EFTA01113413.pdf
dataset_9 pdf 2.6 MB • Feb 3, 2026 • 10 pages
1310 Neptune Drive
Nutting Bea
: ch, Fl., 33426 FTBoyn. Ion
BORING NUMBER B-1
r ia
) Engineers eiephone PAGE 1 OF 1
Ttatheted k On Caren•••
PROJECT NUMBER 17015.2 —
CLIENT Labonte Construction PROJECT NAME 358 El Brill° Way
PROJECT LOCATION 368 El Brill° Way. Palm Beach. Florida
DATE STARTED 8/19/15 COMPLETED 8119115 SURFACE ELEVATION REFERENCE —2' above Road Crown
DRILLING METHOD Standard Penetration Boring GROUND WATER LEVELS:
LOGGED BY _7,
'1 e_t_t CHECKED BY C. Gworek VAT TIME OF DRILLING 5.0 ft
APPROXIMATE LOCATION OF BORING As located on site plan
• SM. N VALUE A
&LE TYPE
GRAPHIC
NUMBER
0 10 20 30 40
DEPTH
LOG
MATERIAL. DESCRIPTION O PL MC LL
Blows 1-41-I
lf 20 40 60 80
Z
13 PINKS CONTENT 090
I., t ‘ TOPSOIL 3" r 20 40 60 80
Gray fine SAND, trace root AU
Tan fine SAND
- - AU
2
...
•• SS 11.2.19•!9 21 A
3
SS 13.13.8.8
4 21 A
Gray One SAND
- - SS
6 5-6-4-5 10 •
10
6 I &own PEAT
. le ,n SS
a 4-6.5.13 13 •
vi k
,- "Ys LI
Uc g
,..,::.. Gray One SAND
X
55
T 9.11. 10.12 21 •
.
15 •:
8
~x _ . • SS
s 8 10.12.12.16 24 •
20 X
Bottom of hole at 20.0 feet.
2
Disclaimer Nutting EnginesoptFlo643.inc. scants no liability_for tho conmentwithe ind000ndont intennitation of drilliog has
by others
EFTA01113413
- LEGEND•
APPROX. TEST LOCATION
Labonte Construction
NUTTING 358 El Brillo Way APPROXIMATE
E NGINEERS 358 El Brillo Way TEST LOCATION GEOTECHNICAL EXPLORATION FIG. 1
OF FLORIDA. VW.
Palm Beach, Florida PLAN
ESTABLISHED1W
PROJECT NO. 17352.1
EFTA01113414
REPORT OF
GEOTECHNICAL EXPLORATION
PROPOSED RESIDENCE ADDITIONS AND RENOVATIONS
358 EL BRILLO WAY
PALM BEACH, FLORIDA
FOR
LABONTE CONSTRUCTION
4165 LINDEN AVENUE
PALM BEACH GARDENS, FLORIDA 33410
PREPARED BY
NUTTING ENGINEERS OF FLORIDA, INC.
1310 NEPTUNE DRIVE
BOYNTON BEACH, FLORIDA 33426
ORDER NO. 17025.2
AUGUST 2015
Geotechnical & Construction Materials
Nutting Engineering, Testing & Inspection
Environmental Services
Engineers
of Florida Inc.! Established 1967
Offices throughout the state ofFlorida
Your Project is Our Commitment
EFTA01113415
1310 Neptune Drive
Nutting Boynton Beach, Florida 33426
Toll Fret:
Engineers
of Florida Inc.' Established 1967
Fax:
Etrowara.
St. Lucie
Miami-Dade
Your Project Is Our Commitment
ta
ta
August 21, 2015
:35
76 Mr. Daniel Labonte
Labonte Construction
E 4165 Linden Avenue
o Palm Beach Gardens, Florida 33410
3 Phone Email:
Subject: Report of Geotechnical Exploration
o Proposed Residence Additions and Renovations
358 El Brillo Way
a Palm Beach, Florida
Dear Mr. Labonte:
the
57) Nutting Engineers of Florida, Inc. (NE), has performed a Geotechnical Exploration for
Beach,
proposed residence additions and renovations at the above referenced site in Palm
Florida. This exploration was performed in accordance with the verbal authorizati on to proceed
ch to
r.. provided by Labonte Construction dated August 13, 2015. This evaluation was performed
test locations which along with
develop information regarding subsurface conditions at specific
earthwork
proposed construction information provided was used to develop opinions regarding
our
c procedures and foundations for support of the proposed construction. This report presents
of this
findings and recommendations based upon the information examined at the time
76 evaluation.
