From: Larry Visoski a
Sent: Saturday, March 17, 2018 2:00 AM
To: Je vacation
Cc: Rich Kahn
Subject: Fwd: N120.1E GIV entrance veneer
Pete and I had cabin crafters from Teterbor= give a quote in reference to the entrance veneer and Aft side cabin door o=
the GIV
1-Plane Perfect interior in PBI quoted $23k for entra=ce Venere forward and aft and aft side of cabin door, new veneer.,
2-Cabin craters quoted $20,060.98 for entrance Venere=forward and aft only, they quoted to install a chrome metal
plate around th= door handle, they did not quote veneer on the aft side of c=binet door as I requested.
3-need quote from Eric R=th if you elect to have him work the GIV veneer.,
= week lead time for the veneer according to Cabin Crafters in Teterboro.&nb=p;
Sent from my iPhone
Begin forwarded message:
=b>From: Pete Rawson
Date: March 16, 2018 at 9:38:20 PM=EDT
To:
Subject:
Pete Rawson
Chief Inspector
Meridian Jet Center
Begin forwarded message:
From: Wendy
Date: March 16, 2018 at 2:20:44 PM EDT
To: "Pete Rawson
Subject: N1201E
EFTA_R1_01632285
EFTA02503476
Good afternoon Pete,
Please find below estimate; give me a call with any q=estions.
FWD and AFT MED Bulkheads =/span>
* &nbs=; Remove the FWD and AFT MED bulkheads.
* &nbs=; Disassemble the Components, remove all Hardware (Latches, Hinges, and=Tracks etc.) from
Woodwork and retain for re-use. All components will=be inspected. Any Hardware Damage will be reported to the
Customer prior to repairing o= replacement. All repairs or replacement will be performed on a "Time and Mater=al"
basis.
* &nbs=; Strip and remove existing veneer and replace with new.
Q The veneer will be stained to match existing veneer in a/c using a cu=tomer-approved color. (NOTE:
CCI CANNOT guarantee that new veneer will be an e=act match in grain or color to existing veneer. Woodwork is a
natural mater=al and has variances in both grain configuration and stain acceptance. = Wood is susceptible to change
over time prompted by exposure to light, heat and other elements.)
* &nbs=; Re-finish all surfaces using a polyurethane high-build controlled met=od. Final coat will be
gloss finish.
* &nbs=; Re-assemble all components and re-install all removed hardware. =
* &nbs=; Re-install the bulkheads.
=o:p>
Estimated Labor &nb=p; $ 15,440.00
Estimated Material &=bsp; $ 3,720.96
Certification &n=sp; 4 900.00
TOTAL &n=sp; =nbsp; $ 20,060.96
=o:p>
=o:p>
2
EFTA_R1_01632286
EFTA02503477
Cabin Door
• &nbs=; Remove the cabin door.
• &nbs=; Fabricate and install an aluminum plate to conceal damaged veneer aro=nd door knob.
* &nbs=; Re-assemble door and re-install door knob.
* &nbs=; Re-install door.
=o:p>
Estimated Labor and Material &nb=p; $ 902.00
SCHEDULING
We will offer a turn t=me to meet your individual needs and will be ready to work around the Aircr=ft
Flight Schedule. We estimate a lead-time of "2 WEEKS" will be required to order and receiv= materials, prepare our
shops and prepare related documentation at this tin-I.. Final parts lead-time will be confirmed upon our receipt of a
signe= proposal.
DOWNTIME=/b>
We will require a total of "10 Working Days" from the scheduled start dat= to accomplish the work as
defined in this proposal.
</=pan>
=o:p>
=/p>
Wendy Pimentel
Sales Manager
3
EFTA_R1_01632287
EFTA02503478
ISO 9001:2015 and AS9100D Certif=ed
4
EFTA_R1_01632288
EFTA02503479
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 3453cb7b-6c36-4fe5-8c56-d6b85c7e3b62
- Storage Key
- dataset_11/EFTA02503476.pdf
- Content Hash
- 530abfe4168b9c6820731f0851a8852c
- Created
- Feb 3, 2026