From: "jeffrey E." <jeevacation@gmail.com>
To: Brice Gordon
Subject: Re: ZM Water Development Update
Date: Tue, 21 Nov 2017 21:58:29 +0000
price
On Tue, Nov 21, 2017 at 4:34 PM, Brice Gordon < > wrote:
Good afternoon
By 11/1/2019 the Ranch needs to apply 68 AFA from the Wells (2) under Permit E7871, as of date the Ranch has achieved 50% of this
amount.
The Attached map highlights in green the required 20 acres to be irrigated under Permit E7871. The terrain is undulating and sections
have been fenced.
To meet the conditions of the Permit, The Rmposed plan is to apply water to existing grass lands within the 20 acres for the grazing of
live stock.
Please note: OSE will inspect PBU/Lands, operation and infrastructure under Permit E7871,
The recommendation at this time its to use a Water Reel Irrigation System, it appear this system should be able to handle the terrain.
sI /Avww.waterreels.com/index2.ivnu.
This seems, the most logical and cost effective solution at this time.
The Ranch would need to Survey and Mow area to be irrigated.
Install a network of feeder pipes to different sections of the 20 acres to connect 2 water reel units
In the mean time I will continue to research other options and start compiling final cost associated with Stage 3, using a Water Reel
application.
Is this OK?
Regards Brice
On Fri, Nov 17, 2017 at 11:47 AM, jeffrey E. leevacationggmail.com> wrote:
suggestions?
On Fri, Nov 17, 2017 at 11:47 AM, Brice Gordon < wrote:
Good Morning
Attached photos for your reference:
1. On Site Fabrication & Installation of an Intake Screen for the Water coming from the Pond
to the Distribution Pumps has been completed
2. Upon JCH's recommendation a Waterfall has been Constructed at the Prevailing Wind
Corner of the Pond. This will assist in the Aeration of the Water. There maybe a need for
Floating Solar Powered Sprinklers in the future.
3. Compaction of Pond Sides & Base will be completed by the end of the week, this
obviously help with Water Retention
EFTA00950841
4. Engineering & Design (JCH) of New Pump Skid & Distribution of Water from the
Pond to the PBU (20 acres) is in process. Proposal will be forwarded once received
5. Filling of the Irrigation Pond will commence next week & will continue during the
Winter.
Transducer readings will be taken weekly to monitor water production vs demand.
6. The next stage is to Engineer a Solution to Irrigate the 20 acres under the permit
with the less amount of expenditure, but meeting the requirements of the OSE.
Regards Brice
Brice Gordon
Stanley, NM
Ph:
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
Stanley, NNI
PI::
please note
EFTA00950842
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00950843
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3bf6638f-48a1-439a-b8d8-99e5ec17a85a
- Storage Key
- dataset_9/EFTA00950841.pdf
- Content Hash
- a27b859031e9cff132d0ba28859ac7a3
- Created
- Feb 3, 2026