r, PROJECT INFORMATION
renovations to the
We understand that plans include the construction of various additions and
along with some
existing residence. These may include some new interior and exterior footings
has been
load increases on some existing foundations. We also understand that some settlement
foundation s will
observed on some existing foundations; therefore some remediation to existing
condition to provide
also be performed. We understand that other engineers have reviewed this
provided
remediation recommendations. Plans pertaining to the proposed construction were not
used to support
at the time of this report. It is not known the type of foundation system that was
construction in the
the existing residence; however it has been brought to our attention that recent
.c area has required deep foundation support.
O
L9
OFFICES
Palm Beach
Miami-Dade
St. Lucie
EFTA01113416
NE should be notified in writing by the client of any changes in the proposed construction along
with a request to amend our foundation analysis and/or recommendations within this report as
appropriate.
GENERAL SUBSURFACE CONDITIONS
Soil Survey Maps
As part of the geotechnical exploration, we have reviewed available Soil Conservation Service
(SCS) survey maps for Palm Beach County. These SCS maps provide qualitative information
about potential general shallow soil conditions in the project vicinity. This information was
derived from approximately 6 ft. deep manual auger borings, aerial photo and surface feature
interpretation at some point in the past (mid 1980's to early 1970's). The SCS data may or may
not reflect actual current site conditions. A review of the Soil Survey for Palm Beach County
revealed that at the time the survey was conducted, the soils at the site were described as Arents-
Urban land complex. These soils are described as nearly level, somewhat poorly drained sandy
soils that were either dredged from nearby waterways or imported from other areas and used for
fill material. The areas could have possibly been previous organic marshes and swamps that were
filled with a heterogeneous overburden material for urban land use. We note that the soil surveys
were typically penetrated to a depth of approximately six feet.
Subsurface Exploration
NUTTING ENGINEERS OF FLORIDA, INC. performed one Standard Penetration Test (SPT) boring
(ASTM D-1586) to a depth of twenty feet, the limits of portable tripod equipment. We note that
additional test borings were proposed; however per the homeowner's specification and to greatly
limit the potential for damage to the existing landscaping, our office could only complete one test
boring. We note that this can affect our recommendations; therefore additional borings arc
recommended. The location of the test boring is indicated on the boring location plan presented
in the Appendix of this report. The boring location was identified in the field using approximate
methods; namely, a measuring wheel and available surface controls. As such the soil boring
location should be considered to be approximate.
We note that due to the potential for underground utilities at the test boring location the upper
four feet of the soil profile was manually cleared. Because of this, the relative density (N-Value)
of the upper four feet was not obtained.
Test Boring Results
In general, the test borings recorded a surface layer of topsoil underlain by loose to medium
dense gray to tan sand to a depth of ten feet. From ten to thirteen feet soft brown peat was
encountered. Below thirteen feet medium dense gray sand was encountered to a depth of twenty
feet, the maximum depth explored.
113 Nutting
Engineers
of Fbrlda Inc.' Estabisbed 1967
2
EFTA01113417
Note: Substantially different subsurface conditions may exist at other areas of the site. Buried
debris may or may not be identified or adequately delineated by soil borings. Test pit excavation
can provide more insight into such conditions and rock lithology if present. Such conditions may
be revealed during site development activities (e.g. proof rolling, utility & foundation excavation
activities) or other related activities. Should additional assurance be desired by the client, further
subsurface investigation could be performed.
Groundwater Information
The immediate groundwater level was measured at the boring locations at the time of drilling.
The groundwater level was encountered at approximately five feet below the existing ground
surface.
The immediate depth to groundwater measurements presented in this report may not provide a
reliable indication of stabilized or a more long term depth to groundwater at this site. Water
table elevations can vary dramatically with time through rainfall, droughts, storm events, flood
control activities, nearby surface water bodies, tidal activity, pumping and many other factors.
For these reasons, this immediate depth to water data should not be relied upon alone for project
design considerations.
ANALYSIS AND RECOMMENDATIONS
The limited test boring performed for the project suggests that a three foot stratum of son peat
soils is present at depths of ten to thirteen feet below the existing ground surface. Due to the
high compressive nature of the organic soils and limited information pertaining to the existing
residence and new construction, it is our recommendation that the new addition, and any other
new foundation construction be supported upon a deep foundation system.
