New LSJ-GSJ Mandatory Punchlist 5-17-19 smartsheet
No. Area Items
1 "" MANDATORY ""
LSJ/GSJ Punchlist
Seth Ettinger - Restore
1 LSJ/GSJ Daphne & Anna & More LLC
2 LSJ MC Kitchen Karyna & JE Banquette
3 Master Bedroom Karyna JE Pillow
4 Emergency Room Anna & JE EKG Machine
9 5 Theater Room Anna & JE Blackout Curtains
10 6 Housekeeping Anna Washers
11 7
_ Housekeeping Anna Dryers
12 8 Gym Anna Flooded
13 9 Sam's Place Anna Furniture
14 10 LSJ/GSJ Anna & Daphne Solar Lights
15 11 LSJ/GSJ Anna & Daphne Sun Umbrellas
16 12
Theater Room Anna & Daphne Drapes/Curtains
17 13
LSJ Salt Pond Anna Fountain Light
18 14 LSJ Helipad Anna Medical Kit
19 15 Chillax Room Anna Chillax
Exported on June 20. 2019 7:02:54 AM BOT Page 1 of 27
EFTA01222499
Projected Arrival
Description Initiation Date Order Date Date Start Date
Purchasing, Shipments & Visiting Vendors
Mold Remediation Schedule: Mobilize equipment to Tropical FL 6/5, sail
6/7 - EDA on STT 6/11. Clear, pickup equipment 6/12 - Seth a
(2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1.
Room, 2. Living Room, 3. Office,4. Twin Bedroom, 5. Master Be room.
(2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym. 5/6/2019 6/12/2019 6/13/2019
Project ON HOLD until the decorators come, per JE. Will review with
decorators for different ideas. 5/17/2019
Should know more after our trip on June 3rd. 5/17/2020
Order EKG Machine. JE to advise. 5/17/2021
Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, including the door openings. Awaiting quote
from TJ "Home Theater Market" for Black/Blackout Curtains same
custom measurements as existing panels. Anna's confirmed New
measurements:12 Panels of 9ft Long (108in)
4 Panels of lift 3M Long (135in), All 12 Panels are 4ft Wide (48in).Will
need 16 Panels in Black w/Blackout backing (5/30). 5/17/2022
Order 2 Samsung Washers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ. 5/17/2019 5/17/2019 5/28/2019
Order 2 Samsung Dryers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ. 5/17/2019 5/17/2019 5/28/2019
Gym flooded on 5/30. all equipment moved to R/O Storage on 5/30.
Floor removal began 5/31/2019. 5/21/2019
Order Living room furniture & Kitchen Table 5/17/2019
Solar lights from China - departed from China 5/21 - 45 days to MIA -
EDA FL 7/3. 12/13/2018 12/20/2018 7/27/2019
Order 15 Cream Colored Sun Umbrellas. JE will choose. 5/17/2019
Wrinkle out the Drapes/ Curtains in the Theater. St. Thomas Dry
cleaners do not have a portable steam iron. Myla asked if she can
purchase to do the Job. She knows of a really good steam iron brand. 6/5/2019 5/25/2019
Order lighting for the Saltpond water fountain. Arriving to the Palm
Beach house on 5/30. Arriving on plane 6/3 5/16/2020 5/23/2018 6/3/2019
Purchase Medical items for Helipad Office 5/16/2020 5/23/2018 6/3/2019
Deep Clean Chillax room. Smells funny 6/4/2019
Exported on June 20. 2019 7:02:54 AM BOT Page 2 of 27
EFTA01222500
Tentative Completion
Completion Date Date
6/4/2019
6/4/2019
Exposed on June 20. 2019 7:0234 AM BOT Page 3 of 27
EFTA01222501
No. Area Who Items
21
Michael & Custom Welding
22 17 Welding - Terrance Philip
Welder
23 18 Sylvester & Boniface Large Windows
Ave Palms
24 19 Grotto Peter Elie '?
