STATUS ITEM COMMENT
> Update 1. AC in master bedroom. Air i) Diffusers will begin installation 15 April.
volume to be increased and
diffusers to be changed. ii) FYI: Installation of the diffusers expected to take two
weeks, the room will have to be repainted and require
scaffolding, JE to advise once the diffusers are on sight,
most appropriate two week for week to be complete.
+ Update 2. Oxygen supply iii) Oxygen tank had to be rented; it will be in Paris 28
March.
+ NC 3. Photos for livingroom iv) Sarah is printing photographs.
+ NC 4. Boudoir Add Rug. v) Rug being made, expected end of May
+ NC 5. AC in Kitchen vi) To be reviewed at the time as the AC in the new apt.
+ Update 6. Wireless System vii) 2 Linksys wireless routers (French Versions) and a
wireless adapter for the desktop computer from a French
supplier have been ordered.
+ Update 7. Front Gate New key system viii) Expert will and her of a for JE
8. Chandelier in the bathroom ix) Has been hung. Hiding of wires expected in 2 months.
EFTA00577740
PARIS
STATUS ITEM COMMENT
NC 9. Horseshoe Table/Ash Tray x) Jean has advised the horseshoe tables will be ready in 2
months (April).
+ Update 10. Change Windows before xi) Windows installation expected to commence 15 April.
Winter
'o thy
STATUS ITEM COMMENT
+ NC 1 1. Gym equipment
2
EFTA00577741
PALM BEACH
STATUS ITEM COMMENT
+ Update 1. Landscape Lighting i) Installation started 20 March. Will take 4 days to
+ JE Please complete. Is JE happy with it?
advise
+ JE Please 2. Club Chairs — Staff house ii) Expected delivery 1st April.
advise
+ Update 3. Furniture for Paula Epstein iii) Triconfort furniture will be delivered 17 April.
+ JE Please 4. Triconfort Cushions iv) Ordered new cushions, expected delivery 17 April.
advise
+ Update 5. Revamping the back v) Completed is JE happy with it?
entrance
ON HOLD 6. Auto Hurricane Shutters vi) JE sd not to do anything at this time with the shutters.
+ NC for Remaining Sections of
House
3
EFTA00577742
REDECORATION OF HOUSE
7. Schedule from Pinto vii) Project Solutions took measurements and will be back
week of 24 March to refine their work.
+ Update
****************************
4
EFTA00577743
457 MADISON
STATUS ITEM COMMENT
4 NC 1. Decorator for JE office i) Bastion supplied JE with info on proposed concept,
and JE is considering proposal.
+ NC 2. Darren's Office to buy new ii) JE wanted new furniture. GM to purchase new desk &
furniture cabinets for Lauren's area & conference table & look
+ JE plse advise at dividing unit for Lauren & Darren.
+ JE Please 3. Directory Update iii) JE to approve.
advise
4 Update 4. New LSJ Model and 2x3 iv) Second model expected to be completed 10 April. Is
+ JE plse advise replica JE happy with the completed models?
+ JE plse advise 5. Body Cast of Alina. v) Waiting for response as to type (material of cast) for
JE to make decision.
5
EFTA00577744
65TH STREET
STATUS ITEM COMMENT
+ Update 1. Office Extension 0 Being processed. Expected approval 11 April in
planning of zoning.
+ Update 2. Fender ii) Fender expected 7 April.
+ Update 2. Lamp iii) Fender expected 7 April.
6
EFTA00577745
715T STREET
STATUS ITEM COMMENT
Update 6. Lighting i) Engineer to give quote by 4 April.
+ NC 7. Surveillance Cameras 3rd ii) Two quotes supplied in the sum of $16,730.00 and
Fir $14,508.05 by two companies. JE to approve. Should
+ JE plse advise commence when construction begins.
Will have to go with Security Products since GFI is
out of business.
+ NC 8. Upgrade of Landis System iii) 10/1 — Need to upgrade the Landis BMS System from
Windows 95to ensure alarms to beeper system is up to
date. Upgrade to the latest technology approximately
$28,500.00.
+ JE plse advise SG recommended to update Windows 95 for the time
being.
Is JE in favor of upgrading system to new dial out
feature and adding domestic hot water system to BMS
system?
