EFTA02290368.pdf
dataset_11 pdf 80.8 KB • Feb 3, 2026 • 2 pages
To: Rich Kahn[
From: Daphne Wallace
Sent: Thur 6/13/2019 2:43:17 PM
Subject: Fwd: GSJ BARN BUILDING
I presume you spoke to Jeffrey.
He has been asking MG for this information.
Forwarded message
From: Jeffrey Boschulte
Date: Thu, Jun 13, 2019, 10:40 AM
Subject: Re: GSJ BARN BUILDING
To: LSJ Michael Glidden
Hi Mike/Daphne,
Regarding the barn building project, a selection needs to be made for the steel building
manufacturer. We cannot move foward with the design and permitting submission without the
steel strucure package from the manufacturer.
Thank you,
Jeffrey Boschulte, MA
CEO. Boschulte Architecture. LLC
✓ N
www.boschulte.com I Skype:
41-42 Kongens Gade, St. Thomas, VI 00803
Grate your *um email signature
From: Jeffrey Boschulte
Sent: Monday, June 10, 2019 5:11 PM
To LS1 Michael Glidden
Subject: G51 BARN BUILDING
Good day,
I was following up to see if a steel building manufacturer has been selected for the Barn Buidling
as yet, so that we can move forward with the design of this project.
EFTA_R1_01123712
EFTA02290368
Please let me know - thanks!
Jeffrey Boschulte, AIA
CEO. Boschulte Architecture. LLC
www.boschulte.com I Skype:
41-42 Kongens Gade, St. Thomas, VI 00803
EFTA_R1_01123713
EFTA02290369
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3bfb4b84-97d7-4890-80c3-7a09cf94bafd
- Storage Key
- dataset_11/EFTA02290368.pdf
- Content Hash
- 9775b31bd5cb3cb04f2dea1bb5ccce84
- Created
- Feb 3, 2026