Demucking/refilling was considered however, due to the dcpth of removal, the location of the
addition to existing foundations, and the level of the water table, this method does not appear to
be economically feasible. Driven, precast concrete piles were also considered however, the
vibrations transmitted during the installation of this type of pile could distress the existing
residence and nearby structures.
Due to the limited space available for construction equipment to access the areas, we have
provided recommendations for helical piers for support of the proposed construction. Other
alternatives are available including augercast piles or pin piles; however it is our opinion that
helical piers are the best alternative for this project.
The decision as to which foundation type will be best for this project will depend on
accessibility, cost, structural loading conditions, and other factors. We recommend that
discussions be held with us and other interested parties to determine the best alternative for this
project. The following sections present our recommendations for the foundation.
e
3e Engin
NuttingI
eershihed1967
oi aintitStab
3
EFTA01113418
Helical Piers: Helical Piers consist of a galvanized steel shaft with an eight-inch (can be
variable) plate on the bottom, called a helix. The shaft and helix are hydraulically augured into
the ground with a measured amount of torque. The torque used to install the helix can be
converted to the amount of weight that the pier can hold. Helical anchors can provide an
allowable compressive capacity of up to 15 tons when installed to competent material. Based on
the test boring performed and due to the soft peat layer, helical piers will need to be installed to
depths of approximately twenty feet or more below the existing ground surface. Due to the
limited amount and depth of test borings performed at the site, more accuratc pier depth
estimates cannot be provided at this time. If more accurate estimates are needed than our office
needs to be allowed to perform a test boring with truck mounted drilling equipment to a depth of
thirty to thirty-five feet.
This type of pile is generally used where accessibility is limited, and in small addition areas,
where only a few piles are needed. The shaft size and number of helices are variable and are
designed to meet the needs of each individual project, therefore, the structural loads, and
preliminary layout will need to be accomplished prior to determining the helical pier
configuration.
The installation of the pile system must be monitored by a representative of Nutting Engineers
on a full-time basis to verify that the engineering intent is accomplished.
GENERAL INFORMATION
Our client for this geotechnical evaluation was:
Mr. Daniel Labonte
Labonte Construction
4165 Linden Avenue
Palm Beach Gardens, Florida 33410
The contents of this report are for the exclusive use of the client and the client's design team for
this specific project exclusively. Information conveyed in this report shall not be used or relied
upon by other parties or for other projects without the expressed written consent of Nutting
Engineers of Florida, Inc. This report discusses geotechnical considerations for this site based
upon observed conditions and our understanding of proposed construction for foundation
support. Environmental issues including (but not limited to), soil and/or groundwater
contamination are beyond our scope of service for this project. As such, this report should not be
used or relied upon for evaluation of environmental issues.
Nulling
ri Engineers
3E
t of Florida Inc. I Established 7967
4
EFTA01113419
No pile shall have a tip elevation higher than the recommended elevation without first contacting
Nutting Engineers of Florida, Inc. in writing so that they may analyze any proposed changes. If
Nutting Engineers of Florida, Inc. is not contacted regarding a change in pile tip elevations (or
pile diameters) as indicated in this report, the geotechnical engineer/ piling contractor initiating
this change will be responsible for the redesigned pile capacity and performance.
Furthermore, if the tip elevation is raised, a pile load test shall be performed at that location
where the test borings indicate the least favorable conditions. If the pile design is changed
without our knowledge, Nutting Engineers of Florida, Inc. is no longer the geotechnical engineer
of record.
If conditions are encountered which are not consistent with the findings presented in this report,
or if proposed construction is moved from the location investigated, this office shall be notified
immediately so that the condition or change can be evaluated and appropriate action taken.
Excavations of five feet or more in depth should be sloped or shored in accordance with OSHA
and State of Florida requirements.
The Geotechnical Engineer warrants that the findings, recommendations, specifications, or
professional advice contained herein, have been presented after being prepared in accordance
with general accepted professional practice in the field of foundation engineering, soil mechanics
and engineering geology. No other warranties are implied or expressed.
We appreciate the opportunity to be of service on this project. If we can be of any further
assistance, or if you need additional information, please contact us at your convenience.
