EFTA01014731.pdf
dataset_9 pdf 103.4 KB • Feb 3, 2026 • 2 pages
From: Richard Kahn
To: Jeffrey Epstein <jeevacation@gmail.com>
Subject: Fwd: On going work list
Date: Sat, 01 Dec 2018 17:09:04 +0000
Richard Kahn
HBRK Associates Inc.
New York, NY 10022
Phone
Fax
Cell
Begin forwarded message:
From: michael glidden <
Date: December 1, 2018 at 10:18:47 AM EST
To: Richard Kahn
Cc: brice gordon
Subject: On going work list
I. Palm tree lighting
2. Courtyard lighting
3. Landscape lighting at Master bedroom stairs
4. Pool cabana kitchen electric
5. Main compound cabanas, electric and lighting
6. Chillax a/c renovation, chandelier removal and lighting
7. Dock electric, lighting, under water lighting and wifi
8. Camera at staff cottage for dock
9. Cistern drains for main compound
10. WAPA switch replacement
11. Install ducbank/trench from generator bldg to tunnel for future electric feed to GSJ & fiber run for desal
controls
12. Install movie room ceiling speakers and amps
13. Replace all recessed lights at pool gazebo structures
14. Repair 2nd pool heater at flag pole pool
15. Repair/refurbish both fuel dispensers
16. Complete trouble shooting/repair Diesal pump feeding dispenser
17. Install new water distribution pump system for LSJ
18. Refurbish water distribution manifold
19. Install new sewage lift/mascerating pump for LSJ staff cottage and piping to treatment plant
20. Address water heating issue at staff cottage
21. LSJ tiki kitchen remodel electric and plumbing
22. Blue Beach cottage transformer replacement
23. Electric and data to 5 palms
24. Electrical conduit work at tower antenna
25. Solar system and electrical at Pebble Beach cottage
EFTA01014731
26. Power to beach for captains
27. Larger filter for sea water intake at library/beach well
28. Refurbish fire suppression system in generator building
29. Fuel truck rehab per survey
30. Generator fuel system refurbishment
31. Replacement of electric panels in both pool pump rooms
32. Electric out to new waterfall area
33. Replace all exterior light trims to white due to rust
34. Replace all exterior switch and outlet covers due to corrosion
35. Staff cottage dryer to be changed to propane jetting
36. Install lighting for library statues
37. Install new awnings at both pool gazebo structures
38. Install two new sewage treatment plants on GSJ
39. Wire new generators on GSJ
40. Install new flagpole lights on GSJ
41. Replace water distribution pump on GSJ
42. Install electric and plumbing in new tiki hut on GSJ
43. Batteries to be replaced in GSJ solar system
44. Daily managing of barge schedule
45. Research and order maintenance/repair parts
46. Daily maintenance of electrical and plumbing systems for both islands
47. On going installation and refurbishment of landscape lighting island wide
48. Coordinate barge maintenance/refurbishment work
49. Coordinate with local architects for future services
50. Daily issues that cannot be anticipated or avoided
That would be all for now.
EFTA01014732
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 20f0a535-3200-4b9e-97f1-3ea8fd37d2aa
- Storage Key
- dataset_9/EFTA01014731.pdf
- Content Hash
- c056e5c5db69bafc5a4c8cb2b0c3223d
- Created
- Feb 3, 2026