EFTA01074795.pdf
dataset_9 pdf 4.9 MB • Feb 3, 2026 • 61 pages
Harleysville, A National Flood Write Your Own Company
Harleysville
irentapityle la Immo: National Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell. MT 59903.2057
Business: Fax:
Insured: 484 Greenwich St Inc Business:
Property: 484 Greenwich St Home:
New York, NY 10013-1313 E-mail:
Home: 484 Greenwich St
New York, NY 10013-1313
Claim Rep.: Robert Spicuzza Business:
Business: 2200 Bayshore Blvd.
Dunedin, FL 34698
Estimator: Robert Spicuzza Business:
Business: 2200 Bayshore Blvd.
Dunedin, FL 34698
Reference:
Company: Harleysville Mutual Insurance Company
Claim Number: 10383390 Policy Number: 87041664642012 Type of Loss: Flood
Date Contacted: 11/7/2012
Date of Loss: 10/29/2012 Date Received: 11/5/2012
Date Inspected: 11/14/2012 Date Entered: 11/12/2012 5:52 PM
Price List: NYMN7X_NOV12
Restoration/Service/Remodel
Estimate: 484_GREENWICH_ST_INC
EFTA01074795
• Harleysville, A National Flood Write Your Own Company
Harleysville National
Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell, MT 59903.2057
Business: Fax:
484_GREENVVICH_ST_INC
Basement Areas
Exit Room Height 8'
to mint
T 177.33 SF Walls
207.75 SF Walls & Ceiling
30.42 SF Ceiling
30.42 SF Floor
3.38 SY Flooring 22.17 LF Floor Perimeter
1 I- VW -I
22.17 LF Ceil. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 30.42 SF 0.33 10.04 <0.00> 10.04
Apply anti-microbial agent 30.42 SF 0.20 6.08 <0.00> 6.08
Totals: Exit Room 16.12 0.00 16.12
I-5 2' Storage Room Height: 8'
288.00 SP Walls 65.00 SF Ceiling
353.00 SF Walls & Ceiling 65.00 SF Floor
7.22 SY Flooring 36.00 LF Floor Perimeter
36.00 LF Ceil. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 65.00 SF 0.33 21.45 <0.00> 21.45
Apply anti-microbial agent 65.00 SF 0.20 13.00 <0.00> 13.00
Totals: Storage Room 34.45 0.00 34.45
n• Electrical Room Height: 8'
281.33 SF Walls 74.38 SF Ceiling
355.71 SF Walls & Ceiling 74.38 SF Floor
8.26 SY Flooring 35.17 LF Floor Perimeter
35.17 IS Ceil. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
484_GREENWICH_ST_INC 3/22/2013 Page: 2
EFTA01074796
• Harleysville, A National Flood Write Your Own Company
Harleysville
nandpenfie National Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell, MT 59903.2057
Business: Fax:
CONTINUED - Electrical Room
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 74.38 SF 0.33 24.55 <0.00> 24.55
Apply anti-microbial agent 74.38 SF 0.20 14.88 <0.00> 14.88
Totals: Electrical Room 39.43 0.00 39.43
Office Height: 8'
1058.67 SF Walls 752.00 SF Ceiling
1810.67 SF Walls & Ceiling 752.00 SF Floor
83.56 SY Flooring 132.33 LF Floor Perimeter
135.33 LF Cell. Perimeter
Subroom: Stairs (1) Height: 17'
228.41 SF Walls 23.94 SF Ceiling
252.35 SF Walls & Ceiling 41.81 SF Floor
4.65 SY Flooring 19.03 LF Floor Perimeter
16.13 LF Cell. Perimeter
Miss ng Wall 3' X 17' Opens into OFFICE
Miss ng Wall 3' X 17' Opens into Exterior
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 793.81SF 0.33 261.96 <0.00> 261.96
Apply anti-microbial agent 793.81SF 0.20 158.76 <0.00> 158.76
112" drywall - hung only (no tape or 643.54 SF 1.11 714.33 <314.31> 400.02
finish)
Batt insulation - 4" - RI5 643.54 SF 1.00 643.54 <283.16> 360.38
110 volt copper wiring run, box and 7.00EA 69.57 486.99 <321.41> 165.58
outlet
Totals: Office 2,26538 918.88 1,346.70
484._GREENWICH_STJNC 3/22/2013 Page: 3
EFTA01074797
Harleysville, A National Flood Write Your Own Company
Harleys‘Ale
(...fprotfr so knew' National Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell,
Business: Fax:
E 10' -I Phone Room Height: 8'
6'6'-
1
Ii
.
