August 1, 2018
Cecile:
We have decided to keep you and other tenants informed on the ongoing construction of the property. We are
excited to make AYH the talk of Red Hook with the many changes people are seeing daily, so I personally wanted
to share with you the ongoing project list here at AYH. I also wanted you know that so many tenants have
approached me on the color of the building as well as the roof and they are not only excited with color chosen,
but very excited about the new and updated look of the building.
MARINA
1. Decking
a. C Dock 4 white perimeter remains to be completed
b. Boardwalk — commencing when contractor is next available
2. Pedestals
a. Remaining pedestals — 11 pedestals remain between D/E docks
3. Fuel Dock
a. Power
i. Conduit run — need to dig trench & run lines — commencing this week
b. Office Rebuild
i. Building scope to quote redoing fuel dock office
4. Mooring piles — obtaining quotes this week
5. Gates & Fencing
a. To commence post from YHG Fence commencement — est. 4 weeks
6. Access Controls — obtaining quotes this week
7. Marina Office Decor —scope being researched and quoted this week
6100 Red Hook Quarters #2, St Thomas, USVI 00802
Phone (340) 775-6454 Fax (340) 776-5970
EFTA00803917
8. Marina signage — new signage on order for docks
UPLAND
9. Roof — estimated completion Week of September 161h
a. Completing road side of building; moving to "U" shape section (ST)
b. Material to complete water side on island 13th
10. Paint
a. Work commenced — demo wall painted
b. Caulking Buildings B & C
11. Exterior repairs — JPK got new crew
i. Commenced on building F
ii. Punch list established for all buildings
12. Building
a. Separation of floors
i. Final drawing — Monday 8/6th
b. Hurricane Shutters (roll down) — quotes received
c. Above & Below to pop tiles — quotes received
13. Bridge between Building C & D — Above & Below to repair
a. Scope — rip up concrete, replace & secure steel decking, pour new concrete & install tiles
14. Tile Repair
a. Building A, B, C & E — Address all broken tile issues
15. Vacant Spaces — Interior Work
a. All drywall up, trim up
b. Separate electrical
c. HVAC - quotes pending
16. Lighting
OIVU neu noun Willi lel S XL, .St I I WI IldS, U3V I VUOUL
Phone (340) 775-6454 Fax (340) 776.5970
EFTA00803918
a. Sconce
i. Lights up —4 were not installed — Hughes installing this week
b. Parking lot
i. Materials coming within 2 weeks
c. Recessed lighting
i. Hughes to troubleshoot this week
17. Generator
a. Having painter sand/paint
b. Research underway to procure a 2n0 unit for additional facility coverage during power
outages...electricians have been engaged to assist
18. Shutters — seeking another contractor
a. .IPK getting quote per set
i. To-do 4 sets new doors on buildings D & E
ii. Repair 8 doors on B, C, D & E
iii. Painting of all buildings commenced...once colors are approved it will take 2 months to
complete full facility
19. Doors & Windows
a. Glass 2000 proposal coming today — materials only
i. Lead time 6 weeks
b. Pro-Glass lead time 8 weeks
20. New transformer
a. Franks Electric to acquire & install
b. 4 weeks out
21. Flag Pole
a. Ordered
22. Railings
a. Behind Pesce — on island
b. Building D — need to order
6100 Red Hook Quarters #2, St Thomas, USVI 00802
Phone (340) 775-6454 Fax (340) 776-5970
EFTA00803919
23. Tiles by bathroom back of Pesce — sourcing correct tiles
24. Parking lot paving
a. Above & Below — obtaining quotes over next 2 weeks
25. Stairwell: Regular power-washing...next on Thursday. Bid received to repair/replace entire stairwell in
the next few months received.
26. Garage Ceiling Tiles: Bid received from DCM Corp. to replace...waiting on new lighting quote to combine
complete scope for approval.
27. Parking Lot — bid received for new parking stops...awaiting approval
28. Public Spaces Furniture — old/damaged furniture removed, and quote obtained for complete overhaul
29. Marina Tender — possible replacement craft being researched for execution before winter season
30. C-dock and Marlin deck — poles to be removed and replaced with oversized planters for better entrance
way
Finally, unfortunately the sargassum has returned to the marina. I have spoken to your team that we have
investigated removal of this, and it runs about 2k a day, furthermore there is no guarantee of it not returning
and after serval discussions we think it is best for nature to run its course since once removed more will roll in.
If you have any questions or concerns, please don't hesitate to contact me via email or cell. My door is always
open.
Regards,
piA, 125batottx
Beth DiDomenico
General Manager
6100 Red Hook Quarters #2, St Thomas, USVI 00802
Phone (340) 775-6454 Fax (340) 776-5970
EFTA00803920
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 2efc7f66-6e57-4f0b-b213-1fd14eb91190
- Storage Key
- dataset_9/EFTA00803917.pdf
- Content Hash
- 85d5feaadd18b4896c5c5f48839be8e1
- Created
- Feb 3, 2026