+ Update 9. Antennae Company iv) Approved per JE. Will proceed with Sawyers. Nextel
will install a system with a repeater; will call on 24
March with a schedule. Awaiting time frame but work
should commence when construction begins.
7
EFTA00577746
DECORATING
STATUS ITEM COMMENT
+ NC 10. Converting part of v) Awaiting quote by Michael Bernice. Should we get
+ JE plse advise basement in to staff another quote? Recommend second completive bid.
quarters
+ Update Waiting for bid from Bernice.
+ NC 11. Redecoration of living vi) Furniture will be in storage end of April. Getting
room and MBR competitive storage bids. Will have bid by 4 April.
8
EFTA00577747
AEROPLANES
STATUS ITEM COMMENT
+ Update 1. GIIB Stage III i) Stage III — JE will not pursue
+ Update 2. GIIB Iridium Blending to ii) Iridium boxes have arrived at JA PBI for SatCom upgrade -
Aircell complete
iii) 21/2 — Larry would like to install an AirCell / Iridium handset
in cockpit of GIIB, for crew usage during en-route changes
and logistics, wiring is already there, it would only require
purchasing and mounting handset = $2,952.00 complete, no
additional down time - Complete
+ NC 3. 727 Interior iv) Florida Flight viewed 727 to bid on interior removal and re-
installation including modifying aft lavatory for shower — one
quote has arrived minus the shower component from FLA
interiors.
+ NC v) Foam test cushions are complete.. Suede samples given to JE
+ JE plse to make a decision.
advise
vi) January work scope with Jet Aviation to include:
+ Update a. Office chair foam has been altered with movable
adjustments and stiffened T cushion. Seat will be
reinstalled by 14 March. - complete
+ Update vii) Quote received from Lou Martin for shades JE to review. Still
awaiting aft lavatory shower modification quotation. Lou
Y NC Martins is no longer quoting the shower.
9
EFTA00577748
STATUS ITEM COMMENT
NC viii) Interior removal & re-installation of the "C" check is still out
for bidding.
+ NC
ix) Awaiting quote from Pro Aircraft Interior for shower
installation — they are checking on mechanicals.
x) August 2003 work:
a. Pacific Gas Turbines selected to do work on the No. 2
engine high pressure compressor.
+ Update b. "C" check back open for bids.
+ Update xi) SFAR 88 (Fuel Tanks) — received relief from Dugan for the
winglets and BFGoodrich for engine mods. Currently
working on all other STC's and modifications in compliance
— no problems foreseen just time consuming. At FAA mtg in
Nov.
+ NC - JE plse 4. Helicopter xii) Dave to go to Bell school 21 April.
advise
10
EFTA00577749
STAFF
STATUS ITEM COMMENT
+ NC 1. Helicopter Pilot — Nicholas i) He is interested in the position. Nicolas sd that until the
summer he would be busy with the Navy contract, and so he
could look after the helicopter and fly it. He has one assignment
for the navy in Jan for a week. Nicolas also sd that he had lots
+ JE plse advise of holiday due to him which he could apply for and use his
holiday time to work for JE.
+ NC 2. Bill Hammond ii) JE said that he would contact directly.
+ NC 3. Pilot Search iii) Larry has advised he will wait for a decision on Bill
Hammond before contacting a pilot headhunter.
II
EFTA00577750
KINNERTON STREET
STATUS ITEM COMMENT
1. Apple Wireless Base Station i. Expected to be completed by 11 April.
12
EFTA00577751
ZORRO RANCH
STATUS ITEM COMMENT
4 Update 1. Pew i) Complete — pews have been painted.
+ Update 2. Security Gate ii) Installation of cameras has begun. Completion
expected end of April.
+ NC 3. Fountain iii) Additional more complete dimensions sent to Pascal
Correct quantity of tiles = 1,631 tiles.
Attached is the proposal, please advise.
+ JE plse advise Pascale gave JE pictures. Plse advise how to proceed.
+ NC 4. Plumbing in Shed. iv) Miller Bonded have completed their project until the
power is turned on in April/May.
4 NC 5. Building for RO ix) Ionics installation is scheduled for mid April.
+ I. pdate 6. MH Trees iv) Complete.
+ NC 7. 40 Ft Digital Screen xi) JE still to advise on proposal received from Larry
Jacobson for cinema and drive-in.
+ Update 8. Main House lutron system xii) Completed.
not working properly.