217.33 SF Walls
263.37 SF Walls & Ceiling
46.04 SF Ceiling
46.04 SF Floor
5.12 SY Mooring 27.17 LF Floor Perimeter
27.17 LF Ceil. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 46.04 SF 0.33 15.19 <0.00> 15.19
Apply anti-microbial agent 46.04 SF 0.20 9.21 <0.00> 9.21
110 volt copper wiring run, box and 1.00 EA 69.57 69.57 <45.92> 23.65
outlet
Totals: Phone Room 93.97 45.92 48.05
Boiler ROom Height: 8'
Jaime
r
*Me('
296.00 SF Walls
376.87 SF Walls & Ceiling
80.87 SF Ceiling
80.87 SF Floor
L 8.99 SY Flooring
37.00 12 Ccil. Perimeter
37.00 12 Floor Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 80.87 SF 0.33 26.69 <0.00> 26.69
Apply anti-microbial agent 80.87 SF 0.20 16.17 <0.00> 16.17
Totals: Boiler ROom 42.86 0.00 42.86
1-5' 10' —I Elevator area Height: 8'
201.33 SF Walls 38.96 SF Ceiling
240.29 SF Walls & Ceiling 38.96 SF Floor
4.33 SY Flooring 25.17 LF Floor Perimeter
25.17 LF Cell. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 38.96 SF 0.33 12.86 <0.00> 12.86
484_GREENW1CH_ST_INC 3/22/2013 Page: 4
EFTA01074798
, • Harleysville, A National Flood Write Your Own Company
Harleysville
National Flood Services
••• • Flood Insurance Processing Center
P.O. Box 2057
Kalispell, MT 59903-2057
Business: Fax:
CONTINUED - Elevator area
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Apply anti-microbial agent 38.% SF 0.20 7.79 <0.00> 7.79
Totals: Elevator area 20.65 0.00 20.65
I- 6' 6' -I Equip Room Height: 8'
212.00 SF Walls 43.68 SF Ceiling
255.68 SF Walls & Ceiling 43.68 SF Floor
4.85 SY Flooring 26.50 LF Floor Perimeter
26.50 LF Ccil. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 43.68 SF 0.33 14.41 <0.00> 14.41
Apply anti-microbial agent 43.68 SF 0.20 8.74 <0.00> 8.74
1/2" drywall - hung only (no tape or 106.00 SF 1.11 117.66 <51.77> 65.89
finish)
Totals: Equip Room 140.81 51.77 8t04
Laundry Room Height: 8'
237.33 SF Walls 46.98 SF Ceiling
284.31 SF Walls & Ceiling 46.98 SF Floor
5.22 SY Flooring 29.67 IS Floor Perimeter
29.67 IS Cell. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 46.98 SF 0.33 15.50 <0.00> 15.50
Apply anti-microbial agent 46.98 SF 0.20 9.40 <0.00> 9.40
1/2" drywall - hung only (no tape or 118.67 SF 1.11 131.72 <0.00> 131.72
finish)
484_GREENWICH_ST_INC 3/22/2013 Page: 5
EFTA01074799
Harleysville, A National Flood Write Your Own Company
Harleysville
National Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell,
Business: Fax:
CONTINUED - Laundry Room
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
110 volt copper wiring run, box and 2.00EA 69.57 139.14 <91.83> 47.31
outlet
Totals: Laundry Room 295.76 91.83 203.93
Total: Basement Areas 2,949.63 1,108.40 1,841.23
1st Floor Areas
Garage Height: 10'
663.33 SF Walls 264.44 SF Ceiling
927.78 SF Walls & Ceiling 264.44 SF Floor
29.38 SY Flooring 66.33 12 Floor Perimeter
66.33 LF Cell. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 264.44 SF 0.33 87.27 <0.00> 87.27
