ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
DOCK
Floating Platform and Additional 2 steps per JE design have been added. Complete
Dock
GYM
Cement outside Tile to be installed outside gym to increase cement. JE to On Hold
supply drawing of area in order to start project. Per JE, on hold.
Dip and Chin Approved - Standing Body Masters. Ordered & expected in
Machine Miami by Dec 8 — then to ship to LSJ.
Stereo System installed. JE approved set-up / location / stereo while Miles 12/12
on site. Speaker cables to be hidden by Dec 12.
MAIN CURRENT HOUSE
Spot Lights Installed additional lights to illuminate terrace courtyard below Complete
Great Room.
Lanterns Lanterns in France for LSJ have been damaged in shipment — Pinto
Pinto advised that re-storing will be too expensive & lengthy in
time. They have been re-ordered — no delivery date yet.
Lights Lights that shine up & down to replace glass hurricane lamps Complete
located outside of the house. JE chose 6" diameter ones. Miles
hung. Please see attached photos. *A-1
Courtyard Lights Removed sample and reverted to original spot light. Complete
EFTA00577493
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
Courtyard Paint high gloss blue stripes 2" wide with 9" white squares in
between stripes. Paint small section first for JE to see &
approve. Photo to follow. If approved, completion by Dec 3.
Great Room 1. Screen installed. Projector faulty — has been mended in NY. Complete
Sound Experience has installed.
2. Ceiling fans extension poles reduced. Complete
3.1 amp to be installed.
4. Black out curtains for windows — black cloth to be draped
behind movie screen to create total darkness.
Christmas lights Christmas lights to be installed in large trees for the season. JE 12/16
advised to use Japanese lanterns in addition to Xmas lights.
1. Lanterns have been ordered & are expected in NY by Nov 29. 11/29
2. Xmas lights have been purchased & have been taken to LSJ
on Nov 21.
3. Lanterns from David Tang have arrived & will go to LSJ on
next trip.
Kitchen & Office Change double doors to single doors. Doors too heavy to act as Woodshop 12/11
Doors single door. The good-looking hinges are not sturdy enough.
Per JE, make up sample of double door for JE to view.
Kitchen Salamander Attempt by technician to install was unsuccessful — shelve Bruce White 11/14 12x'5
above stove to be reconfigured. Correct mounting brackets
received Nov 19 — installation by Dec 5.
2
EFTA00577494
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
Trellis Screen on External trellis around Great Room to enclose complete arches Complete
Terrace has been completed.
Bed Mattress Per JE, mattresses in Bedrooms 1 & 3 have been replaced. Complete
Picture Frame Per JE, additional picture frame for bedroom 1 to be made up Framer 11/26
locally. Framer is working off sample frame.
Flag Pole Generator Burnt out due to rain. Replacement part is $2000.00 including JE
shipping. JE to approve.
GUEST ROOMS
Bath Rooms All faucets to be changed to same as MBath — 5 sets ordered —
awaiting delivery dates.
MASTER BEDROOM
MBR Stairs Down to Top half of stairs completed. Complete
Beach
Shoe Rack 6 & 7 foot chrome shoe rack / metal shelving - more options GM / Pinto
being sourced.
Steam Room Doug is currently preparing a drawing to send to Miles. Miles Doug
advises that there are no local shower door companies on STT.
JE to advise how Miles should proceed. JE
Master Bedroom Bathroom fixtures: Bruce White
Bathroom 1 — Waterworks sink faucets: have been installed. Complete
2 — Grohe shower fixtures: 1 of 9 pieces has been taken to LSJ
3
EFTA00577495
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
on Nov 21. The remaining 8 shipped by manufacturer to LSJ on
Nov 24.
3 — Czech & Speake bath fixtures were special-ordered & are
expected at 65th St by Dec 3.
Bathroom Door Self-closing hinge installed on MBR toilet door. Complete
Floating Dock Miles spoke to Larry V & they suggest that since it has been JE on site
difficult to find a manufacturer that supplies docks that can
withstand saltwater conditions, the best alternative is to have
one built in the same fashion as the jet ski dock, a floating
modular system. JE to advise if to proceed once the jet ski dock
has been received & assembled & JE has viewed it. Alternative
source of floating dock sent to JE.
