Epstein Files

EFTA01030520.pdf

dataset_9 pdf 110.4 KB Feb 3, 2026 3 pages
From: Richard Kahn < n To: Jeffrey Epstein <jeevacation3gmail.com> Subject: Steel building Date: Tue, 12 Mar 2019 20:00:21 +0000 Inline-Images: image002.pn& image003.png; image004.png; imagc005.png; image006.jpg; image001.jpg not that i am aware of.. problem is that if i do not push everyone daily nothing gets done.. unfortunately lately i have been busy with banks, brokerages and hedge funds.. last emails to glidden below.. Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel fax ce l On Mar 12, 2019, at 3:57 PM,1<jcancation@gmail.O11D> wrote: Did we order the building steel Begin forwarded message: From: Richard Kahn Subject Fwd: 40x60 bldg. Date: Mardi 7, 2019 at 4:15:25 PM EST To: michael glidden Cc: Daphne Wallace , Stephanie Remington •r i=illin i am not sure if you responded and i apologize if you did and i missed it.. could you please update on status and next steps as jcc would like ordered asap thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel fa cc Begin forwarded message: From: Richard Kahn Subject: Fwd: 40x60 bldg. Date: February 22, 2019 at 3:25:25 PM EST To: michael glidden Cc: Daphne Wallacen>, Stephanie Remington can you please review and reply ASAP thanks EFTA01030520 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York. NY 10022 tel fax cel Begin forwarded message: From: Brian Buck -41=I > Subject: RE: 40x60 bldg. Date: February 21.2019 at 1:30:57 PM EST To: michael glidden Cc: Daphne Wallace Richard Kahn c Stephanie Remington <a> Michael. I want to put together a drawing for you but I need to daftly a couple of things first. . So the building was not erected according to plans. it was modified somewhat in the field? The bulding was a fury sheeted building. So the erector opened up the left end wall to 8'2' and the back side was to Rye. but was sheeted 56" past the roof of the 14" slab. How deep is the retaining wall? • Are the (2)12'x 14' doors on the marked up avg you sent back (frau side wall and right end wall) to be included in these locations? Are we addrig a third rolup door in bay e3 of the front side wall where you currently have a 15' rough opening? Assuming the above is correct this is what I would propose. We previously had the left end wall as a flush girt ccodition. I would change it to a bypass gin so that the girt would extend 10'(depth of girt) past the face of the column. This way a) the panel would lap over the retaining wall(if it es 10' or less deep) for a good seal and b) would aided us to shift the columns in 10'. This will dear the existing anchor bons which will be cut off and providing the pier is sufficient in width, would save a whole lot of time and labor on those (4) left end wall columns. I'd leave the back side wall open to 106'. sheet above the roof and provkka a wee to roof flashing. I'm assuming the slab is all even elevation? I think if we change the bay spacings slightly(less than a foot in most cases) we can avoid having to do a lot of the demolition. What do you think? Regards. Brian Buck President Web www.bucksteetccon Follow us on social medial . • tainterest magi5/03,EaCebOnkcXaCiOglet [0,6uckSieer 6855 Lyons Technology Circle I Suite 181 Coconut Creek FL 33073 1107 Etattlewoxt Street I Suite 221 I Franklin TN 37069 r. • tri• • r-nt Ire corrinii 4 , 1• , ) rof'donna' and may use be analWird et of for the etrialushie use of the flooded toorentisi If you are MIIhe intencled molpientrel please of....-. r•ot mat son n in any anathlilealS. CLy WON txtptl artd my be ursawitil. Alicia fa coolant of Pus email bpersonal or ceherek. unconnected with the firm's or its business. Burk Steel accepts no rasponsibitity or ' +bitty .at ons Car-4014e or error free as Information roof be intercepted corrupted amended loll destroyed, arrive arte at Incomplete, or contain viruses we do ace accept liability for any such mailers or Int. consequences From: michael glidden Sent: Wednesday, February 20, 2019 4:56 PM To: Brian Buck a Cc Daphne Wallace <a; Richard Kahn < :-; Stephanie Remington Subject: Fwd:40x60 bldg. Good afternoon Brian. I thought that this might help understanding how the building was installed. The only openings are as marked up. I will gather the Information tomorrow that we discussed . Begin forwarded message: From: michael glidden Subject: 40x60 bldg. Date: Februa 20. 2019 at 5:47:48 PM AST To: EFTA01030521 Sent from my Phone EFTA01030522

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
232be531-3b96-4944-ad7e-3d87191b2304
Storage Key
dataset_9/EFTA01030520.pdf
Content Hash
648997ef8fbcbfc0ebb29e535c731214
Created
Feb 3, 2026