Apply anti-microbial agent 264.44 SF 0.20 52.89 <0.00> 52.89
Clean part of the walls - Heavy 165.83 SF 0.33 54.72 <0.00> 54.72
Apply anti-microbial agent 165.83 SF 0.20 33.17 <0.00> 33.17
1/2" drywall - hung, taped, heavy 331.67 SF 2.28 756.21 <332.73> 423.48
texture, ready for paint
Totals: Garage 984.26 332.73 65133
Foyer/Entry Height: 10'
350.00 SF Walls 66.00 SF Ceiling
416.00 SF Walls & Ceiling 66.00 SF Floor
7.33 SY Flooring 35.00 LF Floor Perimeter
35.00 LF Ceil. Perimeter
I-0
484_GREENW1CH_ST_INC 3/22/2013 Page: 6
EFTA01074800
Harleysville, A National Flood Write Your Own Company
Harleysville
tn.mlpeork tagmut National Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell, T 9903-2057
Business: Fax:
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 66.00 SF 0.33 21.78 <0.00> 21.78
Apply anti-microbial agent 66.00 SF 0.20 13.20 <0.00> 13.20
Totals: Foyer/Entry 34.98 0.00 34.98
.17.a• Storage Room Height: 10'
418.33 SF Walls 78.67 SF Ceiling
497.00 SF Walls & Ceiling 78.67 SF Floor
8.74 SY Flooring 41.83 LF Floor Perimeter
41.83 LF Ceil. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 78.67 SF 0.33 25.96 <0.00> 25.96
Apply anti-microbial agent 78.67 SF 0.20 15.73 <0.00> 15.73
Totals: Storage Room 41.69 0.00 41.69
Lobby Height: 10'
888.33 SF Walls 265.11 SF Ceiling
1153A5 SF Walls & Ceiling 265.11 SF Floor
29.46 SY Flooring 88.83 LF Floor Perimeter
91.83 LF Ceil. Perimeter
Subroom: Stairs (1) Height: 17'
206.05 SF Walls 21.10 SF Ceiling
227.15 SF Walls & Ceiling 36.97 SF Floor
4.11 SY Flooring 16.76 LF Floor Perimeter
14.23 LF Cell. Perimeter
Miss ng Wall 3' X 17' Opens into LOBBY
Missing Wall 3' X 17' Opens into Exterior
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 302.09 SF 0.33 99.69 <0.00> 99.69
484_GREENWICH_ST_INC 3/22/2013 Page: 7
EFTA01074801
; • • Harleysville, A National Flood Write Your Own Company
Harleysville
National Flood Services
••• Flood Insurance Processing Center
P.O. Box 2057
Kalispell. MT 59903-2057
Business: Fax:
CONTINUED - Lobby
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Apply anti-microbial agent 302.09 SF 0.20 60.42 <0.00> 60.42
Totals: Lobby 160.11 0.00 160.11
Kitchen Height: 101
301.67 SF Walls 53.67 SF Ceiling
355.33 SF Walls & Ceiling 53.67 SF Floor
5.96 SY Flooring 30.17 LF Floor Perimeter
Y 10. 30.17 LF Cell. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 53.67 SF 0.33 17.71 <0.00> 17.71
Apply anti-microbial agent 53.67 SF 0.20 10.73 <0.00> 10.73
Totals: Kitchen 28.44 0.00 28.44
1— 5' 10'-1
Elevator Area Height: 8'
170.67 SF Walls 28.42 SF Ceiling
elrArti
199.08 SF Walls & Ceiling 28.42 SF Floor
c.. 3.16 SY Flooring 21.33 LF Floor Perimeter
21.33 LF Cell. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean the floor - Heavy 28.42 SF 0.33 9.38 <0.00> 9.38
Apply anti-microbial agent 28.42 SF 0.20 5.68 <0.00> 5.68
Totals: Elevator Area 15.06 0.00 15.06
