From: Richard Kahn <
Sent: Tuesday, September 20, 2016 6:08 PM
To: Jeffrey E.
Subject: GSJ bids
lets discuss later
thanks
Richard Kahn
HBRK Associates Inc.
575 Lexington =venue 4th Floor
New York, NY 10022
tel
fax -
cell =-
Begin forwarded message:
From: =/b>Hugo Hodge •c: >
Subject: =/b>Re:
Date: =/b>September 20, 2016 at 11:52:47 =M EDT
To: =/b>Richard Kahn a ,
The 3rd bidder, =konite, was too high.
The Prysmian bid was FOB Norway and the costs to get it to =iami will eat up any savings we see on the surface.
On Tue, =ep 20, 2016 at 11:40 AM, Richard Kahn
cmailto > wrote:
Thank you. Yes still in meeting. What about =rd bidder. Why key rite when costs are 30 percent higher.
Sent from my iPhone
On Sep 20, 2016, at 11:32 =M, Hugo Hodge
<mailto » wrote:
EFTA_R1_01549777
EFTA02450771
Good morning Mr. Kahn,
Hopefully you are still =eeting with Mr. Epstein.
In General....
Prysmian:
Delivery:
` Delivery 20 Weeks =in
• Ex Works =orway
Price:
• 2/0 =625,252.10 or $33.25 per foot
• 4/0 $716,3745 or $38.10 per foot
• Reel Charges Non =efundable
• Reel #1=88,860.00
• Reeltt 2 =44,430.00
• FOB Miami Not =ncluded
Insulation:
165 =ils Min/205 Mils Max
Armor:
Galvanized Steel Wires bitumen =oated
Experience:
Excellent in Europe
Marginal in =SA
Kerite:
Delivery:
• Delivery 16 Weeks =in 20 Weeks Max
• FCA =iami
Price:
` 2/0 $992,574.20 or $52.79650 per =oot
` 4/0 =1,104,124.00 or $58.730 per foot
• Reel Charges 100% Refundable =nbsp;See terms
2
EFTA_R1_01549778
EFTA02450772
• Reel #1 =100,000.00 per reel
Note: I requested a cost =or 100% insulation from Kerite.
Insulation:
• 220 Mils
Armor:
• Jacketed (45 Mil Black HDPE) Galvanized Steel =ire
Experience:
▪ Excellent in USA
Min in =urope
I =ecommend going with Kerite Cable, 2/0 cable appears to be sufficient =or this project. This
summary only lists the differences in the two =ids. The other portions of the designs are similar and acceptable. I
=ecommend that we get a cost from Kerite to Ship the Cables on a Barge =ith Reels and Rigging from Miami and also
another cost to install the =able.
On the other matter, I have confirmed that smart metering =xists for L.S1 and will be utilized for
GSJ. I still owe you a review of =he account and will do that in short order.
Best,
HH
On Tue, =ep 20, 2016 at 10:08 AM, Richard Kahn
<mailtola > wrote:
can also update me on =mart metering for LSJ and GSJ as we previously discussed
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax <tel
cell <tel
3
EFTA_R1_01549779
EFTA02450773
4
EFTA_R1_01549780
EFTA02450774
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 20aca3a5-3541-408b-8893-9430c9535dba
- Storage Key
- dataset_11/EFTA02450771.pdf
- Content Hash
- 0889e6db4cf05ea69947f993096bca1e
- Created
- Feb 3, 2026