Hot Water Replaced elements and thermostats. Complete
Dressing Room 2 floor lights to be moved from bedroom into dressing room. JE JE
Lights to source & buy 2 new lights for bedroom.
LANDSCAPING / IRRIGATION
Gym planting area Coconut and flamboyant trees have been planted in areas Complete
marked by JE. Per JE, marked areas replanted.
Wall — Old Heli Pad Construction of the wall to hide old helicopter pad & Coconut Complete
tree planting on the inside of wall are complete.
Coconut Trees Approved - 50 trees have been planted. Complete
4
EFTA00577496
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
New Entrance Road Coconut trees planted on hill to hide sea and engineering view. Complete
Per JE, statue has been moved & marked areas replanted. Complete
Please see attached photo. *A-2
Big Trees Approved - 100 trees. 32 planted. JE advises that the balance Matt
must be purchased and planted in same area to create one area Mahaffey
of color. (Miles sd that he was not sure now whether he should On hold
buy the trees as apparently JE sd that the whole area needs to be
designed by Madison Cox to achieve a structured terrace look).
The area is also possible site for orchard. Per JE, on hold.
Fniit Tree Orchard Madison has forwarded to Matt all information re: selected fruit Madison /
trees, planting site, orchard layout & future maintenance. Matt Matt
felt that the list was not varied enough — he wants to add Mahaffey
pineapples, cinnamon trees, & more. JE approved list. Matt to On hold
liaison with MC to purchase. Per JE, on hold.
Gabion Baskets Approved - Gabion Baskets - 20 each of each of two sizes have
been ordered.
Main Beach Entrance Main beach entrance has been reworked per F Goffinette's plan. Complete
Per JE, marked areas have been replanted.
Great Room St. John Per JE, coconut trees to be relocated — completion by Dec 5. 12/5
View
Iguana Intersection Rock wall to be extended 20 feet on both sides & lowered — 12/5
expected completion by Dec 5.
5
EFTA00577497
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
Helipad 1. All bush & grass to be pruned / cut & 11/26
2. Oleander plants to be repositioned. 11/26
3. "Dog cemetery-like plants" to be removed. 11/26
POOL
Rock at Swimming 1. Madison drawing sent in Oct 3 report.
Pool 2. Rock top has been lowered. Complete
3. Rock wall has been leveled with flat stones. Complete
4. Plexi-glass screen erected — upper wooden bracket removed. Complete
Please see attached photo. *A-3
5. Stone threshold to be built between pillars by Dec 5. 12/5
Pool Terrace Pergola Madison submitted shading options:
1. JE has declined Madison's estimates of sample shading
devices.
2. Madison shipped Bamboo sample panels to LSJ but were
rejected by JE as JE does not think bamboo is suitable.
JE to advise next action. .1 L
Pool steps Rubber strips to be put on pool steps. Miles contacted pool 12/5
supplier in STT to source & provide information by Dec 5
Windscreen 1. Windscreen was moved behind plants. Complete
2. Matt to replant area with colorful plants by Dec 5. Matt 12/5
Seat in Rock 1. Bimini to be built with chrome or polished aluminum poles to JE
cover seating area. Miles does not understand what JE wants so
requests drawing to give to someone to make. JE to advise.
6
EFTA00577498
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
2. Rock seating needs to be re-covered & fabric needs to be GM
purchased — can be made on LSJ. GM to purchase.
BEACH
Tiki House Thatch Replacement thatch on LSJ — to be installed by Dec 19. Woodshop 12/19
Security Lights Large temporary diesel-powered lighting system - 2 light towers 12/5
ordered & expected in STT by Dec 5. Cost of each is $6,825.
NANNA
4 Stroke Engines JE advised to wait until Jan. On hold
Upgrade and Repairs Nanna is in the water. Boscoe 12/19
Requires minor electrical upgrade to repair the wires to the In progress
radar & horns. In progress.