Total: 1st Floor Areas 1,264.54 332.73 931.81
484_GREENWICH_ST INC 3/22/2013 Page: 8
EFTA01074802
• Harleysville, A National Flood Write Your Own Company
Harleysville
e••••••Ipropre tokunot; National Flood Services
•. ..... Flood Insurance Processing Center
P.O. Box 2057
Kalispell, 3.2057
Business: Fax:
basement
Basement Height: 8'
912.00 SF Walls 802.74 SF Ceiling
1714.74 SF Walls & Ceiling 802.74 SF Floor
89.19 SY Flooring 114.00 12 Floor Perimeter
114.00 LF Ceil. Perimeter
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Clean part of the walls - Heavy 456.00 SF 0.33 150.48 <0.00> 150.48
Apply anti-microbial agent 456.00 SF 0.20 91.20 <0.00> 91.20
Clean the floor with pressure steam 802.74 SF 0.73 586.00 <0.00> 586.00
Sec enclosed invoice from ServPro
Air mover (per 24 hour period) - No 90.00EA 25.38 2,284.20 <0.00> 2,284.20
monitoring
See enclosed invoice from ServPro - 30 units for 3 days
Dehumidifier (per 24 hour period) - 12.00 EA 101.25 1,215.00 <0.00> 1,215.00
XLarge - No monitoring
See enclosed invoice from ServPro 4 units for 3 days
Equipment setup, take down, and 4.00HR 44.46 177.84 <0.(IO> 177.84
monitoring (hourly charge)
See enclosed invoice from ServPro - Less monitoring
Emergency service call - during 1.00EA 124.50 124.50 <0.00> 124.50
business hours
See enclosed invoice from ServPro
Water Extraction & Remediation - 50.00 EA 44.46 2,223.00 <0.00> 2,223.00
Labor Minimum
Sec enclosed invoice from Scvpro for Labor charge for cleaning and demolition
Pump water from basement and 1.00 EA 3,000.00 3,000.00 <0.00> 3,000.00
elevator shaft*
See enclosed invoice from All Pro Design & Construction Corp.
Dumpster load - Approx. 30 yards. 5-7 2.00 EA 889.60 1,779.20 <0.00> 1,779.20
tons of debris
Rig and Secure Elevator Hoistway 16.00 EA 380.00 6,080.00 <0.00> 6,080.00
See enclosed documentation from Infinity Elevator
Remove Oil from Htdraulic tank and 1.00 EA 6,860.00 6,860.00 <0.00> 6,860.00
dispose of contaminated il*
Sec enclosed documentation from Infinity Elevator
Furnish and install New Hydraulic 1.00 EA 14.970.00 14.970.00 <4.041.90> 10,928.10
Tank Pump and Motor*
See enclosed documentation from Infinity Elevator
Furnish and Install new Hydraulic Oil* 1.00 EA 4,015.00 4.015.00 <1.084.05> 2,930.95
484_GREENWICH_ST_INC 3/22/2013 Page: 9
EFTA01074803
‘• Harleysville, A National Flood Write Your Own Company
Harleysville
National Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell. MT 59903-2057
Business: Fax:
CONTINUED - Basement
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
See enclosed documentation from Infinity Elevator
Remove Controller and Furnish and 1.00 EA 15,620.00 15,620.00 <4.217.40> 11,402.60
Install Ncw Controller*
See enclosed documentation from Infmity Elevator
Remove Traveling cable and Furnish 1.00 EA 5,496.00 5,496.00 <1,483.92> 4,012.08
and Install New*
See enclosed documentation from Infinity Elevator