Sincerely,
NUTTING ENGINEERS OF FLORIDA, INC.
n
tar-
Christopher E. Gworek, P.E. Richard C. Wohlfarth, P.E. 050858
Senior Engineer Director of Engineering
Appendix: Boring Location Plan
Test Boring Result
Limitations of Liability
Soil Classification Criteria
REP IABONTE CONSTRUCTION 358 EL BRILLO WAY PB PIERS CEG
Nutting $
e Engineers
of Florida Inc. ' Established 1967
li iimmig)
lt
EFTA01113420
S0I1. AND ROCK CLASSIFICA'I'I0N CRITERIA
SAND/SILT CLAY/SILTY CIA\
II -VALUE RELATIVE N -VALUE UNCONFINED COMP.
f 0 PD DENSITY MED STRENGTH 010 CONSISTENCY
0-4 Very Loose <2 <0.25 v. Soft
5 10 Loose 2 - 4 0_25 - 0.50 Soft
II - 29 Medium 5- 8 0 50 - 1.00 Medium
30 - 49 Dense 9 - 15 1.00 2.00 Soft
>50 Vay dense 16 -30 100 - 4.00 v. Stiff
100 IleNISal >30 >4.00 Hard
ROCK
N -VALUE RELATIVE
(bPD HARDNESS ROCK CHARACTERISTICS
N:- 100 Hard to v. bold Local !Oa( lOtllUlliCMS vary in Ilan:loess from soft to rely hard within short vet li.
25<N< 100 Medium hard to hard cal and hotirental distances ard often contain vatic-al solution boles of 3 to 36
inch diameter to varying depths and honzotital solution fratmes Rock may be
5<N <25 Soft to medium hard brittle to split spoon impact, but more resistant to excavation.
PARTICLE SIZE DESCRIPTION MODIFIERS
Boulder >12 as. 0 - 5% Slight trace
Cobble 3 to 12 in. 6 10% Trace
Gravel 4.76 tam to 3 in. II - 20% Little
Sand 0.074 nun to 4.76 min 21 35% Some
Silt 0.005 mm to 0.074 nun >35% And
Clay <D005 rams
Group
Mai..0lvbon, Typical Range. tabs/Glory claniticelbin 41,64:0
Symbol.
.0 w.....uodo. as../.. 9....040'd (D..)1
u Gw C. • .—.0 realer Ulna 4:c w helmeted and3
7
-
; `
8
...int Wee a •4 liewi
4
-
D,„ D,,,ID,
i b2
• i ; o•••ty reeled Waal. r•••Ilond f •
• V .i or Het se•gro. all rodeskesnquinamanis la GW
• .. nibe•rob stilt p.m lbw
a ;
*
:4 8
Sky gong; oraniscrebsIN Alledwrg Fin 1*w 'A'
2 ° II ... i OW' I
1
Agana°
1; " I NX g tea el win...a More 'A' ie. ..i.• PA
_k 1 '6 *Wrenn .4 7 ... meek.
S g %kg I
I I it -- i 1 i ... ItOHM ,..".4,A, .... of
g ,,,,,_,,,,
<Non 'moo; ......-....3.cso
;
a 3
t a 4
GC
" ' kn. 9 6.si
a f 4
Aa•4044 0 liWils oboit W
II snow. Mon 7
Sa l "....h.
il
it,
wusgooemil ono., cant/ lands. I I I D (D f
&ninonI and3
li WV or eo lims C,, = --Monona. ilon 6;C, .. S
f
1 .-
13" MoD,
1
... p as slip , I
9 .1 Poorly goebd meas. Agee.*,
V NV meetly ell rolled.. ro4pborosols In SW
....N. ion. od so b.a.
• u iti. 11 1
. i II
I i
U. Jai ‘S. ...., neko. d al I V ill iii Moser° Aga. bil.ove 'A"
tee oe PI Ins mhos 4 Limits plesail h [Aga
wit Pt Irsertet.4 4 nu] 7 two
it 1 l i
IS i A .5,r forte° limn obairW
bee*IlUr ttttt enta..... •••
;
I 1 i
SC Geri wed; wat-itoralancl .? a. . WA Pa -w. *aril
of thel n -opa
inbrgosk alien/ n•r fr. onto.
J.. Ow. soy of dOY•T h” Kr, Ag
t g
a dent Sal Mt tlIght platikly
3 71
3 q deo of bye lo...on
1
C. otaincar.araver dal% nada.
F, Ai
b
Ain dkr den Seniar. a.
