EFTA00586474.pdf
dataset_9 pdf 104.5 KB • Feb 3, 2026 • 2 pages
Status Report for Zorro Ranch
Items Attached:
Attached are items for review that 1) have been submitted and need immediate direction,
2) that are waiting approval with questions, and 3) a proposed budget and capital
improvements with amounts to be determined for 2014.
Review:
The size; numerous areas, structures, systems, animals and people of the ranch make it a
proverbial a small town unto itself. And, this majestic ranch property is being brought
back to a high standard in all aspects and being well maintained by the current ranch
management.
The current ranch management is seasoned, very competent, loyal, and committed to
fulfilling the Principal's desires and to bringing the ranch back to the high standard in all
aspects and maintaining it. They have hired and trained new staff over the past year
which has brought more skill sets to the ranch. The new staff are hard workers, have
taken to the training, and are working very well as team. They are enthusiastic.
Service structure for bringing back high standard has been put back in place by the ranch
management team in the areas of administration, housekeeping, clothing care, culinary
preferences, entertainment, maintenance, grounds keeping, travel and transportation, and
any safety and security measures desired by the Principal. With the new staff, proper
direction has been and is being given by the ranch management team to create and
maintain both required individual responsibilities and group for outside and inside service
environments of the ranch. The ranch management as well is hands on and leads by
example.
Service manuals will be updated to reflect new staff and duties.
EFTA00586474
Recommendations:
Because of the size and scope of this property, and because there is a seasoned team
actually managing it, recommend working from an annual budget (to be reviewed
quarterly) as part of standard operating procedures to create a point of reference and
management structure needed for onsite Managers and Director of Residences.
Recommend for consideration continuing the ranch's onsite, ongoing maintenance such
as mechanical/ landscaping, etc. to service contracts for proper upkeep for your
enjoyment and to maintain the high standard you desire.
Recommend considering other new designated staff members, Carlos & Cynthia, to be
able to assist in purchases, especially WHEN Principle and/or guests are on site.
Recommend considering ranch management having to authority to spend up to $3000 for
emergency and necessary items (not to exceed total amount budgeted and to be tracked)
such as vehicle items and maintenance, smaller mechanical items and maintenance, etc.
Recommend for consideration that if ranch management is required to still report on
every expense (if budget is approved), then payments approved are made in timely
manner by NYC accounting and timely notice is provided consistently back to ranch
management of said payments made.
Recommend current licensed mechanical engineer on staff, or another licensed
mechanical engineer with requisite experience and expertise in this location, to create
mechanical related SOP's for all systems for this property, trouble shoot as needed, and
inspect bi annually (should do for each of your properties).
Recommend the hiring of one additional employee seasonally to assist with low level
duties so existing staff may assist with more demanding seasonal duties.
EFTA00586475
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 2f7c5dc3-2312-4525-8507-33568d612932
- Storage Key
- dataset_9/EFTA00586474.pdf
- Content Hash
- 34158c97c34fee291a6f5bd7085566e9
- Created
- Feb 3, 2026