install Indoor Frame at the Fire Station 4.0 5300.w $000 9100 5000 $003 $0.00 9100 9103 saw
0102.01 Install Pathan Radio and Pole Mount
Hardware SO $450.00 $000 9100 saw saw $0.00 9100 9103 saw
01.02.01 Install Pole Ground Rod and cables 4.0 $300.0 9100 Sa00 saw saco $0.00 9100 9103 saw
01.02.0S Install Adtran LISvntth at Fire Station saw 2.0 $111100 9100 saw saw $0.00 9100 $003 saw
01.02.06 Install Ruckus Zone Director In the Fire
Station vnth UPS saw 2.0 $110.W 9100 SOCO 9103 $uo 9100 $003 $0.00
01.02.07 Remove Adtran WAP and antennae from the
fire Station Top LeVel 4.0 $300.00 4.0 $340.w 9100 SOX° 9103 woo saw 9103 $0.00
0102.08 Run outdoor CatSe far Ruckus API& 4P2
back to the Wall Mount Swing out Frame 4.0 $300.00 4.0 $340.120 9100 saw SOW woo 9100 9103 saw
01.03.00 Deploy to taroRanch to Install Radwin Link
at the HVAC (2 Installer and 1 Ted.) SOCO $0.00 9100 SOCO SOW 6.0 $0.00 1800 $21900 9103 $0.00
01.03.01 Install Indoor Frame at the StVAC Building 2.0 5150.00 2.0 5110.00 9100 saw saw $0.00 saw saw saw
0103.02 Install Radwin Radio and Pole Mount
Hardware at HVAC SO 54$0.00 2.0 $111100 $000 9000 $003 $0.00 9100 9103 $0.00
0103.01 Install Router In the Main House tower Level
and Test Connections saw 2.0 $110.00 $000 $0.00 $0.03 $uo 9100 9103 90.00
01.03.01 Install Transient Protection and all Grounding
for Pole and Inside Frame 2.0 StSO.00 2.0 $170.120 saw Saw saw $0.00 saw saw 90.00
01.03.06 Pull CatSe and mount Ruckus AP4 at the
HVAC Guiding 2.0 StSO.00 2.0 $170.00 9100 saw $003 $0.00 9100 9103 90.00
01.04.00 Deploy to Zone Stanch toInstall {Ovarian and
Panel at the KVAC (2 Installer and 1 Tech) saw $0.00 9100 saw 9103 6.0 woo 1800 $21900 9103 $0.00
01.04.00 Install %Degree Panel Antenna for Alvarron
onPole and Relocate Radio 4,0 $300.00 2.0 $170.120 9100 SOLO 9103 $0.00 9100 9103 $0.00
01.04.01 Install Ethernet Switches anclIP Phones at
each location specified saw $0.00 9100 saw 9103 $0.00 9100 $0.03 90.00
01.010S Mike all Final Equipment Connections at the
Open Frame Rack in the Fire Stationand Test
Voile Phones and Internet Access saw 4.0 5340.00 Sa00 Saw $003 $0.00 9100 9103 90.00
01.05.00 Deploy to Site to Test and Sign Off with
Customer 60 $450.120 6.0 $510.00 9100 Saw $003 4.0 $aw 90.0 5112.50 9103 90.00
Totals 50.0 $3,750.00 42.0 $3,571/00 tO $760.00 Saw 20.0 $2.500.00 22.0 $0.00 630.0 087.SO 0.0 S0.00 24.0 53,000.00
EFTA00305870
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3d8d281b-048d-4001-a6e0-857952906391
- Storage Key
- dataset_9/EFTA00305870.pdf
- Content Hash
- 2f4734b3066847fb7472b7d519de7aff
- Created
- Feb 3, 2026