9. Repeaters for MH xiii) The repeaters would run approx. $4,000. The problem
Cellphone & Radio is running the cables through the walls.
Coverage Mike advised he is not capable of this. The first quote
13
EFTA00577752
STATUS ITEM COMMENT
received was $12k on the low end to as high as $20k if
they encountered problems. A company called
+ JE to advise JE Spectralink is putting together a bid.
to advise See attached quotation = $11,031.00.
+ Update 10. Repair crack in kitchen tiles xiv) Tiles will be completed by 21 April
+ NC 11. Water Rights xv) Shannon has received notice for the Dakota well
application from the Office of the State Engineer.
12. Phase Power/Water Well xvi) Approximately one half of the power line installation
has been completed.
13. "Z" to be lit up. xvii) Approval given. Special light was ordered to resist
wind. To be delivered 1St May.
14. Boulders xviii) Approval from JE given to shine the boulders from the
front. Awaiting quote.
14
EFTA00577753
LITTLE ST. JEFF'S
STATUS ITEM COMMENT
+ Update 1. Fixed Roof Yoga Deck i. Permits for Yoga deck, pool house, new house
(items 1, 10, 11, 14, 18 & 25 are building site, steam room etc. The principle architect
all pending on the same permit) running with this project is off island. Miles
understands that there has being no movement with
finalizing this project.
+ Update 2. Telephone system ii. Telephone system. The low audio is caused by static
and water in the lines and Vitelco, USVI cable and
telephone provider, is working on the problem. No
deadlines given.
+ NC 3. Flags from LA iii. Poles and flags have arrived and are on LSJ. JE to
+ JE to advise advise on placement.
+ Update 4. Sea Water Pump iv. Miles corrected the problem with pvc piping and some
couplings.
Pond Pump
+ Update 5. Large Beach House v. Full installation to be complete.
Electricity
+ NC 6. Maintenance & Storage Shed vi. Check received and passed onto FTC for depositing.
+ Update 7. Shotgun vii. Completed. Shotgun has been delivered.
+ Update 8. New House Building Site viii. Permits for Yoga deck, pool house, new house
building site, steam room etc. The principle architect
15
EFTA00577754
STATUS ITEM COMMENT
running with this project is off island. Miles
understands that there has being no movement with
finalizing this project.
+ NC 9. Cart Paths Reduce Grades ix. Awaiting lawyer's letter by end of April.
+ Update 10. Dock & Dock Lights x. Installation has begun. Expected completion 30
April.
xi. Pilings are in place. Moulds are on island and these
will be cast as soon as possible in the New Year.
xii. Project on hold until CCM permit inspection is
completed.
xiii. Once the new pilings are cast, the floating dock will be
re-built to fit between the hard dock and the new
pilings to provide a swimming platform.
+ NC Extra Pilings for Dock To be reconfigured as a permanent dock with
swim ladders, railings etc. This is due to happen
+ NC Floating Dock once the CCM permit inspection is complete.
+ NC 11. Plant Planters xiv. Supplier in Puerto Rico is awaiting stock of 42 inch
high pots were due late-Oct but delayed. The items
will be delivered as soon as they become available for
JE approval — no date available.
16
EFTA00577755
STATUS ITEM COMMENT
+ Update 12. Poolhouse by Existing Pool xv. Permits for Yoga deck, pool house, new house
building site, steam room etc. The principle architect
running with this project is off island. Miles
understands that there has being no movement with
finalizing this project.
• NC 13. Lamps & Lanterns xvi. JE has requested new lamps & lanterns be purchased.
GM to supply information & pictures.
+ JE plse advise 14. Main House Outside Lights xvii. JE to advise during visit.
Update 15. Steam Room xviii. Permits for Yoga deck, pool house, new house
building site, steam room etc. The principle architect
running with this project is off island. Miles
understands that there has being no movement with
finalizing this project.
) Update 16. Roll on/Roll off Truck xix. Items to purchase. Truck and bins are operational.
First bin is on island. Miles would like to propose a
full maintenance, storage and delivery proposal that
would cost $1600.00 per month but is setup to ensure
that the truck and bins are well looked after. The
proposal is with the company that provides us with
barging services. The monthly cost is on a par with the
previous bin provider when bin rental, barging,
storage, trucking to the dump etc is taken into
consideration. Please advise.