25 20 New Road Michael & Jeffers Road Project
26 21 Michael & Contractors Hurricane Shutters
LSJ Generator Room
27 22 GSJ Cottage Michael & Contractors Expert Builders
28 23 Peter Elie Helipad
GSJ Helipad
29 24 LSJ Tunnel Michael & Bill Terry Skin it
30 25 Michael & Bill Terry 40x60 Bld.
Wreckshon
31 26 Michael & Contractors 00x00 Bld. ?
HM Storage
32 27 Reefco Vents
LSJ Fuel Room
33 28 Engineering Michael & Contractors Doors
34 29 GSJ Staff Cottage Jeffrey Boschulte Permits
35 30 GSJ Barn Jeffrey Boschulte Permits
36 31 GSJ Terrace Jeffrey Boschulte Permit
37 32 GSJ Pool Extension Jeffrey Boschulte Permit
38 33 Waterfall (Tiki or Park) Peter Elie Slab
39 34 Gym Michael & Contractors Doors
40 35 Flagpole Pool Michael & Contractors Shade Structure
41 36 flagpole Pool Michael & Contractors Freezer
Exported on June 20. 2019 7:02:54 AM BOT Page 4 of 27
EFTA01222502
Description Initiation Date Order Date Projected Arrival Start Date
Date
Hell pad and tunnel gates are installed and ready for wood skin.
engineering and jurassic gates are due to be brought out to LSJ on
Wed., the 12th and installed. the wood skins will start as a carpenter
becomes available, likely mid week next week. 05/28/19
The two side windows are installed, just needing finish plaster. The
large opening door panels are being built. 05/21/19
5/28/19
Ismail scheduled to deliver and begin install by 5/31; will work around
weather. The installation will take around 10-14 work days. 5/31/19
Completion Date ? (6-8 weeks) 8/1/19
Forms and lighting installation complete by 5/25. Concrete pour TBD.
JE advise "H" to be Bigger. JE to review 6/5 5/17/2019
Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
Recommend going with Allied. 5/17/2019
JB reviewed and approved drawings 5/22. MG approval and sign off of
the plans will be sent to Buck Steel 5/24. 5/17/2019
Allied has provided estimate. Waiting on Buck Steel. Recommend going
with Allied. 5/17/2019
Install Vents in Fuel storage room. Dave reduced initial quote by 4500;
ordered 5/24; EDA on STT by June 15th and will then schedule install. 5/17/2019
Install Engineering doors. John Bedminster has estimate forthcoming. 5/17/2019
Staff Cottage - 5/27 JB submitted the CZM Minor Permit Application
Forms for the GSJ Cottage to EK and DKI to review the portions
already filled out; JB noted the portions he needs assistance filling
out/signing, along with a checklist of the items still needed to complete
the application. 5/28 EK completed the permit application, requested
the IRB tax clearance and property tax clearance letter, and asked JE
to sign as noted. EK will notify JB once tax clearance letters back; JB
off-island until 6/2 - on his return will submit the drawings and maps etc
to EK, who will submit the completed application on behalf of the owner. 5/17/2019
Permits: Barn - JB awaiting selection of supplier and specs. 5/17/2019
Build 75 foot round terrace. 5/17/2019
Extend current pool to 80 feet from 15 feet. 5/17/2019
5/17/2019
Bid coming from John Bedminster 5/17/2019
Waiting for three bids: John Bedminster, EB, Mr. Gumbs
JE advised not to order a freezer.
Exported on June 20, 2019 7:02:54 AM BOT Page 5 of 27
EFTA01222503
Tentative Completion
Completion Date Date
5/24/2019
6/21/19
Exported on June 20. 2019 7:02:54 AM BOT Page 6 of 27
EFTA01222504
No. Area Who Items
42 37 Freezer
LSJ TiId Hut Michael & Contractors
43 39 Dock GSJ Amy Dempsey
Permits
44 39 Permits
Dock LSJ Amy Dempsey
45 40 Christmas Cove Moorings Patrick Moorings
46 41 Old Generators
Old Generators Michael & Bill Terry
47 42 Flagpole Pool Michael & Contractors Shade Structure
48 43 Five Palms Franks Electric '?