Remove Car Salley Plank and Furnish 1.00 EA 6,290.00 6.290.00 <1,698.30> 4,591.70
and Install New*
See enclosed documentation from Infinity Elevator
Remove and Furnish and Install New 1.00 EA 6,510.00 6,510.00 <1,757.70> 4,752.30
Car Door Operator*
See enclosed documentation from Infinity Elevator
Remove and Furnish and install Ncw I.00EA 4,990.00 4,990.00 <1.347.30> 3,642.70
Car Platform*
See enclosed documentation from Infinity Elevator
Remove and Furnish and Install New 1.00 EA 24,900.00 24,900.00 <6,723.00> 18,177.00
Cabs
See enclosed documentation from Infinity Elevator
Remove and Furnish and install New 1.00 EA 4,990.00 4,990.00 <1,347.30> 3,642.70
Car Operating Panel*
See enclosed documentation from Infinity Elevator
Renew Car Door Hanger Rollers* 1.00 EA 445.00 445.00 <120.15> 324.85
See enclosed documentation from Infinity Elevator
Furnish and Install New Car Door 1.00 EA 2,170.00 2.170.00 <585.90> 1,584.10
Detector Edge*
See enclosed documentation from Infinity Elevator
Renew 1P8300 unit on top of car* 1.00 EA 1,520.00 1,520.00 <410.40> 1,109.60
See enclosed documentation from Infinity Elevator
Renew IP8300 Shaftway Tape and 1.00 EA 3,040.00 3,040.00 <820.80> 2,219.20
Targets*
See enclosed documentation from Infinity Elevator
Renew Car Top Inspection Station* 1.00 EA 510.00 510.00 <137.70> 372.30
Sec enclosed documentation from Infinity Elevator
Remove and Furnish and Install new 1.00 EA 2,170.00 2,170.00 <585.90> 1,584.10
Governor and Governor Rope*
See enclosed documentation from Infinity Elevator
484_GREENWICH_ST_INC 3/22/2013 Page: 10
EFTA01074804
"„ • Harleysville, A National Flood Write Your Own Company
Harleysville
GOO'?pgWrit know' National Flood Services
• Flood Insurance Processing Center
P.O. Box 2057
Kalispell, 94 03•2057
Business: Fax:
CONTINUED • Basement
DESCRIPTION QUANTITY UNIT COST RCV DEPREC. ACV
Renew Car Fan* 1.00 EA 510.00 510.00 <137.70> 372.30
See enclosed documentation from Infinity Elevator
Renew Shaftway Wire* 1.00 EA 4,820.00 4,820.00 <1,301.40> 3,518.60
See enclosed documentation from Infinity Elevator
Remove and Furnish and Install New 1.00 EA 2,930.00 2,930.00 <791.10> 2,138.90
Hoist Ropes*
See enclosed documentation from Infinity Elevator
Renew Saft Door elcctro mechanical 1.00 EA 2.082.00 2,082.00 <562.14> 1,519.86
interlock contact and keeper tips*
Sec enclosed documentation from Infinity Elevator
Renewlnterlock wiring renew hanger 1.00 EA 2,355.00 2,355.00 <635.85> 1,719.15
rollers on shaft doors*
See enclosed documentation from Infinity Elevator
Renew Shaftway Limit switches in pit 1.00 EA 3,430.00 3,430.00 <$26.10> 2.503.90
area*
See enclosed documentation from Infinity Elevator
Renew Pit Stop Switch* 1.00EA 471.00 471.00 <127.17> 343.83
See enclosed documentation from Infinity Elevator
Clean Car top and paint* 1.00 EA 3,105.00 3,105.00 <838.35> 2,266.65
See enclosed documentation from Infinity Elevator