) L, pdate 17. Replace AC Units in Guest xx. JE approved = $6,585.00
Rooms Project will commence once the technicians have
17
EFTA00577756
STATUS ITEM COMMENT
completed the gym. The equipment is on island.
Estimate labor and material cost to remove and replace
ceilings $2200.
Update 18. New Development xxi. C Miller to provide update.
Beach entrance and new xxii. The road works are completed and await JE approval.
road to main house. Landscaping is subject to JE approval.
19. Tiles for Beach Hut xxiii. Tiles arrived are incorrect. Linda Pinto confirmed they
ordered the incorrect tiles. New tiles are now on order
and expected first week of March.
28. Update 20. Seamore, Nanna, Fat Cat & xxiv. Nanna - Is operational. Some cosmetic work remains
Lady G2 but should be completed today.
Fat Cat — is in St Thomas. Boscoe is currently
completing the installation of the exterior. Miles
believes that some work needs to be done to the interior
to strengthen one bulkhead and to make the interior
more cosmetically pleasing. Quote received is for $
6500 which includes all materials and labor. Please
advise.
Yamaha are not going to release a 300hp engine.
Mercury 300 CFI is now believed to be the best motor
on the market. Quote to replace Yamaha to Mercurys
given to JE awaiting approval.
28. Update Seamore - New engine will be transported by tropical
18
EFTA00577757
STATUS ITEM COMMENT
shipping. Miles will provide a full quote for installation
before project starts.
Lady G2 - Engine is repaired and the boat is back on
LSJ. Engine is not reliable but was repaired under
warranty. Larry is investigating and awaiting approval
for the purchase of a Johnston 4 stroke engine which
will replace the Mercury. Larry is purchasing a new
four stroke engine and should be available for shipment
28 Feb.
28. Update 21. New Office area below xxv. Permits for Yoga deck, pool house, new house
MBR building site, steam room etc. The principle architect
running with this project is off island. Miles
understands that there has being no movement with
finalizing this project.
28. Update 22. MBR Curtain Rod xxvi. Expected delivery 4 April.
Update 23. Grotto xxvii. Architects have not provided updates to Madison Cox
per last correspondence Miles received from Cox. C
Miller is working to get architects to respond.
NC 24. Great Room wind xxviii. JE requested that 4 panels be constructed to fit in the 4
Protection Panels arches to stop the wind and rain from entering the
patio on the South east portion of the room facing St.
John. Outside contractors have supplied a quote of
$36000.00 to complete this project as maintenance
staff too busy to complete. Miles believes that this
price is unacceptable and will look into other sources.
19
EFTA00577758
STATUS ITEM COMMENT
xxix. Sources are scarce at present but Miles will keep
looking, as quoted price is too expensive.
+ 25. Wildflowers Jasmine & xxx. Flowers. Gardenias are growing. Jasmines will be
+ NC Sweet Smelling Plants planted after the gym is completed.
+ NC 26. First Aid Training xxxi. American Red Cross will give 8 'A hour training
course on island covering CPR, digital defibrillator
and general first aid. Minimum of 10 people must
attend at a cost of $50.00 per person with $150.00
instructor fee. Two weeks notice required. Suggested
attendees: Miles, Boscoe, Bruce, Kurt and Trevor.
Kathy suggested 18 April, please advise.
+ NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold.
+ NC 28. Poly Pavement Dust xxxiii. Process on hold whilst gym is being erected. Miles
Prevention continues to spray roads with water to ease dust levels.
+ Update 29. Cushion Covers xxxiv. Completed. Cushions were picked up 21 March.
+ Update 30. Portable Water xxxv. Portable Water. Additional water requested by JE is in
ST Thomas and needs to be transported to the island.
This is due to happen next week.
+ Update 31. New Main House xxxvi. Linked to item 22.
Approach Road
+ Update 32. Stone work on Road Sides xxxvii. Complete
20
EFTA00577759
STATUS ITEM COMMENT
+ Update 33. Lights for New Road xxxviii. Complete.
+ Update 34. Lights for Master xxxix. Complete.
Bedroom
21
EFTA00577760
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3c032054-4b87-4227-9de8-64e9b23cd638
- Storage Key
- dataset_9/EFTA00577740.pdf
- Content Hash
- 66ea8c7c2b506add3a517f1705a7a77f
- Created
- Feb 3, 2026