49 44 Five Palms Peter Elie Concrete
50 45 GSJ R/O Michael & Contractors 2nd RIO Intake
51 46 GSJ New Dock Michael & Jules Dock Expansion
52 47 GSJ New Dock Michael & Jules Water Sport Ramp
53 48 Michael & Paul "Global
LSJ/GSJ Cables Tech" Underwater Cable
54 49 Amy Dempsey Underwater Cable
Permit
55 50
Heavy Machinery Trencher Michael
50 51 LSJ Library Michael Roofing & Trim
57 52 LSJ Tild Hut Michael Kitchen
58
59
BO 53 LSJ MB Bath '7 Shower Tiles
61 54 LSJ Main Compound Sylvester & James Gazebo
62 55 Tunnel Entrance Sylvester & James Tunnel Gate
63 56 LSJ Helipad Sylvester & James Heli Service Gate
64 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box
65 58 GSJ Tiki Terrace Brian Bates Wooden Furniture
Exported on June 20. 2019 7:02:54 AM BOT Page 7 of 27
EFTA01222505
Description Initiation Date Order Date Projected Arrival Start Date
Date
Order Freezer for Tiki hut kitchen: on STT 5/28 - cleared, off-loaded,
awaiting pickup for transport to LSJ. 5/10/2019 5/28/2019
Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock
The permit for the LSJ WAVE ATTENUATOR and Dock is currently
under review by CZM.
Request moorings for Christmas Cove
Sell old Generators: Bill Terry to coordinate sale of the old generators,
Rich to speak with Bill.
Shade structure is replacing need for awning.
Electrical work to be done at Five Palms 5/28/19
Need more direction from JE. He was not pleased with current layout.
Bob Peterson coming 5/23 5/23/19
JE said stop work on 5/21
JE said stop work on 5/21
Nico Shaner and Paul Gandy arrive Sunday, June 2, AA Flight 1391
2:57PM. depart Tuesday, June 4, AA Flight 943 2:41PM. Monday 6/3
review the existing facilities, discuss the recent/previous improvements,
plans for both sides and thoughts on the project approach, etc.
ACOE has reviewed the permits; their comments were addressed by
LSJE; permit expected to be issued in the next 30-45 days.
3 estimates have been submitted to Rich. Mr. Pemberton (STX) owns
and operates a trenching company. Mr. Pemberton would like to
conduct a site visit to review the project prior to submitting a bid. He can
be available week of 6/3. His rental includes the trenching equipment
and an operator.
6/5/19
Order Cohan countertop for Tiki Hut Kitchen 6/5/19
Awaiting quote from John Bedminster, this project involves new shower
hardware, plumbing, and tile work
Build 2 Gazebos at the MC. Mockup design given to Sylvester by JE. 4ft
on each side of the centered 3ft wide door. 5/15/2019
Materials needed to skin the gate frame 5/17/2019
Materials needed to skin the gate frame 5/17/2019
Build Dock Box with Bench similar to Yacht interior. Brian working on
this. Should have better idea 5/31 of completion date. 5/17/2019
Chest is complete. Lighting to be installed by 5/25. 5/17/2019
Exported on June 20. 2019 7:02:54 AM BOT Page 8 of 27
EFTA01222506
Tentative Completion
Completion Date Date
5125119
Exported on June 20. 2019 7:02:54 AM BOT Page 9 of 27
EFTA01222507
No. Area Who Items
66 59 LSJ/GSJ Tiki sheds Brian Bates Thatch
67 60 Barn ? '? Barn
68 61 GSJ Terrace '? Chandelier
69 62 Sam's Place Danny & Keshaun Bedroom
70 63 Holy Shit Point Brian & Ron Structure
71 64 LSJ TildHut Maurice & Boniface Coral Stone
72 65 Cabana 1 Maurice Shower Tile
73 66 Flagpole Pool Sylvester Kickplate
74 67 GSJ Maurice Tiki Bar
75 68 GSJ Guest BR Sylvester Carpet
