2019 Mav 29 Punch List Conference Call Notes -still trying to schedule with barge to pick up cement, doors, etc Outdoor freezer, washers, anything easy to take? Or leave and take together... -when will barge be operational: hoping our barge week of June 3 -.trying to get Global Marine barge by Friday -3 quotes for shade structure (rich send JE the 3 bids) Award bid this week. Bedminster and Gumbs are close. Who does Mike want to use? Mike wants to use Bedminster.-he is outstanding. -RO Intake...brine installed yesterday morning -Domestic kitchen...completion? Plumbing completed today and Sylvester to finish tomorrow if possible. -Cabanas, the latches arrived. Push to open latches are installed in cabana bathrooms. Letf over latches to be used on flagpole -Chandeliers at GSJ are installed...bulbs need to be installed. (Mike) -3rd pump ordered will take 6 weeks. Around July .5th to shop out...arrive 12th to Tropical FL. Clear on 17th, so by July 22nd we will have. -Daph, maintenance kits and stuff Mike needs. -RO Parts: do we have them all? Yes...including maintenance items for LSJ decal. -Wall Sconce started chipping them out now... -Fenders for barge ordered...10 week production time...should be done around Aug. 2 to be ready to ship from factory. -Mold: can't find mold in gym? Says something is wrong, but gym came up with less. Keep dehumidifiers in there. Wood could be problem on GSJ -Welder borguth 2 sets of frames today and will bring more tomorrow. Weather permitting he will also start tomorrow -Bill Terry: giving you the job to sell old generators. Talk to Mike...sell them down island -Paul Gandy call again and find out when he can visit-ME!!!! EFTA00285788 -Mike says something needs to be top coated...once paintes -Water sport dock waiting on measurements from Michael. Tracking down pre fab doors so Brian doesn't have to make them. -Tiki Huts rain needs to stop to work on them -RO Water Testing when was last time, Sent water out for testing today =did it) Did Smiley get copies from the lab -Quadski: we can't rush them. No dates...just opened up the quadski and give him a break...others in front of us. -Jeff has not started due to the rain EFTA00285789

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
3c71cc69-74a2-492d-8b35-b8b5c8ff709e
Storage Key
dataset_9/EFTA00285788.pdf
Content Hash
1fe8028d3b047e34da186ea6b8b4bb2f
Created
Feb 3, 2026