Cabin area broken/fiberglass cracked for no apparent reason. JE
advises repair as soon as possible as Boscoe reports damage is
serious. Nanna hauled out at LSJ. Fiberglass repaired.
Aluminum panel cut and sent to be powder-coated red, per JE.
Re-carpeting will commence once boat operational.
Hi-Fi Speakers Replace speakers as necessary. Boscoe 11/17
Cover Approved - $3500 for full storage cover for Nanna - to be used Boscoe 1/31
for protection between visits. FYI: the cover has a 2 month
delivery time — expected completion in late Jan.
7
EFTA00577499
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
SEAMORE
Listing Seamore for sale at $250,000.00. Seamore has been listed in St. Boscoe Complete
Thomas Yacht Sales books. No interest shown in boat to date.
CALYPSO
Calypso Boat JE advised to re-cover seats in red & redo bottom paint. Boscoe
Approved - $2475 to re-cover seats. Deposit delivered to
builder Nov 19. All wood backing material sent to supplier to
be upholstered.
Bottom paint to be redone once Nanna back in water.
JET SKI
Jet Ski Clips JE to view current 3 inch jet ski clips that hold jet skis in place JE on site
on next visit & advise if he prefers larger ones.
Jet Ski JE approved one jet ski - $10,250 — jet ski on LSJ. Cover Complete
delivered. Trailer on LSJ. Floating dock for jet ski is complete.
CART PATHS
Slip Road to Gym 1. New road to the gym has been cut, stone work around Complete
triangle completed & cactus garden planted. Coconut trees
planted in triangle.
2. Stone walls in that area reworked to make them similar to the Complete
new walls.
Approach Road to 1. Width of road near the gym entrance reduced. Combined Complete
Gym with slip road to gym/helipad. Rebuilt road to helipad.
8
EFTA00577500
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
2. Per JE, stonework to continue to link up with the intersection. Miles 11/28 12/5
In progress. In progress
3. Statue has been moved & area replanted. Please see attached Complete
photo. *A-2
NEW BUILDING SITES
Cactus Clearing Approved - 3 guys hired to do cactus removal until the job is Matt
done. Estimate 2 to 3 months to complete initial phase of Ongoing
project.
Red Shed 1. Create path and move Red Shed to new position as marked by Complete
JE has been completed.
2. Approved - $392.90 for solar powered extractor fan. Ordered
& expected in PB by Nov. 24.
Cleared Area Seeding Cleared area has been seeded. Complete
Deer JE advised Miles to dart deer & move them to Great St. James. Matt 12/12
Guns and darts on LSJ, no tranquilizer. Matt has contacted
local vet to provide tranquilizer. Vet to be on site to supervise -
project to be completed by Dec 12.
Surveyor Moseley on island Oct 30 & surveyed points marked by JE and
Khan. Results have been emailed to architect and JE.
JE requested additional contour lines to be surveyed as marked Mosely 12/5
on plans — expected completion by Dec 5.
Marking Poles JE requested 100 4-ft rebar poles & 30 x 10 ft white pvc poles Bruce 11/26
with spray paint & tape.
9
EFTA00577501
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
TECHNOLOGY/
MISC
Digital Phone System Marc spoke to Steve Scully & Scully says there are still some Scully
extensions that are analog (only on the voice side, data is all
digital). As of Nov 18, Vitel Co claims there is a problem in
converting channel banks to all digital. Scully looking into
taking Vitel Co to the Public Works Commission to force them
to convert to all digital. Update to follow.
Generators 1. Approved - new generator on LSJ. Installation to be linked to Boscoe / 12/31
upgrade of electrical panel. Miles / M.
Glidden
2. Upgrading exiting panel from 300 amps to 600 amps — JE M Glidden /
approved M Glidden quote. Installation date to be determined Rich
once Glidden informs Rich of time frame for receiving panel &
installing so as not to interfere with JE's Christmas plans.
Curtains — Beach New white gauze fabric delivered to Fabric Mill on St. John to 12/26
Office make up curtains - will not be completed until after Christmas.