;
3 Goipmst an end nag. sit oar
ot i
ri ,0 of •••• plossirk,
Y
3
l Inoroot.. slis. 44e4446•1 44 illblebts•
cows floe bbulp a lay nab r ' :nn
• .1 a
1 13
i t
4071
144...14 den or wk plostgisy. la o'
t I t CH t
.. Mt ••4 C.I.
kt SI k
OTIVek Sit el ...a.... • Woh o
On • •• • •o so •• i. •11 ft I*
k **lit no* an
0.'"*" .
ill II Pads amlapbw kV.? work io• PloOkil Chad
l ulling
113 mincers
6.0.4•4
EFTA01113421
LIMITATIONS OF LIABLILITY
WARRANTY ANALYSIS AND RECOMMENDATIONS
We warranty that the services performed by Nutting The geotechnical report is prepared primarily to aid in the
Engineers of Florida, Inc. are conducted in a manner design of site work and structural foundations. Although
consistent with that level of care and skill ordinarily the information in the report is expected to be sufficient for
exercised by members of the profession in our area these purposes, it shall not be utilized to determine the
currently practicing under similar conditions at the time our cost of construction nor to stand alone as a construction
services were performed. No other warranties, specification. Contractors shall verify subsurface
expressed or implied, aro made. While the services of conditions as may be appropriate prior to undertaking
Nutting Engineers of Florida, Inc. are a valuable and subsurface work.
integral part of the design and construction teams, we do
not warrant, guarantee or insure the quality, Report recommendations are based primarily on data from
completeness, or satisfactory performance of designs, test borings made at the locations shown on the test
construction plans, specifications we have not prepared, boring reports. Soil variations commonly exist between
nor the ultimate performance of building site materials or boring locations. Such variations may not become evident
assembly/construction. until construction. Test pits sometimes provide valuable
supplemental information that derived from soil borings. If
SUBSURFACE EXPLORATION variations are then noted, the geotechnical engineer shall
be contacted in writing immediately so that field conditions
Subsurface exploration is normally accomplished by test can be examined and recommendations revised if
necessary.
borings; test pits are sometimes employed. The method of
determining the boring location and the surface elevation
at the boring is noted in the report. This Information is The geotechnical report states our understanding as to the
represented In the soil boring logs and/or a drawing. The location, dimensions and structural features proposed for
location and elevation of the borings should be considered the site. Any significant changes of the site
accurate only to the degree inherent with the method used improvements or site conditions must be
and may be approximate. communicated in writing to the geotechnical engineer
immediately so that the geotechnical analysis,
conclusions, and recommendations can be reviewed and
The soil boring log includes sampling information,
appropriately adjusted as necessary.
description of the materials recovered, approximate
depths of boundaries between soil and rock strata as
encountered and immediate depth to water data. The log CONSTRUCTION OBSERVATION
represents conditions recorded specifically at the location
where and when the boring was made. Site conditions Construction observation and testing is an important
may vary through time as will subsurface conditions. The element of geotechnical services. The geotechnical
boundaries between different soil strata as encountered engineer's field representative (G.E.F.R.) is the 'owner's
are indicated at specific depths; however, these depths representative" observing the work of the contractor,
are in fact approximate and dependent upon the frequency performing tests and reporting data from such tests and
of sampling, nature and consistency of the respective observations. The geotechnical engineer's field
strata. Substantial variation between soil borings may representative does not direct the contractor's
commonly exist in subsurface conditions. Water level construction means, methods, operations or
readings are made at the time and under conditions stated personnel. The G.E.F.R. does not interfere with the
on the boring logs. Water levels change with time, relationship between the owner and the contractor and,
precipitation, canal level, local well drawdown and other except as an observer, does not become a substitute
factors. Water level data provided on soil boring logs shall owner on site. The G.E.F.R. is responsible for his/her
not be relied upon for groundwater based design of safety, but has no responsibility for the safety of other
construction considerations. personnel at the site. The G.E.F.R. is an important
member of a team whose responsibility is to observe and
LABORATORY AND FIELD TESTS test the work being done and report to the owner whether
that work is being carried out in general conformance with
the plans and specifications. The endosed report may be
Tests are performed in general accordance with specific
relied upon solely by the named client.
ASTM Standards unless otherwise indicated. All criteria
included in a given ASTM Standard are not always
required and performed. Each test boring report Indicates
the measurements and data developed at each specific
test location.
Nutting
in ears
KIX PSI !IOW CariallUi
EFTA01113422
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 39c19e65-4830-4763-a7c8-7b51cd7fa1c4
- Storage Key
- dataset_9/EFTA01113413.pdf
- Content Hash
- f8c307d2a4400916d7c18395cafba669
- Created
- Feb 3, 2026