76 69 GSJ Pool Wooden Steps
77
78
79 70 Tiki Terrace TJ & Oriole Brown Paint
80 71 LSJ Dock TJ & Oriole Polyurethane
81 72 Tunnel TJ & Oriole Roof
82 73 Christmas Cove TJ & Oriole Structure
83 74 Sam's Place TJ & Oriole Bedroom
84 75 Main Compound TJ & Oriole Theater Root
85 GSJ Entrance TJ & Oriole Staircase
86 77 Grotto TJ & Oriole Steps
87 78 Main Compound TJ & Oriole Ceiling
89
90 79 Emergency Room Jermaine & Liston Fax
91 80 LSJ Island Jermaine & Liston Emergency PA System
92 81 GSJ Island Jermaine & Liston Emergency PA System
82 Chillax Jermaine & Liston 82" TV
94 83 Jermaine & Liston
Chillax 82" TV Wall mount
95 Chillax Jermaine & Listion Sound Bar
Exported on June 20. 2019 7:02:54 AM BOT Page I 0 of 27
EFTA01222508
Description Initiation Date Order Date Projected Arrival Start Date
Date
Order thatch to be installed after Hurricane Season. (70) rolls ordered,
on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. 5/17/2019 5/22/2019
Supplier to be awarded 5/17/2019
5/17/2019
Repair Ceiling. Lighting socket needed 6/5/2019
Build Dock structure same as LSJ 5/17/2019
Maurice began tile work today 5/31. 5/17/2019
Shower floor is not draining properly in Cabana 1 6/5/2019
Install Kickplate 6/5/2019
Fix Cabinet & Drawers 6/5/2019
Cut Carpet to size. Carpet to long. Need to be centered under both
beds 5/17/2019
Demo and rebuild new steps. Steps to match existing stairs at the MC 6/6/2019
Deck to be stained 5/17/2019
Polyurathane Boardwalk 5/17/2019
In progress. Repair holes on tunnel roof 5/17/2019
Material to arrive 5/28; work to start 5/28. 5/17/2019
Paint after repairs are made 5/17/2019
Top Coat 5/17/2019
Paint steps in epoxy grey 5/17/2019
Paint steps in white 5/17/2019
Stain ceiling above the White Table 6/5/2019
IM Ilowimmerarnmih
Pending setup of Efax account 5/17/19
Island wide system for intruders 5/17/19 5/23/19
Island wide system for intruders 5/17/19 5/23/19
Order 82" TV for Chillax Room and proper wall mount " 1'5/29/19 -
Pricesmart will have the 82" Samsung in stock 5/16/19 5/23/19
Order a Heavy Duty Wall Bracket to hold the 82" Samsung TV in the
Chillax 6/9/2019
New sound bar for the Chillax 6/17/19 6/18/19 6/18/19 6/19/19
Exposed on June 20. 2019 7:0234 AM BOT Page 11 of 27
EFTA01222509
Tentative Completion
Completion Date Date
5/24119
619/19 6/7/19
6112/19
6/19/19
Exported on June 20. 2019 7:02:54 AM BOT Page 12 of 27
EFTA01222510
No. Area Who Items
Jermaine & Liston LSJ/GSJ WIFI
New WIFI System
Jermaine & Liston
85 GSJ Cameras
98
99
too 86 LSJ Cistern 1 Michael & JCH Cistern Pump
101 87 GSJ R/O Michael & Gemini R/O Container
Seawater Systems
102 88 GSJ Ft/O parts Michael & Gemini RIO Parts
Seawater Systems
103 89 R/O Water Michael & Smiley Water Testing
104
105
106 90 Cabanas 1-4 Danny & Keshawn Dimmers
91 flagpole Pool Danny & Keshawn Dimmers
92 MC New Planter Danny & Keshawn MC Planter & Palm
Tree Lighting
93 Tikl Waterfall Anna, Danny & Keshawn Pond Fountain
113 94 Flagpole Pool Danny & Keshawn Kitchen
111 95 GSJ Peters Point Danny & Keshawn Solar Lights/Other
112 96 Cabana 1 Danny & Keshawn Rope Light
113 97 Master Bedroom Danny & Keshawn Wall Sconce
114 98 GYM Michael & Liston Equipment & Audio
115 99 Chillax Danny & Keshawn Phone Plug
116 100 Sam's Place Danny & Keshaun Bedroom
117
118
Exported on June 20. 2019 7:02:54 AM BOT Page 13 of 27
EFTA01222511
