EFTA01017005.pdf
dataset_9 pdf 109.8 KB • Feb 3, 2026 • 2 pages
From: J <jeevacation@gmail.com>
To: lvjet
Subject: Re: Aircraft updates
Date: Sun, 11 Nov 2018 04:10:12 +0000
landing gear. ok. wendys buyer is not serious.
On Sun, Nov 11, 2018 at 4:22 AM Larry Visoski a wrote:
Jeffrey,
Some GIV / G550 scheduling ideas for you to think about.,
Since we are on 2 week hold with current buyer, we have some maintenace items coming due in December on
the GIV, since we are only liable for Due items until closing.
-we have Landing gear 48month corrosion inspection due Dec 31st, with Extension until January 15, 2019.
Approx 2 weeks to complete, its 20 manhours each gear, labor, $10k+ estimate total, plus any parts needed,
typically, these are high dollar parts
(if needed), $15 - $25k+ a Big unknown.
Pete is checking with Meridian Maintenance schedule, to see if we can accomplish this gear inspection in
Teterboro soon,
***(anywhere other than a Gulfstream facility).
Either way, this Gear inspection will effect the next buyer, the sooner we get this accomplished, the better off
we are. Plus some extra due items in December, largest big dollar item being the Gear inspection.
The open item in Westfield is the CVR "Cockpit Voice Recorder" Channel 1 imp, also, need to replace the
CVR Cockpit Microphone. We have a 15 day grace period to fly without CVR working.
Gulfstream Savanah has replacement CVR upgrade for $24k, our best option we are working, *** Gulfstream
Westfield has an "As Removed" CVR for $3,500 that should work, as long as Gulfstream Westfield provide
the necessary paper work to back up this Part. Pete is working on the best Economical solution
I assume you will want to have the GIV ready to fly, when Eric gives you an interior slot to complete the G550
soon, so you are not without a plane.
Also, since the Veneer is currently the Achilles Heal of the interior, and will be a concern of other prospective
buyers, I was thinking if you would like to have the $45k Veneer repair work accomplished asap„ if the current
buyer moves to close in the next 2 to 3 weeks, we could subtract the $45k from the $100k MAX you offered
on the contract to the current for Un-Airworthy items.
This way we are in perfect condition to reMarket the GIV (if Necessary), offering:
1-Fresh PreBuy accomplished by Westfield Gulfstream,
2-Fresh 10 year dual engine MidLife.
3-72 Month just completed.
4-Veneer looking its best.
Do you have any interest in getting the Veneer addressed now? Landing gear inspection? Or wait?
Just thinking ahead,.
Thx,
Larry .
EFTA01017005
Sent from my iPad
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01017006
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 2c099949-d0e2-4d9a-8d59-00eccd9a08a6
- Storage Key
- dataset_9/EFTA01017005.pdf
- Content Hash
- be3abef334e9caacf3ada06d12dee173
- Created
- Feb 3, 2026