EFTA02349683.pdf
dataset_11 pdf 51.0 KB • Feb 3, 2026 • 1 pages
From: Larry Visoski
Sent: Thursday, March 24, 2016 1:21 PM
To: Je vacation; Lesley Groff
Cc: Rich Kahn
Subject: GIV update
Jeffrey,
Elevator flight con=rol cable was changed due to ware.
While doing flight control che=ks, Gulfstream mechanic noticed a clicking sound in control yoke, while rot=ting aileron
yoke.
They removed the Yoke from cockpit= replacing nut plate under floor board in cockpit, time consuming,. Better u=date
on delivery status later today.,Dave and I plan to arrive at Wes=field at noon tomorrow.
Thx
Larry
Pete and Larry,
Aircraft is still in t=il dock. Wing leak checks ongoing as some panels have leaked and requi=e corrective action.
O2 bottles installed and leak checked.
= We have run into some challenge's with the yoke repair/installation. This i= pushing our time frame back. We will
access any revision to delivery l=ter today as work progresses and we can make an accurate estimate.c/=iv>
Tha=k You,
Mike Tucker
Gulfstream
Westfield Ma.
rdiv>Sent from my iPhone
1
EFTA_R1_01326384
EFTA02349683
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 2ce8b444-26b9-4e6f-8ed4-32d3c7223244
- Storage Key
- dataset_11/EFTA02349683.pdf
- Content Hash
- 8c9ce3d96ead0a6bfc88021e85106f75
- Created
- Feb 3, 2026