Description Initiation Date Order Date Projected Arrival Start Date
Date
Completion date. [5-29-19 All Will, Access Points and switches and
currently waiting on 5 addition switches to handle the distribution of
existing phone services] [5-29-19] GSJ Wifi is in progress this week] 5/17119 5/23/19
Camera setup at Christmas Cove— Pending Mike to order Yeti Solar
Units and Panels as per email 5/24/19 [5/29/19 GSJ Dock Nest
Camera is active] [6-14-19 - Yeti's arrived at Palm Beach to be shipped
via Tropical] 5/22/19 6/4/19 6/11/19 5/23/19
RIO & Engineering
Order Pump for Cistern 1 for LSJ to complete system. Tyler (JCH)
placed the order for the pump 5/24. Production time is 6 weeks - the
factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
EDA to Tropical FL 7/12. EDA on STT 7/21 5/17/2019 5/24/2019 7/21/2019
On Island on GSJ 5/17/2019
On Island 5/17/2019
5/24 Anna emailed last test results (3/2017).
Lighting & Electrical
Install Dimmers 5/17/2019
Dimmers not working properly 5/17/2019
In progress 5/17/2019
Add Lighting to Water Fountain. Ordered 5/23; scheduled to arrive at
the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house, or on the plane. 5/17/2019 5/23/2019
Run wires and plugs properly. Make hole in cabinets if needed. Plugs
and wires should not be seen 5/17/2019
Lighting facing Peters Point for Safety 5/17/2019
Test in place. JE advise that we order more. Brighter than what's
installed at the moment. 5/17/2019
Wall sconce does not come on around the Master. Timer to be set
6:30pm -5am ? 5/17/2019
Wiring need to be done for GYM Equipment & Audio 6/4/2019
Replace or fix phone/Internet plug in Chillax 6/4/2019
Repair Ceiling. Lighting socket needed 6/5/2019
Plumbing & Reefco
Exported on June 20. 2019 7:02:54 AM BOT Page 14 of 27
EFTA01222512
Tentative Completion
Completion Date Date
6/29/19
6/29/19
Exported on June 20. 2019 7:02:54 AM BOT Page 15 of 27
EFTA01222513
No. Area Who Items
1 10 101 GSJ Master BR Michael & Charlie Master Bath
12 102 Library Reefco Air Handler
izi 103 IT Server Room Reefco A/C Unit
.r 105 Cabana 1-4 Air Conditioning Units Reefco A/C Unit
122 106 GSJ Reefco A/C Unit
107 LSJ Laundry Reefco NC Unit
121-
ize
12 108 LSJ Landscaping Cristobal & Fabian Irrigation
12' 109 GSJ Stones Danny & Renol Stones
Chemicals &
12U 110 LSJ / GSJ Landscaping Dupson & Daphne Landscaping
Equipment
130 Island Wide Landscapers Orange Vines
111
131 112 LSJ Main Compound Danny & Philimon Pillars
132
133
Exported on June 20. 2019 7:0234 AM BOT Page 16 of 27
EFTA01222514
Description Initiation Date Order Date Projected Arrival
Date
No Hot water 5/17/2019
Replace air handler for the Library. Dave ordered 5/27; current lead
time 7-8 weeks plus transit time (4-5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress. 5/17/2019
Temp a/c installed. Board ordered. Waiting on schedule. 5/17/2019
Shipping next week and hopes to have by May 31st. Goal is to install
week of June 3rd. PM already on routine schedule for Cabana 4. 5/17/2019
PM already on routine schedule. Bedroom, Kitchen & Living Room 5/17/2019
Housekeeping NC is not working 6/4/2019
a_ Landscaping, irrigation & Stone walla
Install irrigation for new palms 5/17/2019
Stones from GSJ to LSJ to create and fix all Stone walls 5/17/2019
Order Pesticides & Fertilizer for all plants and palms: Dupson reviewed
inventory - requested only fertilizer and landscaping equipment.
