Subbase Drydock Inc. Invoice
PO Box 4429/ Parcel 162 Subbase
St. Thomas, USVI, 00803 Date Invoice #
T:(340) 776-2078 Fax:(340)779-8426
4 6812
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
We accept cash,
P.O. No. Project Terms checks, major creel cards, travelers
checks and wired funds. More info
AnwBoscoe Big N/LSJ Barge Upon Completion av !able regarding wired monies.
Qty/Hrs Description Rate Amount
Subbase and Island Rigging and Hydraulics reviewed projects that were on your "to do list"
this morning. I will list all projects that I can with a quote for each repair but first I would
like to comment on the condition of the LSJ Barge.
This vessel was hauled out at ow yard three years ago . During that haul out Subbase
quoted on most of the items you have in this current list. It was surprising to see that our
recommendations were not completed and as a result the current condition of the vessel is
not seaworthy. The overall appearance of the vessels is that it looks neglected and repairs
that were essential were cobbled together in an effort to get by.
The LSJ Barge needs a major overhaul to make her seaworthy and to ensure an extended
service life.
Subbase in not interested in making any repairs that will not be done properly; nor are we
interested in patching anything together for a temporary fix.
I understand that some projects may be more important then others so I will try to list each
project individually.
I Drydock hauling fees 1,500.00 1,500.00
12 Laydays: Approx 12 350.00 4,200.00
I Electricity Fee: Hook Up 75.00 75.00
l2 Electricity Fee: per day 60.00 720.00
I 5000 psi pressure wash 327.00 327.00
Thank youfor your business. Total
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpowtent in fit!! is received.
Balance Due
Page 1
EFTA01205870
Subbase Drydock Inc. Invoice
PO Box 4429/ Parcel 162 Subbase
St. Thomas, USVI, 00803 Date Invoice #
T:(340) 776-2078 Fax:(340)779-8426
4 6812
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
We accept cash,
P.O. No. Project Terms checks, major creel cards, travelers
checks and wired funds. More info
Annr Bost:n(2 Big N/LSJ Barge Upon Completion available regarding wired monies.
Qty/Hrs Description Rate Amount
I I & 2 ) Rudders: Subbase personnel examined the rudder room and we were able see major 20,000.00 20,000.00
corrosion on the transom. The hull plating has holes where sea water is seeping into the
vessel. The steering components need to be removed and cleaned, the rudders need to be
removed and serviced. The lower Pintle and gudgeons need service as well as the rudder
stuffing box. I would reserve 10k to 20k for this project. I have included pictures of this
compartment.
I 3-A) Install two cylinders with stainless steel shafts; including all hoses back to engine 45,000.00 45,000.00
room, with stainless steel ends on all hoses. We will re-evaluate the valving and other
engine room components to see what can me reused vs. replaced.
We have been informed that the present pump is in good condition so we am not quoting on
replacement of pump. Labor and Materials will be $35.45,000.
I 3-B) The steel boxes that secure the cylinders to the hull are deteriorated and will need 16,000.00 16,000.00
replacement. Subbase recommends using stainless steel to eliminate the corrosion. Three
years ago we quoted $16,000.00 for both boxes and we will still honor this quote.
1 4) The exhaust system is in a non-repairable condition and needs replacement from the 24,500.00 24,500.00
main engine to the hull outlet. Our quote will include all new piping, flex joints, exhaust
mixers, and new exterior aluminum outlet. When system is complete it will be wrapped
with a removable wire mesh hi-temp blanket. The new system will be much quieter than
the existing exhaust system. Labor and material $21,000.00.
Thank you for your business. Total
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpowtent in fit!! is received.
Balance Due
Page 2
EFTA01205871
Subbase Drydock Inc. Invoice
PO Box 4429/ Parcel 162 Subbase
St. Thomas, USVI, 00803 Date Invoice #
T:(340) 776-2078 Fax:(340)779-8426
4 6812
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
No. Project Terms We accept
checks, major cash, travelers
creel cards,
checks and wired funds. More info
Aim Boscoe Big N/LSJ Barge Upon Completion available regarding wired monies.
a
Qty/Hrs Description Rate Amount
I 5) Engine mounts need to be de-scaled of rust. Bolts holding mounts need to be cleaned or 7,000.00 7,000.00
renewed and alignment from coupling to shaft needs to be checked and adjusted for proper
tolerances. An extensive review was completed of this drive train back in 2012 with repair
recommendations made at that time. I do not know if this problem was solved so to budget
for this I would reserve 5k to 7k for this project. (before exhaust system is finalized this
alignment must be done).
I 6) Stuffing boxes: Subbase was informed that new stuffing boxes are on hand and will be 5,000.00 5,000.00
owner supplied, after haulout removal of hose joining stuffing box to shaft log will reveal
the condition of shaft log. I would reserve 5k for this project.
I Cutless bearings require removal of main shafts and propellers: After removal of coupling, 4,150.00 4,150.00
shafts and props a condition report will follow if drive train is serviceable the routine
maintenance for renewing cutless bearing will only need attention. Labor and material for
this is (both port and starboard) $4,150.00.
I 8) Engine Cooling Grid: Pressure test system and issue report for this service. Reserve 1,200.00 1,200.00
$1,200.00
I 9) Bottom paint and barrier coat: Labor and material $7,500.00. 7,500.00 7,500.00
10) Engine and marine gear - Review upon haul out -- QUOTE WILL BE ISSUED -- 0.00 0.00
I 11) Fuel tank: Cleaning and disposal 2,800.00 2,800.00
Items 12 thru 18 will need more time to evaluate -- QUOTES WILL BE ISSUED --- 0.00
Thank you for your business. Total
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpayment inMI is received.
Balance Due
Page 3
EFTA01205872
Subbase Drydock Inc. Invoice
PO Box 4429/ Parcel 162 Subbase
St. Thomas, USVI, 00803 Date Invoice #
T:(340) 776-2078 Fax:(340)779-8426
4 6812
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
We accept cash,
P.O. No. Project Terms checks, major creel cards, travelers
checks and wired funds. More info
AnwBoscoe Big N/LSJ Barge Upon Completion available regarding wired monies.
Qty/Hrs Description Rate Amount
I 19) Clean engine room: Before any repairs are started clean and degrease entire engine 5,500.00 5,500.00
room, dispose of oily water. After repairs are complete clean and paint engines and any
other areas that were painted. Remove engine hatch covers and assess condition. Make
necessary repairs and reinstall after all. Labor and material $5,500.00
I 20) Hydraulic Tank: Due to severe corrosion of the steel hydraulic tank, Subbase 5,000.00 5,000.00
reccomends replacing tank with new marine grade aluminum tank complete with all
necessary fittings and sight glass to view levels. Labor and Materials.
***One-third due at mobilization, one-third at 50% completion and balance at
completion***
Thank you for your business. Total $150,472.00
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits $-1,000.00
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpayment in full is received.
Balance Due $149,472.00
Page 4
EFTA01205873
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 2006d02d-219c-4437-a508-30f3fdf0fa35
- Storage Key
- dataset_9/EFTA01205870.pdf
- Content Hash
- c685bb17d7d679be50b3b451bd1f6208
- Created
- Feb 3, 2026