EFTA00591435.pdf
dataset_9 pdf 573.9 KB • Feb 3, 2026 • 4 pages
LSJ, LLC
Date of Request: 24 March 2009
Requested By: W. Rowles
Time Frame for Purchase/Repair:
Urgent:OX Inventory: CI Other: ❑
Item/Items Requested: 100 ton of Colombian sand
Purpose/Description: Misc. Island concrete, Mechanical Building Concrete
Company Name: Heavy Materials
Website or Special Purchase Instructions:
Purchase Price: 100 ton @ 570.00 per ton = 57,000.00 cAff
k 0-1I fr-= id/ kg
Tax:
Shipping Cost: (Attach Quote) 5 Trips @ 5190 = 5950.00 Ship Via:
Other: Trucking 5 Trips @ 5270 = 51,350.00 Sit Kt -
Total Expected Cost: 59,300.00
Vibe/
Deposit Required?Yes:Ell or % No:DX
Payment Method:
House Acct, to be billed: X Check: Wire Transfer:
Credit Card of Requester: LSJ Company Card:
Quote Attached: Yes:CI No:EIX
Competitive Quotes Obtained? Yes: 0 No:DX
If No, Why Not:
Island supplier
Authorization:
EFTA00591435
LSJ, LLC
Date of Request: 24 March 2009
Requested By: W. Rowles
Time Frame for Purchase/Repair:
Urgent:OX Inventory: O Other: O
Item/Items Requested: 200 +/- ton of stone
Purpose/Description: Misc. Island Concrete. Mechanical Building Concrete
Company Name: Heavy Materials
Website or Special Purchase Instructions:
Purchase Price: 200 ton @ $33.00 per ton = $6,600.00 0-f-fu-t-val 4-44 u t-• /4109
Tax:
Shipping Cost: (Attach Quote) 8 trips @ $190 = $1,520.00'1 Ship Via:
Other: Trucking 8 trips @ $270.00 = $2,160 00 41U kr,
510,280.00
/NO 9
Total Expected Cost:
Deposit Required?Yes:CI s or % No: OX
Payment Method:
House Acct, to be billed: X Check: Wire Transfer:
Credit Card of Requester: LSJ Company Card:
Quote Attached: Yes:O No: I:IX
Competitive Quotes Obtained? Yes: O No:DX
If No, Why Not:
Island supplier
Authorization:
EFTA00591436
1.SJ, 1.1-C
Date of Request: 24 March 2009
Requested By: W. Rowles
Time Frame for Purchase/Repair:
Urgent:CIX Inventory: 0 Other: 0
Item/Items Requested: 100 ton of Manufactured sand
Purpose/Description: Misc. Island Concrete, Mechanical Building Concrete
Company Name: Heavy Materials
Website or Special Purchase Instructions:
Purchase Price: 100 ton @ $42.50 per ton = $4,250.00 nitf"-P-v-44 4 `6" -Eg 1////0 9
Tax:
Shipping Cost: (Attach Quote) 5 Trips @ 5190 = $950.001Ship Via:
Other: Trucking 5 Trips @ $270 = $1,350.00- -0-p-e4,49 dria ok
Total Expected Cost: 56,550.00 )09
Deposit Required?Yes:O $ or % No:CIX
Payment Method:
House Acct, to be billed: X Check: Wire Transfer:
Credit Card of Requester: LSJ Company Card:
Quote Attached: Yes:CI No:OX
Competitive Quotes Obtained? Yes: 0 No:DX
If No. Why Not:
Island supplier
Authorization:
EFTA00591437
Emad Hanna
From: Curtis Royston
Sent: Wednesday, April 01, 2009 10:26 AM
To: Daphne Wallace Emad Hanna; Monique Harry
Subject: FW: FW: Aprovaltil LlatiGitittF111(11
Please order materials
From: Jeffrey Epstein [malltoleevacation@imail.com]
Sent: Wednesday, April 01, 2009 8:56 AM
To: Curtis Royston
Subject: Re: FW: Aproval of concrete materials
ok
On Wed, Apr I, 2OO9 at 9:55 AM, Cunis Royston wrote:
NEED THIS STUFF -
From: Curtis Royston
Sent: Monday, March 30.2009 1:29 PM
To: Jeffrey Epstein
Subject: Aproval of concrete materials
Jeffrey.
Please approve for Concrete Mix -- Total S17,850
Stone - S6.600
Manufactured sand - S4.250
Columbian sand — $7.000
This is for Island Projects & Mechanical Building
Thank you.
EFTA00591438
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 360532a9-f655-4433-9f32-01d2da51d1e2
- Storage Key
- dataset_9/EFTA00591435.pdf
- Content Hash
- dbfb26086e528218405f0a57ebddd6ef
- Created
- Feb 3, 2026