Lawnmower Headquarters quote for Stihl and Silky equipment
approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7. 5/17/2019
Remove all Orange Vines from plants on Island. Main Compound &
Island wide. Orange vines will kill the plants 6/5/2019
Build 10ft. Pillars by the MC new planter 6/5/2019
Wreckshop & Heavy Machinery Operators
Exported on June 20. 2019 7:0234 AM BOT Page 17 of 27
EFTA01222515
Tentative Completion
Completion Date Date
Exported on June 20. 2019 7:02:54 AM BOT Page 18 of 27
EFTA01222516
No. Area Who Items
134 113 HM Equipment Tap & Dale Quadski
135 114 HM Equipment Tap & Dale Fuel Truck / Flatbed
136 115
HM Equipment Tap & Dale Electric Carts
137 117
HM Equipment Tap & Dale Roller
138 118 Old Heavy Machinery Tap & Jules Removal
139 119 GSJ Engineering Shed Jules & Buck Berm
140 117 HM Equipment Tap & Dale Old Roller
141 117 HM Equipment Tap & Dale 307 CAT
142 117 HM Equipment Tap & Dale JE Bike
120 JE Bike Tap Bike Handle
144 121 GSJ Hydroseeder Tap Hydroseeder
145 123 GSJ Jules Trenching
146 124 LSJ Tiki Hut Jules or Peter Tiki Parking
147 125 Wreckshop Rychie Office
148
149
150 126 GSJ Water Front Patrick & Randy Sail Boat
Exported on June 20. 2019 7:02:54 AM BOT Page 19 of 27
EFTA01222517
Description Initiation Date Order Date Projected Arrival Start Date
Date
We are working On the Quadski, 1st - The ECU was not communicating
with the computer - we found an issue with a wire pulled out, now we
are communicating. The initial tests on the Chassis wire harness and
components (Fan, Blowers Throttle Blipper, bilge ) are all working
properly.
The Next thing we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has been worked on. There's no water time
and little land use - The clutch should not be worn out? The machine is
having the fluids replaced and get is started to evaluate why your
mechanic was looking at the clutch!Along with a Battery -Exhaust
Muffler Rubber mount is broken in Half -The Muffler is loose connecting
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seat/Cap is missing - Tire Hub cap is
missing -
Handle Bar assembly - Has been recalled - I sent that request in
immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal is Missing - rubber
seal for fuel pump assy -If things go well the machine could be done by
end of next week - If the clutch needs work add probably another week!
This information will all be on a report - Before we repair we will be
making contact for approval 4/2/2019
Turn Fuel truck into Flatbed 5/17/2019
The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be
sent for undercoating (Rust proofing process) 5/31. 5/17/2019 5/10/2019 6/11/2019
Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ.
MG will schedule barge to pick up directly from Tropical Shipping STT. 5/17/2019
awaiting Barge
Create Berm to block LSJ view across from the RIO Containers
Need to order Solenoids & Alternator. 6/10/20019
Need to order Shanks for the bucket 6/10/2019
12 Rotors (each bike uses (6) 4 in the front and 2 in the back) 6/10/2019
Replace Bike handle 6/6/2019
Axle to be purchased asap 6/6/2019
Trenching Area & Description needed 6/5/2019
Create Parking & Driveway at LSJ Tiki Hut. JE to advise 6/5 5/17/2019
Clean office immediately 6/5 6/4/2019
Marine, Barge & Water Sports
Remove damaged sail boat 5/17/2019
Exported on June 20. 2019 7:02.54 AM COT Page 20 of 27
EFTA01222518
Tentative Completion
Completion Date Date
Exported on June 20. 2019 7:02:54 AM BOT Page 21 of 27
EFTA01222519
No. Area Who Items
151 127 Christmas Cove Patrick & Randy Boat debris
152 128 New Crew Boat Patrick & Randy Crew Boat
153 129 AYH / Big N Boscoe & David Fenders
154 130 - AYH / Big N Boscoe & David Cleats
155 131 AYH/Big N Boscoe & Robert Lemire Blankets
156 132 PR /Big N Boscoe & David PR Repairs
157 133 Nana Randy Offshore
158 134 Nautica Boat - NC, Tubes, Structure Carlos, Patrick & Randy NC
159 135 Spats Boat Patrick & Randy NC
160
161
162 138 GYM Kevin, Garth, & Mike GYM
163
164
165 137 JE Denali Carlos & Caribbean Auto NC
Mart
Exported on June 20. 2019 7:02.54 AM BOT Page 22 of 27
EFTA01222520
Description Initiation Date Order Date Projected Arrival Start Date
Date
Remove boat debris 5/17/2019
5/17/2019
Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
5124. Production lead time is 10 weeks. EDA to production completion
8/2. 5/17/2019 5/24/19
Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3 5/17/2019
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
discharge thru the hull must be made to match the system and two of
the flange blankets were too short and are being re-manufactured.