Chaise Lounge / Chaise Lounge - Pinto to decide on furniture.
Furniture — MH
Plastic Pots Approved -10 pots from Conran shop purchased. Conran shop 12/12
made a mistake and thought the pots were in the US when they
were ordered - they are still in Italy — expected by Dec 12.
Redecoration Wicker furniture options — Pinto. Pinto
10
EFTA00577502
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
Radio on LSJ for St. Approved - installation of St. John Rescue radio in a building on P Hoffinan /
John Rescue LSJ. St. John
Hoffman & Darren have reviewed the SJR agreement for Rescue
liability issues & forwarded to St. John Rescue for signature.
Per P Hoffman Nov 18, signed agreement sent to Darren.
Island Grill Viking Grill: Doug has specs so that he can draw it up — and Doug
give it to Miles to have a price quote for building it
Light House Architect is in the process of drawing up blueprints. He was JE
told that the light house would be erected on solid rock & does
not require soil borings anymore. Please see attached proposal
& estimate. JE to advise.
Bunk Beds JE to advise which bunk beds to purchase. On hold until after On Hold
New Year.
Underwater Lights Per JE, Miles to source alternative lights. Miles
Miscellaneous According to the VI Environmental Protection Agency, LSJ has
no Discharge Permit & the present Intake Permit is incomplete.
EPA has requested that LSJ reapply for both permits ASAP.
The application forms were hand-delivered to P Hoffinan's
office. P Hoffman (Oct 29) sd he will teleconference with
P Gandy & Amy Dempsey week of Nov 10 re: the applications.
Per P. Hoffman Nov 18 - no update.
11
EFTA00577503
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
Think Cars Larry is researching if any are available in Europe. Larry
Pool Cushions / Pool cushions & lawn furniture are on LSJ. Complete
Lawn Furniture
Dobermans Per JE, training to be conducted on LSJ. Initial training GM /
completed. Trainer requests up to two more sessions to
complete - to occur between JE visits.
GM TO PROGRESS
1. Buy more incense.
Please advise how GM and should progress...
1. Master bedroom shower and bath light.
2. Master bedroom carpet/bathmats.
3. Outdoor lights for bedrooms/buildings
4. Master bedroom wall sconces.
ARCHITECT
Shade House Bill Karr to look at shade house. Karr
Giant terrace Bill Karr to look at giant terrace. Karr
12
EFTA00577504
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
NEXT DATE REVISED
LOCATION COMMENT
ACTION BY BY DATE
ITEMS KRAUS-MANNING WAS RESPOSIBLE FOR
JE to advise how he wishes the following items previously JE
handled by K-M to be handled from this point forward. Last
accessible report from K-M from Aug 29 sent in Oct 3 report.
1. Solar Power/ Wind Power for huts
2. Fat Cat stairs
3. Media House location
4. Swim deck
5. Underwater lights
6. Dock house
7. Great room terracing
8. Renovation of VIP guest quarters
9. Security lights
10. Grotto
11. Pirelli-Jacobs contract
12. WAPA agreements
13. Redesign woodshop & vehicle storage shed
14. New Power plant / fuel storage facility
15. RO & WWTP
16. Corp of engineers
17. Permitting plan
18. Design management: civil, structural, and mechanical,
electrical & plumbing engineers.
13
EFTA00577505
ESTATE PROGRESS REPORT — November 28, 2003
LSJ
FOR GM EYES ONLY
LSJ
MISCELLANEOUS
Tiki House Two arm chairs and foot stools - awaiting quotes to recover. GM /
Fabric? JEE attached quote.
Yellow House Headboard in St. John for covering. Completed and returned to Complete
LSJ.
Beach Office Fabric for curtains being made up in St. John. Price $440.00. 12/26
14
EFTA00577506
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 397cb89e-b17d-47fa-97a1-366bb578aacc
- Storage Key
- dataset_9/EFTA00577493.pdf
- Content Hash
- 59a747905e5f293f4131bdbf931488a7
- Created
- Feb 3, 2026