LSJ and GSJ Schedule smartsheet
Aug 19 Aug 26 Sep 16 Sep 23
_A
1 GSJ Projects:
2 North Terrace
3 Collect EB Bids
4 Site Work
5 Underground Electric
6 Wire Mesh ) Reber for Pad
7 Concrete Pour 200 Yards
8 Saw Cuts and Sealing
9 Sign Off (Work Up to Standards)
—
10
11 RO
12 RO Sea Water Intake Pumps
13 RO Genset Bunker
14 Refurbish! Extend O Hut
15 Staff Cottage Refurbish / Expand
16 SC New Cistern I Septic Tank
17 SC Kitchen Cabinets
18 Barge Ramp
19 Main House Septic Tank
20 Back of House Area
21 Dumpster ! Dump Area
22
23
24 LSJ Projects:
25 _Create Concrete Batch Plant
26 Source of Agg
27 Source of Cement
28 Source of sand
29 Location of plant
Exported on August 6. 2018 12:29:46 PM PDT Page I of 9
EFTA00804991
Task Name Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 16 Sep 23
30 Mix designs on Me
31 Reber / Wire / Angles
32
33 Main Compound
34 Pool Plans
35 Pool Shelter
36
37 Master Bedroom
38 Seal exterior walls
39 New roof
40 Extend terrace
41 Remove step
42 Remove and install threshold
43 Refinish floors
New Shower Hardware
Repair Shower (new HW) 777
46 Refinish Shower Floors
47 Septic/Drain Issues
48
49 Library
50 Seal exterior walls
51 New Roof
52 Install Exterior Lighting
53 Replace Windows
54 New Door HW
55
56 Main Kitchen
57 Seal exterior Walls
58 ^ Resurface Cabinets
59 Appliances
60 Roof Structure
Exported on August 6.2018 12:29:46 PM PDT Page 2 of 9
EFTA00804992
Task Name Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 16 Sep 23
61 Effis
62 Toe board and Side Panels on Cabinets
63
64 Gym
65 Seal Exterior walls
66 Replace doors
67 Replace Windows
68 Bathroom Renovation
69
70 Flag Pool Cabana
71 Remove Coral Stone
72 Install Wood Floors
73 Demo I Construct new Shelter
74 Tile Roof
75 Pool Refurbishment
76 Kitchen Remodel
77
78 Cabana 1
79 Seal exterior Walls
80 ^ Install Thresholds
81 Install Doors
82 Enclose Outside Shower
83 Rough Plumbing
Fixtures
65 Tile
86 Cabinets
87 Countedops
88 Electrical
89 Repaint
90 Resurface Floors
91 Move In
Exported on August 6, 2018 12:29:46 PM PDT Pape 3 of 9
EFTA00804993
Task Name Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 16 Sep 23
92
93 Cabana 2
94 Seal exterior Walls
95 Install Thresholds
96 Install Doors
97 Enclose Outside Shows
98 Rough Plumbing
99 Fixtures
100 Tile
101 Tile Showers
102 Cabinets
103 Countertops
104 Electrical
105 Repaint
106 Resurface Floors
107 Move In
108
109 Cabana 3
110 Seal exterior Walls
111 ^ Install Thresholds
112 Install Doors
113 Enclose Outside Shower
110 ^ Rough Plumbing
115 Fixtures
116 Tile
117 Tile Showers
118 Cabinets
119 Countertops
120 Electrical
121 Repaint
122 Repair Bathroom Floor
Exported on August 6, 2018 12:29:46 PM PDT Page 4 of 9
EFTA00804994
Task Name Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 16 Sep 23
123 Resurface Floors
124 Move In
125
128 Cabana 4
127 Seal extedor Walls
128 Install Thresholds
129 Install Doors
130 Enclose Outside Shower
131 Rough Plumbing
132 Fixtures
133 Tile
134 Cabinets
135 Countertops
136 Electrical
137 Repaint
138 Resurface Floors
139 ^ Move In
14C
141 Chilax Room
142 Seal extedor walls
143 Install thresholds
144 Install Door
145 Seal r Abandon Poolside Door
146 Trey Ceiling Design / Build
147 New AC
148 Repaint
149
150 Grass Beds Main Compound
151 Demo / Straighten
152 ElectAcal Demo
153
Exported on August 6, 2018 12:29:46 PM PDT Page 5 of 9
EFTA00804995
Task Name Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 16 Sep 23
154 Tiki House
155 Finish ceilings
156 Kitchen Area renovation
157 Flooring Electrical / Plumbing
15S Larger Stone Apron Front
15I Lighting
160
161 Dock Shelters
162 Cabinets! Countertops / Lighting
163 Lighting Purchase
164 Decking
165
166 Small dock Shelters
167 Railing
168 Planters Plumbing Electric
169 Pour Apron
170
171 Barge Ramp
172 Temp Ramp
173 New Ramp
174 Deadman Piles onshore with Eye
175 Possible underwater excavation
176
177 Roads
178 Roads to be redragged
179 Light Excavation
180
181 Pops Garden
182 ^ New Shade house?
183 Run new Electric
184
Exported on August 6, 2018 12:29:46 PM PDT Rape 6 of 9
EFTA00804996
Task Name Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 16 Sep 23
165 Generator Building
186 New Doors and Hardware
187 Gen 1Refurb
188 Gen 2 Refurb
189 Fuel Tank Vent Lines
190 Fuel Room Fire Caulking
191
192 RO Building
193 Minor Hardware replacement
194 New Door Hinges
195
196 Engineering Building
197 Demo I Construct new Building
198
199 Laundry Facility
2r:', Kitchen and Bath Refurb
a I Laundry Remodel
202
203 Pebble Beach
204 Fishennans Hut
205 New Foundation Pad
206 Site work
207
208 Five Palms
209 New Roof
210 ^ Light Site Work
211 New Windows
212 New Doors
213 ^ New electric / Feader line
214
215 Nursery
Exported on August 6, 2018 12:29:46 PM PDT Page 7 of 9
EFTA00804997
Task Name Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 16 Sep 23
216 replace wood stairs
217 concrete patching
218 painting
219
220 Staff Bathrooms / Gas Station
221 Doors and Hardware replace
222 Window Replacement
223 Plumbing issues
224 Concrete
225 Sewage Treatement Overflow
226
227 Equlptment
228 325 FL
229 307 E2
230 TL1255O
231 272D2
232 Boom Lift
233 Flat bed
234 Dump buck
235 Light towers
236 John Deer Trager
Beach Cleaner
239 Marine
240 Nana
241 Nautica
242 Little C
243 Sportis
244 PDR
245 Zodiac
246 Mini Me 2
Exported on August 6.2018 12:29:47 PM PDT Page 8 of 9
EFTA00804998
Task Name Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 16 Sep 23
247 Jet Skis
Exported on August 6.2018 12:29:47 PM PDT Page 9 of 9
EFTA00804999
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 1c7b55ff-b532-41a5-81cb-f6fb3ef08ad8
- Storage Key
- dataset_9/EFTA00804991.pdf
- Content Hash
- 5b0463f9a42f9dff4eb4e1b43c26be2f
- Created
- Feb 3, 2026