Weather permitting, still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5. Weather permitting, still possibly Monday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
to support the new Flanders and pipe that was found to be necessary.
Corrosion ate the last ones. Paint is being applied in the favorable
weather. Per Boscoe 6/5 " I'm sorry, I don't have an answer as yet" He's
waiting on Bobby & Boddy's Contractor to give him answers on the
hydraulic. 4/23/2019
Take Nana to Offshore to get the Engines Checked. Per Randy on 6/10
Nana is scheduled to go down to Offshore on 6/18 for Engine Service &
Trim and tilt 6/5/2019
Nautica delivered 5/18/19. Fiberglass modifications in progress on
starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be
shipped off. requested estimate for bow thruster replacement @ $3400
before shippingijust need okay from JEE and Rich to proceed.) this
project can be completed while boat is at Offshore by Island Rigging.
Per Randy on 6110 Tube was removed on 6/8 and ready to ship out to
FL. Will follow up once its delivered to FL. Randy will send photos on
6/11. 5/17/2019 05/18/19
6/4 offshore scheduled maintenance replace both timing belts. sportis
dropped off 830am.... 6/4 work completed at 130pm picked up by PC
6/4. Per Randy on 6/10 Completed. 6/4/19
Cleaning, Organizing & DEMO
Demo Flooring in the GYM 6/3/2019
Vehicles
Dealership diagnosed a leaking hose in the air conditioning system.
Hose ordered 5/29: EDA on STT 5 business days (6/5). A complete
service was performed on the Denali and the rear brake pads changed.
Carlos will schedule the hose install once the part arrives. 5/17/2019
Exported on June 20. 2019 7:02:54 AM BOT Page 23 of 27
EFTA01222521
Tentative Completion
Completion Date Date
8/2/2019
6/15/2019
6/20/2019
6/4/19 614/19
6/6/2019
Exported on June 20. 2019 7:02:54 AM BOT Page 24 of 27
EFTA01222522
No. Area Who Items
Carlos & Cliffs Auto Accident
166 138 LSJ Suburban Repairs
167
168
169
170
171
172
173
174
175
176
Exported on June 20. 2019 7:02:54 AM BOT Page 25 of 27
EFTA01222523
Description Initiation Date Order Date Projected Arrival Start Date
Date
Insurance Coverage & Repairs to be made. Carlos awaiting estimate
from Cliffs Auto Repair - by 5/31. Carlos will take the vehicle to
Guardian 5/30 for adjusters inspection. Per Carlos, Suburban estimate
is ready for pickup 6110. 5/20/2019
Pools & Power Washing
Exported on June 20. 2019 7:0234 AM BOT Page 26 of 27
EFTA01222524
Tentative Completion
Completion Date Date
Exported on June 20. 2019 7:02:54 AM BOT Page 27 of 27
EFTA01222525
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 1d68f5f0-838f-4c98-9eb8-a8c7a8974719
- Storage Key
- dataset_9/EFTA01222499.pdf
- Content Hash
- f7cd8a58b66615d1173e63a59a9d567c
- Created
- Feb 3, 2026