Epstein Files

EFTA01124871.pdf

dataset_9 pdf 53.3 KB Feb 3, 2026 1 pages
RMC Electric-Randy Morales P 0 Box 10645 Albuquerque NM 87184 Phone: 505-342-0800 Fax: 505-342-0811 Estimate/Bid June 18, 2012 Ann: Brice To: Zorro Ranch Job: Well K Estimate 1) 300ft of 2" PVC 202.00 2) 2-2" LB 20/ea 40.00 3) 1- 2 pole, 100 amp breaker 150.00 4) 1- 100 amp main breaker indoor panel 200.00 5) 3- 300ft runs of 1/0 copper Thhn wire 2,750.00 6) 1- 300ft run #2 copper Thhn ground 360.00 7) Miscellaneous fittings 250.00 Materials 3,952.00 Labor 3,560.00 $7,512.00 Note: 1) Digging for 100amp circuit from meter to well is excluded from price 2) Well control wiring not included in price Option 1) If 480volt, 3 phase motor is used, add this amount to above price 20HP 3 sub add-a-phase 9,300.00 Labor & materials to install 900.00 Must be within 10ft of well motor starter Freight cost will be added to price and is to be determined Option 2) 480 Volt single phase 1) One 250 amp, 480 volt single phase panel 300.00 2) One 250 amp main breaker kit 260.00 3) One 75KVAA step up transformer 240 to 480 3,050.00 4) Miscellaneous material to install transformer and connect to well motor starter 390.00 5) Labor to install and connect 900.00 Change orders will apply if extra work is needed varying from the above stated. Any alteration or deviation from the above specifications will involve extra costs and written order and will become an extra charge over and above the estimate. All agreements are contingent upon anything beyond our control Acceptance of Proposal The above prices. specification and conditions are satisfactory and are hereby accepted. RMC Electric is authorized to do the work as specified.Date: Signature: Thank you -Randy Morales. EFTA01124871

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
2dab68b2-f6c1-4975-9b21-2978a2f19d07
Storage Key
dataset_9/EFTA01124871.pdf
Content Hash
4da0e3b4cf2d2f30bff45fa0b9d71be1
Created
Feb 3, 2026