Epstein Files

EFTA00858745.pdf

dataset_9 pdf 158.6 KB Feb 3, 2026 3 pages
From: "Jeffrey E." <jeevacation@grnail.com> To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions Date: Wed, 22 Apr 2015 20:40:48 +0000 i suggest that as we are taking down the current shed can we flip the structure and move the builidng closer to the water, as close as we can and then drive into the builidng towards the ocean while creating a natural wind block. On Wed, Apr 22, 2015 at 4:26 PM, Daphne Wallace < wrote: Greetings Sir, John's response: The flat roof is possible. It would have to be a slightly sloping shed, subject to the building's manufacturer. We can design it and show the steel building manufacturer what you want. Respectfully, Daphne On Wed, Apr 22, 2015 at 2:40 PM, jeffrey E. <jeevacation@gmail.com> wrote: on builiding b can we have a flat roof? On Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace < wrote: Greetings Sir, Revisions from John for your review and comments. Respectfully, Daphne Forwarded message From: John P. Woods, AIA Date: Wed, Apr 22, 2015 at 2:03 PM Subject: R.O. & Generator Bld . Revisions To: Daphne Wallace , Cecile de Jongh >, ann rodriquez Daphne, Attached are the revised drawings for the R.O. & Generator Building Roofing project. These changes are based upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exterior sheathing shall be a EFTA00858745 typical metal siding provided by the steel building manufacturer. The eave height of the building shall be reduced to 12 feet to minimize the height of the structure. This will also result in the roll up door height being reduced to 10 feet. 2. The shorter building (Generator Bldg.) will have exterior sheathing that is the typical metal siding provided by the steel building manufacturer. The height will be increased to 20 feet to accommodate a roll up door 16 feet in height. This is the minimum height established by the LSJ maintenance staff to accommodate the roll on roll off activities of the dumpsters. I would like to add some observations regarding the change in heights of the two buildings. For one, it doesn't make sense to minimize the height of one building while the other must be a full 8 feet higher. The Generator building now looks out of proportion with that extra height. What may be more appropriate in my opinion is to consider not roofing where the dumpsters will be located and extend the parapet wall up another 3 — 4 feet to be almost 9 feet above the roof slab. This will do a lot to visually screen the dumpsters. You should also consider replacing the dumpsters with enclosed units that have compactors incorporated into them. Some of these type of dumpsters are presently being used in very visible sites on St. Thomas, particularly at WICO. Finally, I have also included the revised floor plan for the Maintenance & Workshop Building, eliminating the Break Room. JPW This email is free from viruses and malware because avast! Antivirus protection is active. please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved please note EFTA00858746 The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00858747

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
1e7bdcc7-c006-41cb-91d5-3f1156b3f8d1
Storage Key
dataset_9/EFTA00858745.pdf
Content Hash
7e068ed2ca57ddcb0b9705f93f30a99d
Created
Feb 3, 2026