Tune and Adjust Elevator for Proper 1.00 EA 4,690.00 4,690.00 <0.00> 4,690.00
Operation*
See enclosed documentation from Infinity Elevator
Water heater - Commercial - 75 gallon - 1.00EA 2,766.43 2,766.43 <636.28> 2.130.15
Gas
A.0 Smith M#PCG75 Ser#186751001
Remove and Replace Trane Furnace 1.00EA 6,633.57 6,633.57 <1,525.72> 5,107.85
Unit and a/c Coils - See enclosed
documentation from Merette I IVAC -
less water heater allowance given*
Totals: Basement 156,000.42 33,843.53 122,156.89
Total: basement 156,000.42 33,84333 122,156.89
Line Item Totals: 484_GREENWICIL.STJNC 160,214.59 35,284.66 124,929.93
484_GREENW1CH_STJNC 3/22/2013 Page: 11
EFTA01074805
Harleysville, A National Flood Write Your Own Company
Harleysville
(.”.„,,,,,„14.„k„, . National Flood Services
• -•--- Flood Insurance Processing Center
P.O. Box 2057
Kalispell, T 3-2057
Business: Fax:
Grand Total Areas:
7,108.13 SF Walls 2,782.41 SF Ceiling 9,890.53 SF Walls and Ceiling
2,816.16 SF Floor 312.91 SY Flooring 804.46 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 805.02 LF Ccil. Perimeter
2,816.16 Floor Area 2,979.63 Total Area 6,542.51 Interior Wall Arca
3,447.16 Exterior Wall Arca 360.65 Exterior Perimeter of
Walls
0.00 Surface Arca 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
484_GREENWICH_ST_INC 3/22/2013 Page: 12
EFTA01074806
Harleysville, A National Flood Write Your Own Company
Harleysville
Goodpeople mimed National Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell. MT 59903-2057
Business: Fax:
Summary for Dwelling
Line Item Total 160,214.59
Total Tax(Rcp-Maint) 8.250% 13,217.70
Replacement Cost Value $173,432.29
Less Non-recoverable Depreciation <38.195.64>
Actual Cash Value $135,236.65
Less Deductible (2,000.00)
Net Claim $133,236.65
Robert Spica=
484_GREENWICH_ST_INC 3/22/2013 Page: 13
EFTA01074807
; • • Harleysville, A National Flood Write Your Own Company
Harleysville
inoudpeoplemktimr National Flood Services
Flood Insurance Processing Center
P.O. Box 2057
Kalispell, MT 59903-2057
Business: Fax:
Recap by Room
Estimate: 484 GREENWICH ST INC
Area: Basement Areas
Exit Room 16.12 0.01%
Storage Room 34.45 0.02%
Electrical Room 39.43 0.02%
Office 2,265.58 1.41%
Phone Room 93.97 0.06%
Boiler ROom 42.86 0.03%
Elevator area 20.65 0.01%
Equip Room 140.81 0.09%
Laundry Room 295.76 0.18%
Area Subtotal: Basement Areas 2,949.63 1.84%
Area: 1st Floor Areas
Garage 984.26 0.61%
Foyer/Entry 34.98 0.02%
Storage Room 41.69 0.03%
Lobby 160.11 0.10%
Kitchen 28.44 0.02%
Elevator Area 15.06 0.01%
Area Subtotal: 1st Floor Areas 1,264.54 0.79%
Area: basement
Basement 156,000.42 97.37%
Area Subtotal: basement 156,000.42 97.37%
Subtotal of Areas 160,214.59 100.00%
l'otal 160,214.59 100.00%
484_GREENWICH_ST_INC 3/22/2013 Page: 14
EFTA01074808
• Harleysville, A National Flood Write Your Own Company
Harleysville
National Flood Services
— Flood Insurance Processing Center
P.O. Box 2057
Business:
Kalispell.iiiiiiff Fax:
Recap by Category with Depreciation
Items RCV Deprec. ACV
CLEANING 1,455.64 1,455.64
GENERAL DEMOLITION 1,779.20 1,779.20
DRYWALL 1,719.92 698.81 1,021.11
ELECTRICAL 695.70 459.16 236.54
MISC. EQUIPMENT - COMMERCIAL 134,969.00 31,681.53 103,287.47
HEAT, VENT & AIR CONDITIONING 6,633.57 1,525.72 5,107.85
INSULATION 643.54 283.16 360.38
PLUMBING 2,766.43 636.28 2,130.15
WATER EXTRACTION & REMEDIATION 9,551.59 9,551.59
Subtotal 160,214.59 35,284.66 124,929.93
Total Tax(Rep-Maint) 8.250% 13,217.70 2,910.98 10,306.72
Total 173,432.29 38,195.64 135,236.65
484_GREENWICH_ST_INC 3/22/2013 Page: 15
EFTA01074809
Basement Areas
lit
y r 7 V 4" Ifs. we
Seta Clessuat Skis
• er /Yr
Islam
r
2
37
BaNflMill MIMS
484_GREENWICIELST INC 3/22/2013 Page: 16
EFTA01074810
1st Floor Areas
r
I) $4
$T
fat
II
Lida 'C se
sr
4' L
MIN
Mr
-11
let FlOot Pass
484_GREE.NWICH_ST_INC 3/22/2013 Page: 17
EFTA01074811
basement
Dineen's),
484 GREENWICH_ST_INC 3/22/2013 Page: 18
EFTA01074812
DH Storm Team
121 Pennsylvania Ave
Avondal PA 19311
Client SS
Property: 484 Greenwich Street
Manhattan, NY
Operator Info:
Operator: TONY
Estimator. Cecilia Jarvis Business:
Business: 202 West 1st Street
London, KY 40741
Type of Estimate: Water Damage
Date Entered: 12/3/2012 Date Assigned:
Price List: NJNE7X OCT12
Labor Efficiency: Restoration/Service/Remodel
Estimate: 201242-03-1424
EFTA01074813
DH Storm Team
121 Pennsylvania Ave
OM 19311
2012-12-03-1424
Mitigation
DESCRIPTION QNTY REMOVE REPLACE TOTAL
1. Emergency service call - during business 1.00 EA 0.00 124.50 124.50
hours
2. Equipment setup, take down, and 6.00 HR 0.00 44.46 266.76
monitoring (hourly charge)
3. Haul debris - per pickup truck load - 6.00 EA 136.40 0.00 818.40
including dump fees
4. Clean the surface area with pressure 2,826.84 SF 0.00 0.73 2,063.59
steam
5. Apply plant-based anti-microbial agent 1,859.39 SF 0.00 0.21 390.47
6. Water Extraction & Remediation 50.00 HR 0.00 44.46 2,223.00
Technician - per hour
7. Containment Barrier/Airlock/Dccon. 24.00 SF 0.00 0.80 19.20
Chamber
8. Air mover (per 24 hour period) - No 90.00 EA 0.00 25.38 2,284.20
monitoring- 30 for 3 days
9. Dehumidifier (per 24 hour period) - 12.00 EA 0.00 101.25 1,215.00
XLarge - 4 for 3 days
10. Neg. air fan/Air scrub.-XLrg (per 24 hr 6.00 DA 0.00 140.60 843.60
period)-No monit. 2 for 3 days
Totals: Mitigation 10,248.72
Line Item Totals: 2012-12-03-1424 10,7A8.72
2012-12-03-1424 12/312012 Page: 2
EFTA01074814
J
DH Storm Team
121 Pennsylvania Ave
19311
OM
Summary
Line Item Total 10,248.72
Total Tax(Rep-Maint) ® 7.000% x 10,248.72 717.41
Replacement Cost Value S10,966.13
Net Clem $10,966.13
Cecilia Jarvis
2012-12-03
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 292bd5dd-4aad-4f45-b8ed-af63f6725d17
- Storage Key
- dataset_9/EFTA01074795.pdf
- Content Hash
- b97198f0e8b6fe136e459c2cfeaafd7c
- Created
- Feb 3, 2026